i
Advik Hi Tech
Filter interviews by
I applied via Naukri.com and was interviewed before May 2023. There was 1 interview round.
I applied via Referral and was interviewed before Nov 2022. There were 4 interview rounds.
Expected CTC and position should align with industry standards and my experience.
Research industry standards for QA Engineer salaries
Consider my experience, skills, and qualifications
Provide a range rather than a specific number
Express willingness to negotiate based on job responsibilities
8D tool is a problem-solving methodology used in quality management to identify, correct, and prevent recurring problems.
8D stands for Eight Disciplines
It is used to address customer complaints, non-conformances, and other quality issues
The process involves a team-based approach to root cause analysis and corrective action
Examples of tools used in 8D include fishbone diagrams, 5 Whys, and Pareto analysis
The 7 QC tools are a set of techniques used for quality control in manufacturing processes.
Check sheets: Used to collect and analyze data in a systematic way.
Histograms: Visual representation of data distribution.
Pareto charts: Helps identify the most significant factors affecting quality.
Cause-and-effect diagrams: Illustrates the relationship between various factors and a problem.
Scatter diagrams: Shows the relationsh...
To improve QA, focus on automation, continuous testing, collaboration, and feedback loops.
Implement automation testing to increase efficiency and coverage.
Practice continuous testing to catch bugs early in the development cycle.
Encourage collaboration between QA, developers, and other stakeholders.
Establish feedback loops to learn from past mistakes and improve processes.
I applied via Recruitment Consulltant and was interviewed before Sep 2022. There were 3 interview rounds.
CNC machines are computer-controlled machines used for precision machining in various industries.
CNC stands for Computer Numerical Control
Applications include manufacturing of metal, plastic, wood components with high precision
Used in industries like aerospace, automotive, electronics, and medical devices
Can perform complex operations like milling, turning, drilling, and grinding
Improves efficiency, accuracy, and repea
The root cause for components clamp/declamp failure in CNC machines is often due to improper alignment, worn out components, or lack of maintenance.
Improper alignment of components can lead to excessive stress and premature failure
Worn out components such as clamps or bolts can result in decreased clamping force
Lack of regular maintenance can cause build-up of debris or corrosion, affecting the clamping mechanism
Inadeq...
I applied via Referral and was interviewed before Jan 2023. There were 3 interview rounds.
Advik Hi Tech interview questions for popular designations
I applied via Recruitment Consultant
Get interview-ready with Top Advik Hi Tech Interview Questions
I applied via Approached by Company and was interviewed before Sep 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.
I applied via Recruitment Consultant
QMS stands for Quality Management System and TPM stands for Total Productive Maintenance System.
QMS is a set of policies, processes, and procedures required for planning and execution of quality control.
TPM is a maintenance program that aims to maximize equipment effectiveness and minimize downtime.
QMS focuses on meeting customer requirements and improving customer satisfaction.
TPM focuses on improving equipment reliab...
I applied via Walk-in and was interviewed in Jul 2021. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Oct 2021. There were 3 interview rounds.
Yes, I am willing to work on the line side if there's a manpower shortage.
I understand the importance of meeting production goals and deadlines
I am a team player and willing to help out wherever needed
I have experience working on the line side and am comfortable with the tasks involved
Line balancing refers to the process of distributing work evenly across assembly line stations.
Line balancing aims to minimize idle time and maximize productivity.
It involves assigning tasks to each station in a way that ensures smooth flow and avoids bottlenecks.
The goal is to achieve a balanced workload and cycle time for each station.
Line balancing can be achieved through various techniques such as time study, work ...
Top trending discussions
Interview experience
based on 618 reviews
Rating in categories
Senior Engineer
222
salaries
| ₹3.2 L/yr - ₹7.1 L/yr |
Quality Engineer
121
salaries
| ₹1.4 L/yr - ₹4.5 L/yr |
Assistant Manager
117
salaries
| ₹5.7 L/yr - ₹10.5 L/yr |
Production Engineer
88
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Engineer
86
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
Bosch
UNO Minda
Bharat Forge
Mahindra & Mahindra