Connections are joints that link structural elements together, transferring loads and ensuring stability.
Connections are crucial in ensuring the stability and safety of a structure.
They transfer loads between structural elements, such as beams, columns, and trusses.
Common types of connections include welded, bolted, and riveted connections.
Properly designed connections are essential for the overall structural integrity
I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.
Fixed connection does not allow rotation at the base plate, while pinned connection allows rotation.
Fixed connection is rigid and does not allow rotation at the base plate.
Pinned connection allows rotation at the base plate.
Fixed connection provides more stability and resistance to lateral forces.
Pinned connection is more flexible and allows for some movement.
Examples: Fixed connection is commonly used in high-rise bui...
The rise is the vertical distance between two consecutive steps, while the tread is the horizontal distance.
The rise is typically around 7-8 inches, while the tread is usually around 10-11 inches.
The rise and tread dimensions are important for ensuring safe and comfortable stair design.
Building codes often dictate the minimum and maximum rise and tread dimensions for safety reasons.
Pitch distance in bolt refers to the distance between the centers of adjacent bolts in a bolted connection.
Pitch distance is typically measured from the center of one bolt to the center of the next bolt in a row.
It is important to maintain consistent pitch distances to ensure proper load distribution and structural integrity.
For example, in a bolted connection with a pitch distance of 2 inches, the centers of adjacent
To create a pipe rack section on both directions.
Identify the location and dimensions for the pipe rack section
Consider the load requirements and support structures
Design the pipe rack section using appropriate materials and connections
Ensure proper spacing and alignment for pipes in both directions
I am a Civil and Structural Designer with experience in designing and drafting structures for various construction projects.
I have a Bachelor's degree in Civil Engineering and a strong background in structural analysis and design.
I have worked on projects ranging from residential buildings to large-scale commercial structures.
I am proficient in using software such as AutoCAD and Revit for creating detailed designs and ...
I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There were 4 interview rounds.
Wide range of aptitude questions including some technical
WAP to find the 2nd maximum number in an array
Sort the array in descending order and return the 2nd element
Iterate through the array and keep track of the maximum and 2nd maximum
Use a priority queue to find the 2nd maximum
Design patterns are reusable solutions to common software design problems.
Design patterns provide a common vocabulary for developers to communicate about solutions to common problems.
They can improve code readability, maintainability, and scalability.
Examples include the Singleton pattern, Factory pattern, and Observer pattern.
SOLID principles are a set of five design principles for writing maintainable and scalable code.
S - Single Responsibility Principle: A class should have only one reason to change.
O - Open/Closed Principle: Software entities should be open for extension but closed for modification.
L - Liskov Substitution Principle: Subtypes should be substitutable for their base types.
I - Interface Segregation Principle: Clients should ...
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
based on 2 interviews
Interview experience
based on 1 review
Rating in categories
Design Engineer
207
salaries
| ₹3.9 L/yr - ₹14.5 L/yr |
Senior Engineer
146
salaries
| ₹8.2 L/yr - ₹26.7 L/yr |
Senior Design Engineer
89
salaries
| ₹7.1 L/yr - ₹18 L/yr |
Engineer
64
salaries
| ₹4.5 L/yr - ₹13.5 L/yr |
Buyer
51
salaries
| ₹4.2 L/yr - ₹16.5 L/yr |
L&T Construction
Shapoorji Pallonji Group
Saint-Gobain
Worley