Upload Button Icon Add office photos

Filter interviews by

Al Arrab Contracting Company Electrical Site Engineer Interview Questions and Answers

Updated 20 Jan 2023

Al Arrab Contracting Company Electrical Site Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Assignment 

Calculations, questions related to installation works

Round 3 - Technical 

(2 Questions)

  • Q1. Voltage drop for a cable length of 40m
  • Ans. 

    The voltage drop for a cable length of 40m depends on the cable size, current flow, and resistance.

    • The cable size and current flow determine the resistance of the cable.

    • The resistance of the cable determines the voltage drop.

    • The voltage drop can be calculated using Ohm's Law: V = IR.

    • For example, a 40m length of 2.5mm² cable carrying a current of 10A would have a voltage drop of approximately 1.6V.

  • Answered by AI
  • Q2. Singl line Diagram, cable sizes, power factor and voltage drop calculations and definitions. .
Round 4 - One-on-one 

(2 Questions)

  • Q1. General and experience related
  • Q2. Where you worked before? Give brief of your C.V

Interview Preparation Tips

Interview preparation tips for other job seekers - Be patient, confident and precise in Answering.
Believe in yourself. Decent in dressing and behave good.

Interview questions from similar companies

I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. What is your family background?
  • Q2. Share details of your previous job.
  • Q3. What are your strengths and weaknesses?
  • Q4. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Pre preparation is must to be an engineer I hope that I will

I applied via Naukri.com and was interviewed in Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(8 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Share details of your previous job.
  • Q4. Why should we hire you?
  • Q5. Why are you looking for a change?
  • Q6. Where do you see yourself in 5 years?
  • Q7. What are your strengths and weaknesses?
  • Q8. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Thankyou so much for your short listingt my resume and give me a good opportunity dooing for our company.

I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 
Round 3 - HR 

(1 Question)

  • Q1. Where do you see yourself in 5 years?

Interview Preparation Tips

Interview preparation tips for other job seekers - Very nice experience held with me and shahpoorji group while interviewing btw us

Interview Questionnaire 

1 Question

  • Q1. Do you know bbs
  • Ans. 

    Yes, BBS stands for Bar Bending Schedule which is a document that provides details of reinforcement steel required for construction.

    • BBS is used in construction to ensure the reinforcement steel is placed correctly.

    • It includes details such as the diameter and length of each steel bar.

    • BBS is important for ensuring the structural integrity and safety of a building.

    • Software programs are available to assist with creating BB...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Impress with your knowledge and experience that's all...speak truth is enough

Interview Questionnaire 

1 Question

  • Q1. He just asked how much will you take?

Interview Preparation Tips

Round: HR Interview
Experience: Nothing much, they are all concerned about money.
Tips: Just tell them as per company standard.

I appeared for an interview before Oct 2020.

Interview Questionnaire 

2 Questions

  • Q1. About operations and maintenance of electrical equipment
  • Q2. I would like to draw your attention to my interview

Interview Preparation Tips

Interview preparation tips for other job seekers - Telephonic interview for technical and non technical questions both

I applied via Naukri.com and was interviewed in Jan 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Electrical Safety ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Best Organisation for interview skills

I applied via Walk-in and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About my job roles and responsibilities

Interview Preparation Tips

Topics to prepare for Megha Engineering & Infrastructures Electrical Supervisor interview:
  • Their profile
Interview preparation tips for other job seekers - Megha engineering and infrastructure LTD is good placement for who looked for hard working and gathering knowledge

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. Asked me my work experience and my education.
Round 2 - HR 

(1 Question)

  • Q1. About My work experince and my education and my knowledge.
Round 3 - One-on-one 

(2 Questions)

  • Q1. About my work experience and my education and my knowledge.
  • Q2. My Interoduction and my

Interview Preparation Tips

Interview preparation tips for other job seekers - I am very honesty and hord working person.

Al Arrab Contracting Company Interview FAQs

How many rounds are there in Al Arrab Contracting Company Electrical Site Engineer interview?
Al Arrab Contracting Company interview process usually has 4 rounds. The most common rounds in the Al Arrab Contracting Company interview process are Resume Shortlist, Assignment and Technical.
What are the top questions asked in Al Arrab Contracting Company Electrical Site Engineer interview?

Some of the top questions asked at the Al Arrab Contracting Company Electrical Site Engineer interview -

  1. Voltage drop for a cable length of ...read more
  2. Singl line Diagram, cable sizes, power factor and voltage drop calculations and...read more
  3. General and experience rela...read more

Tell us how to improve this page.

Al Arrab Contracting Company Electrical Site Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Tata Technologies Interview Questions
3.6
 • 263 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
AECOM Interview Questions
4.2
 • 118 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
View all

Al Arrab Contracting Company Electrical Site Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

4.0

Skill development

3.0

Work-life balance

3.0

Salary

4.0

Job security

4.0

Company culture

4.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Compare Al Arrab Contracting Company with

Tata Technologies

3.6
Compare

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Alstom Transportation

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview