Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Afcons Infrastructure Team. If you also belong to the team, you can get access from here

Afcons Infrastructure Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Afcons Infrastructure Assistant Manager Interview Questions, Process, and Tips

Updated 17 Feb 2025

Top Afcons Infrastructure Assistant Manager Interview Questions and Answers

View all 6 questions

Afcons Infrastructure Assistant Manager Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Can you provide an overview of yourself?
  • Q2. What types of industrial relations challenges did you encounter during your service tenure?
  • Q3. What is the process for capturing the attendance of staff and workers?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Jan 2024.

Round 1 - Technical 

(5 Questions)

  • Q1. What are the steps involved in preparing the budget for a project?
  • Ans. 

    Steps involved in preparing a project budget

    • Identify all project expenses including labor, materials, equipment, etc.

    • Estimate the cost of each expense item based on historical data or quotes from vendors

    • Allocate funds for unexpected costs or contingencies

    • Determine the timeline for the project and spread out costs accordingly

    • Review and finalize the budget with key stakeholders

  • Answered by AI
  • Q2. What factors are considered in the costing of projects?
  • Ans. 

    Factors considered in project costing include materials, labor, overhead, equipment, and indirect costs.

    • Materials: Cost of raw materials needed for the project.

    • Labor: Cost of labor required to complete the project.

    • Overhead: Indirect costs such as utilities, rent, and administrative expenses.

    • Equipment: Cost of equipment needed for the project.

    • Indirect costs: Miscellaneous costs like permits, insurance, and taxes.

    • Example...

  • Answered by AI
  • Q3. How do you monitor the budget?
  • Ans. 

    I monitor the budget by regularly reviewing expenses, comparing them to projections, and making adjustments as needed.

    • Regularly review expenses to ensure they are in line with the budget

    • Compare actual expenses to budget projections to identify any discrepancies

    • Make adjustments to the budget as needed based on the review and analysis

    • Track spending patterns and identify areas where cost savings can be made

  • Answered by AI
  • Q4. What are indirect costs?
  • Ans. 

    Indirect costs are expenses that are not directly tied to a specific project or department, but still contribute to overall operational costs.

    • Indirect costs are overhead expenses that cannot be easily traced to a specific cost object.

    • Examples include rent, utilities, administrative salaries, and office supplies.

    • These costs are necessary for the business to function, but are not directly attributable to a specific produ...

  • Answered by AI
  • Q5. How can cash flow be effectively monitored?
  • Ans. 

    Cash flow can be effectively monitored by tracking income and expenses, creating cash flow statements, setting up cash flow projections, and using accounting software.

    • Track income and expenses regularly to understand the flow of cash in and out of the business.

    • Create cash flow statements to analyze the sources and uses of cash over a specific period.

    • Set up cash flow projections to forecast future cash flow based on exp...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident; there is no need to skip any questions. Answer all the questions quickly and wisely.

Assistant Manager Interview Questions Asked at Other Companies

asked in Axis Bank
Q1. You are Handling cash operations then how you manage operations w ... read more
asked in JSW Steel
Q2. 1. Whats is Cooling tower performance aspects, Vacuume breaker us ... read more
asked in Jio
Q3. What are the different layers of OSI model?
asked in Adani Group
Q4. What IS Codes do you follow for structural steel fabrication and ... read more
Q5. Why is SAS used of there are other open source tools available?

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Why is steel used along with concrete for RCC
  • Ans. 

    Steel is used along with concrete for RCC to provide tensile strength and prevent cracking.

    • Steel has high tensile strength, while concrete has high compressive strength, so combining them creates a material that can withstand both tension and compression forces.

    • Steel helps to prevent cracking in concrete structures by providing reinforcement against tensile stresses.

    • Steel also helps to increase the ductility of the str...

  • Answered by AI
  • Q2. What is the weight of 1 bag of cement
  • Ans. 

    The weight of 1 bag of cement varies depending on the type and brand, but it is typically around 50-100 pounds.

    • The weight of a bag of cement can range from 40 to 94 pounds.

    • Different types of cement, such as Portland cement or masonry cement, may have different weights per bag.

    • Some brands may offer larger bags of cement that weigh more than the standard 50-94 pounds.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Field Experience
  • Q2. Testing Methodology

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewees must have good knowledge on their past experiences as most of the questions were generally asked from the gained experiences from the past field. Apart from this a good technical knowledge on the basic aspects of civil engineering a one must have such as surveying testing and processes of construction and the steps involved in the execution work etc
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. About technical experience
  • Q2. About self Introduction

Interview Preparation Tips

Topics to prepare for Tata Projects Assistant Manager interview:
  • Concrete Technology
  • Highways
Interview preparation tips for other job seekers - Experience in practical is the prior.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Intermediate level questions they asked

Round 2 - Technical 

(2 Questions)

  • Q1. Questions mostly about our education subjects and basics
  • Q2. Questions about project workI did in my education.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
2-4 weeks
Result
-

I applied via Job Portal

Round 1 - Assignment 

Modelling water supply

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Good technology skill and preparation
  • Q2. Tell me about your self
  • Q3. Tell me about your family

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest and good with skills proper dress and be prepared and descent in ur
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Group interview at video call

Round 3 - HR 

(3 Questions)

  • Q1. Salary negotiation
  • Q2. 2 time salary negotiation
  • Q3. Accommodation and other benifits

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for good answer
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About waterproofing procedure, observation raised and closed by application
  • Q2. Mivan formwork,MEP ,Qaulity assurance

Interview Preparation Tips

Topics to prepare for Shapoorji Pallonji Group Assistant Manager interview:
  • All the finishing and rcc topice

Afcons Infrastructure Interview FAQs

How many rounds are there in Afcons Infrastructure Assistant Manager interview?
Afcons Infrastructure interview process usually has 1 rounds. The most common rounds in the Afcons Infrastructure interview process are Technical and One-on-one Round.
What are the top questions asked in Afcons Infrastructure Assistant Manager interview?

Some of the top questions asked at the Afcons Infrastructure Assistant Manager interview -

  1. What are the steps involved in preparing the budget for a proje...read more
  2. What is the process for capturing the attendance of staff and worke...read more
  3. What factors are considered in the costing of projec...read more

Tell us how to improve this page.

Afcons Infrastructure Assistant Manager Interview Process

based on 4 interviews

Interview experience

5
  
Excellent
View more
Afcons Infrastructure Assistant Manager Salary
based on 105 salaries
₹7.4 L/yr - ₹18 L/yr
34% more than the average Assistant Manager Salary in India
View more details

Afcons Infrastructure Assistant Manager Reviews and Ratings

based on 22 reviews

4.1/5

Rating in categories

4.3

Skill development

3.7

Work-life balance

3.9

Salary

4.2

Job security

3.8

Company culture

3.7

Promotions

3.7

Work satisfaction

Explore 22 Reviews and Ratings
Senior Engineer
485 salaries
unlock blur

₹5 L/yr - ₹19 L/yr

Planning Engineer
197 salaries
unlock blur

₹4.5 L/yr - ₹12 L/yr

Civil Engineer
187 salaries
unlock blur

₹2 L/yr - ₹10.8 L/yr

Executive Engineer
170 salaries
unlock blur

₹3.2 L/yr - ₹12 L/yr

Engineer
153 salaries
unlock blur

₹2.2 L/yr - ₹10.8 L/yr

Explore more salaries
Compare Afcons Infrastructure with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview