General mathematical question like work, force, percentage etc.
Secured advance in client billing is a payment made by the client to the contractor before the work is completed.
It is a form of pre-payment made by the client to the contractor
It is usually made to help the contractor cover the cost of materials and labor before the work is completed
The amount of the secured advance is usually a percentage of the total contract value
The contractor must provide security for the advance...
Shear force max depends on the material and cross-sectional shape of the beam.
Shear force max is the maximum force that a beam can withstand before it fails in shear.
It depends on the material properties of the beam, such as its yield strength and modulus of elasticity.
It also depends on the cross-sectional shape of the beam, such as whether it is rectangular, circular, or I-shaped.
Calculating shear force max requires ...
The wastage percentage varies depending on the type of work.
Wastage percentage for construction work can range from 5% to 20% depending on the type of material used.
For electrical work, the wastage percentage can be around 2% to 5% due to damaged or defective components.
In plumbing work, the wastage percentage can be around 10% to 15% due to incorrect measurements or damaged pipes.
For painting work, the wastage percent...
posted on 2 Jun 2021
I applied via Recruitment Consultant and was interviewed before Jun 2020. There was 1 interview round.
posted on 12 Feb 2024
I applied via LinkedIn and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 26 Nov 2022
I applied via Referral and was interviewed in Oct 2022. There were 3 interview rounds.
General mathematical question like work, force, percentage etc.
Secured advance in client billing is a payment made by the client to the contractor before the work is completed.
It is a form of pre-payment made by the client to the contractor
It is usually made to help the contractor cover the cost of materials and labor before the work is completed
The amount of the secured advance is usually a percentage of the total contract value
The contractor must provide security for the advance...
Shear force max depends on the material and cross-sectional shape of the beam.
Shear force max is the maximum force that a beam can withstand before it fails in shear.
It depends on the material properties of the beam, such as its yield strength and modulus of elasticity.
It also depends on the cross-sectional shape of the beam, such as whether it is rectangular, circular, or I-shaped.
Calculating shear force max requires ...
The wastage percentage varies depending on the type of work.
Wastage percentage for construction work can range from 5% to 20% depending on the type of material used.
For electrical work, the wastage percentage can be around 2% to 5% due to damaged or defective components.
In plumbing work, the wastage percentage can be around 10% to 15% due to incorrect measurements or damaged pipes.
For painting work, the wastage percent...
posted on 2 Jun 2021
I applied via Recruitment Consultant and was interviewed before Jun 2020. There was 1 interview round.
I was interviewed in Aug 2017.
based on 3 reviews
Rating in categories
Project Engineer
256
salaries
| ₹5.5 L/yr - ₹20 L/yr |
Senior Engineer
199
salaries
| ₹7.6 L/yr - ₹30 L/yr |
L2 Engineer
143
salaries
| ₹3.4 L/yr - ₹10 L/yr |
Architect
132
salaries
| ₹4.1 L/yr - ₹14.9 L/yr |
Engineer
127
salaries
| ₹3.2 L/yr - ₹14.5 L/yr |
Jacobs Engineering Group
Fluor Corporation
Bechtel
Worley