Concrete is checked at site through various methods to ensure its quality and strength.
Visual inspection of concrete surface
Slump test to check consistency
Compression test to check strength
Ultrasonic testing to detect defects
Core testing to check strength and uniformity
Rebound hammer test to check surface hardness
Temperature monitoring during curing process
Checking for proper mix proportions and curing conditions
Verifi...
Free fall in concrete refers to the process of pouring concrete without any external force to assist in its placement.
Free fall is a method of placing concrete where it is allowed to fall from the mixer truck or pump without any external force.
This method is used for small jobs or in areas where access is limited.
It can result in segregation and air pockets in the concrete if not properly managed.
Free fall height shoul...
Grade of concrete refers to the strength of the concrete mix.
Grade of concrete is denoted by the ratio of cement, sand, and aggregate used in the mix.
The strength of concrete increases with the increase in the grade of concrete.
For example, M20 grade of concrete means the mix contains 1 part cement, 1.5 parts sand, and 3 parts aggregate.
Higher grade of concrete is used for structures that require higher strength, such
Select fill material is a type of soil used to fill in areas where the ground needs to be raised or leveled.
Select fill material is typically composed of clay, sand, and gravel.
It is used in construction projects to create a stable base for buildings, roads, and other structures.
The material is carefully selected and tested to ensure it meets specific engineering requirements.
Examples of select fill material include cr...
Embedded length is the length of a reinforcing bar that is embedded in concrete.
It is the length of a reinforcing bar that is embedded in concrete
It is used to provide anchorage to the reinforcement in the concrete
The length is determined by the diameter of the bar and the strength of the concrete
It is important to ensure that the embedded length is sufficient to prevent failure of the structure
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before May 2022. There were 3 interview rounds.
It about Indian civilization
Easy questions to answer the every question
I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.
posted on 17 Aug 2023
I applied via AmbitionBox and was interviewed before Aug 2022. There were 2 interview rounds.
It is very difficult test to pass
I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.
P6 is a project management software used for scheduling, Float is the amount of time an activity can be delayed without delaying the project, Critical activities are tasks that must be completed on time to prevent project delays.
P6 is a software used for project scheduling and management
Float is the amount of time an activity can be delayed without affecting the project deadline
Critical activities are tasks that have z...
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.
Managed various projects including software development, system integration, and process improvement.
Led a team in developing a new software application for streamlining customer data management
Implemented system integration solutions to improve communication between different departments
Executed process improvement initiatives to increase efficiency and reduce costs
Collaborated with cross-functional teams to ensure pr
Continuous learning, growth, challenging projects, leadership opportunities, work-life balance
Continuous learning and skill development through training and certifications
Opportunities for career growth and advancement
Challenging projects that allow for problem-solving and innovation
Leadership opportunities to mentor and guide junior team members
Maintaining a healthy work-life balance to prevent burnout
posted on 2 May 2021
I was interviewed in Nov 2020.
based on 1 interview
Interview experience
based on 5 reviews
Rating in categories
Architect
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
BIM Modeller
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Architect
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Project Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
TCE
Mecon
L&T Technology Services
AECOM