Upload Button Icon Add office photos

Filter interviews by

Al Arrab Contracting Company Electrical Site Engineer Interview Questions and Answers

Updated 20 Jan 2023

Al Arrab Contracting Company Electrical Site Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Assignment 

Calculations, questions related to installation works

Round 3 - Technical 

(2 Questions)

  • Q1. Voltage drop for a cable length of 40m
  • Ans. 

    The voltage drop for a cable length of 40m depends on the cable size, current flow, and resistance.

    • The cable size and current flow determine the resistance of the cable.

    • The resistance of the cable determines the voltage drop.

    • The voltage drop can be calculated using Ohm's Law: V = IR.

    • For example, a 40m length of 2.5mm² cable carrying a current of 10A would have a voltage drop of approximately 1.6V.

  • Answered by AI
  • Q2. Singl line Diagram, cable sizes, power factor and voltage drop calculations and definitions. .
Round 4 - One-on-one 

(2 Questions)

  • Q1. General and experience related
  • Q2. Where you worked before? Give brief of your C.V

Interview Preparation Tips

Interview preparation tips for other job seekers - Be patient, confident and precise in Answering.
Believe in yourself. Decent in dressing and behave good.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Indeed and was interviewed before Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. About working experience
  • Q2. Questions related to Railway OHE works.
  • Q3. Questions related to Railway OHE works

Interview Preparation Tips

Interview preparation tips for other job seekers - Worked in Railway OHE department at L&T LTD and now working in feedback infra pvt ltd on same department at Assam.

I applied via Naukri.com and was interviewed in Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(8 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Share details of your previous job.
  • Q4. Why should we hire you?
  • Q5. Why are you looking for a change?
  • Q6. Where do you see yourself in 5 years?
  • Q7. What are your strengths and weaknesses?
  • Q8. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Thankyou so much for your short listingt my resume and give me a good opportunity dooing for our company.

I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. What is your family background?
  • Q2. Share details of your previous job.
  • Q3. What are your strengths and weaknesses?
  • Q4. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Pre preparation is must to be an engineer I hope that I will
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Aug 2024.

Round 1 - Technical 

(6 Questions)

  • Q1. Why use Steel in Construction works.
  • Ans. 

    Steel is used in construction works due to its strength, durability, versatility, and cost-effectiveness.

    • Steel is known for its high tensile strength, making it ideal for supporting heavy loads in buildings and bridges.

    • Steel is durable and resistant to corrosion, ensuring the longevity of structures.

    • Steel can be easily fabricated into different shapes and sizes, allowing for versatile design options.

    • Steel is cost-effec...

  • Answered by AI
  • Q2. Why Provided Concrete Cover in all Structures Members.
  • Ans. 

    Concrete cover is provided in all structural members to protect the reinforcement bars from corrosion and fire damage.

    • Concrete cover protects the reinforcement bars from corrosion caused by exposure to moisture and chemicals in the environment.

    • It also provides protection against fire damage by acting as a barrier between the reinforcement and the fire.

    • Proper concrete cover helps in maintaining the durability and streng...

  • Answered by AI
  • Q3. How to do Calculate Staircase Steel.
  • Ans. 

    Calculate the amount of steel required for a staircase based on design and dimensions.

    • Calculate the total length of all the steel bars needed for the staircase

    • Determine the diameter and spacing of the steel bars based on design requirements

    • Consider the number of steps and the dimensions of the staircase in the calculation

    • Account for any additional reinforcement needed for structural integrity

    • Consult structural drawings

  • Answered by AI
  • Q4. How do I Find Concrete Workability.
  • Ans. 

    Concrete workability can be determined by conducting a slump test.

    • Conduct a slump test to measure the consistency of the concrete mix.

    • Adjust the water content or use admixtures to achieve the desired workability.

    • Consider factors such as temperature, humidity, and type of aggregates in determining workability.

    • Consult with concrete mix design experts for guidance on achieving the desired workability.

    • Use tools like flow t...

  • Answered by AI
  • Q5. What is Slum test for Concrete.
  • Ans. 

    Slump test is a method to measure the consistency of concrete before it sets.

    • Slump test involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles.

    • The amount of slump indicates the workability of the concrete - higher slump means more workable concrete.

    • The test helps ensure the concrete is of the right consistency for proper placement and compaction.

    • Slump tes...

  • Answered by AI
  • Q6. What is Concrete Mix Design.
  • Ans. 

    Concrete mix design is the process of selecting suitable ingredients and determining their proportions to produce concrete with desired properties.

    • Involves selecting the right combination of materials like cement, aggregates, water, and admixtures

    • Proportions are determined based on desired strength, workability, durability, and other properties

    • Testing and adjusting the mix design to meet project requirements

    • Example: A ...

  • Answered by AI

Site Engineer Interview Questions & Answers

AECOM user image Babalpreet singh

posted on 2 May 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. DAISCUSS ABOUT TECHNICAL ASPECTS OF CIVIL ENGINEERING AND SOFTWARE SKILLS
  • Q2. CODAL PROVISION OF CONCRETE AND COMMANDS OF SOFTWARE
  • Ans. 

    CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.

    • CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.

    • Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work enviourment is very fabulous
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Asking to me...... Only civil engineering questions
  • Q2. Only waste water treatment plants related questions
  • Q3. What is hydro power test of DI pipes...?
  • Ans. 

    Hydro power test of DI pipes is a method to check the strength and integrity of ductile iron pipes under pressure.

    • Hydro power test involves filling the DI pipes with water and pressurizing them to a specified level.

    • The test is conducted to ensure that the pipes can withstand the pressure they will be subjected to in actual use.

    • Leaks or deformations during the test indicate weaknesses in the pipes.

    • The test helps in iden...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Only waste water treatment plants related questions
  • Q2. RCC spun related question
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is System studies
  • Ans. 

    System studies involve analyzing and evaluating the performance of electrical systems to ensure efficiency and reliability.

    • System studies involve analyzing the behavior of electrical systems under different operating conditions.

    • They help identify potential issues and optimize the performance of the system.

    • Examples of system studies include load flow analysis, short circuit analysis, and protection coordination studies.

  • Answered by AI
  • Q2. What is load flow study
  • Ans. 

    Load flow study is a method used in electrical engineering to analyze and calculate the flow of power in an electrical network.

    • Load flow study helps in determining the steady-state operating conditions of a power system.

    • It involves calculating the voltage magnitude and phase angle at each bus in the network.

    • The study considers factors like power generation, transmission line losses, and load demand.

    • It helps in identify...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be truthful. Don't give false experience in resume.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be honest with your years of experience. All information you share will be verified at the time of joining.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Salary discussion and skills realted question.
  • Q2. 24/7 and rotate any across in india
  • Q3. Finally provided offer latter.

Interview Preparation Tips

Interview preparation tips for other job seekers - Site integration and fault management

I was interviewed in Jan 2021.

Interview Questionnaire 

8 Questions

  • Q1. What's your profile in last site
  • Ans. I was looking after internal and external electrification. Relocation of existing services
  • Answered Anonymously
  • Q2. Have you installed transformer and panels
  • Ans. 

    Yes, I have installed transformers and panels in various projects.

    • I have experience in installing transformers and panels in both commercial and residential projects.

    • I am familiar with the wiring and connections required for proper installation.

    • I have worked with different types of transformers such as step-up, step-down, and isolation transformers.

    • I have also installed various types of panels such as distribution pane...

  • Answered by AI
  • Q3. Yes I have done
  • Q4. Do you think can handle ELV package independently
  • Ans. 

    Yes, I have experience handling ELV packages independently.

    • I have worked on multiple projects where I was solely responsible for the ELV package.

    • I am familiar with the design and installation of ELV systems such as fire alarm, CCTV, access control, and PA systems.

    • I have experience coordinating with other trades to ensure proper integration of ELV systems.

    • I am confident in my ability to handle any challenges that may ar

  • Answered by AI
  • Q5. Yes . I can
  • Q6. What's your salary expectation
  • Q7. More than what I am getting currently
  • Q8. Are you willing to relocate

Interview Preparation Tips

Interview preparation tips for other job seekers - Be clear , honest while responding. Dont try to make fake stories about your profile

Al Arrab Contracting Company Interview FAQs

How many rounds are there in Al Arrab Contracting Company Electrical Site Engineer interview?
Al Arrab Contracting Company interview process usually has 4 rounds. The most common rounds in the Al Arrab Contracting Company interview process are Resume Shortlist, Assignment and Technical.
What are the top questions asked in Al Arrab Contracting Company Electrical Site Engineer interview?

Some of the top questions asked at the Al Arrab Contracting Company Electrical Site Engineer interview -

  1. Voltage drop for a cable length of ...read more
  2. Singl line Diagram, cable sizes, power factor and voltage drop calculations and...read more
  3. General and experience rela...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Technologies Interview Questions
3.7
 • 251 Interviews
Saint-Gobain Interview Questions
4.0
 • 170 Interviews
AECOM Interview Questions
4.3
 • 110 Interviews
Worley Interview Questions
4.1
 • 108 Interviews
Bechtel Interview Questions
4.0
 • 65 Interviews
Samsung E&A Interview Questions
4.1
 • 59 Interviews
View all

Al Arrab Contracting Company Electrical Site Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

4.0

Skill development

3.0

Work-life balance

3.0

Salary

4.0

Job security

4.0

Company culture

4.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Civil Site Engineer
3 salaries
unlock blur

₹4 L/yr - ₹4 L/yr

Facade Project Engineer
3 salaries
unlock blur

₹20.5 L/yr - ₹33.5 L/yr

Explore more salaries
Compare Al Arrab Contracting Company with

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.2
Compare

Alstom Transportation

3.7
Compare

Tata Technologies

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview