i
Advik Hi
Tech
Filter interviews by
MSA stands for Measurement System Analysis. It is a study that evaluates the measurement system to ensure its accuracy, precision, and reliability.
MSA helps identify sources of variation in the measurement process
It involves assessing the measurement system's accuracy, precision, and stability
Common tools used in MSA include Gage R&R studies and control charts
Quality refers to the standard of excellence or superiority of a product or service.
Quality is meeting or exceeding customer expectations
It involves consistency in performance and reliability
Quality is achieved through adherence to standards and continuous improvement
Examples: precise measurements in CNC machining, defect-free products, high customer satisfaction
Toll Rance diamantion refers to the measurement of the diameter of a hole or opening using a tool called a dial gauge.
Toll Rance diamantion is a method used in machining to ensure accurate measurements of hole diameters.
It involves using a dial gauge to measure the diameter of a hole or opening.
The measurement is typically taken at multiple points around the circumference of the hole to ensure accuracy.
5S is a workplace organization method that uses a list of five Japanese words: seiri, seiton, seiso, seiketsu, and shitsuke.
5S stands for Sort, Set in order, Shine, Standardize, Sustain.
It is a method used to organize the workplace for efficiency and effectiveness.
Examples include organizing tools, materials, and workstations, cleaning and maintaining cleanliness, and establishing standard procedures for organization.
Top trending discussions
I applied via Campus Placement and was interviewed before Apr 2020. There was 1 interview round.
posted on 2 Apr 2021
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
Designing PLC logic for controlling a motor with a single switch for both start and stop functions.
Use a toggle switch to alternate between start and stop states.
Implement a latch circuit in the PLC to remember the last state.
Example: When the switch is pressed, if the motor is off, turn it on; if it's on, turn it off.
Consider using timers to prevent rapid toggling that could damage the motor.
Implemented new quality control measures to reduce defects and improve product reliability.
Introduced a new inspection process to catch defects earlier
Trained employees on proper quality control techniques
Updated equipment to improve accuracy and precision
Collaborated with suppliers to ensure consistent quality of raw materials
I applied via Walk-in and was interviewed before Oct 2022. There were 3 interview rounds.
Work and wages, Time speed Distance
Working process in time
The least value of a scale refers to the smallest measurement or unit on the scale.
The least value of a scale is the smallest increment or division that can be measured on that scale.
For example, on a scale that measures weight in grams, the least value may be 1 gram.
In a scale that measures temperature in Celsius, the least value may be 0.1 degree Celsius.
Understanding the least value of a scale is important for accur...
I applied via Newspaper Ad and was interviewed before Nov 2023. There was 1 interview round.
I have 5 years of experience working as a mechanical engineer in the automotive industry.
Designed and implemented new components for vehicle engines
Performed stress analysis and simulations to ensure product durability
Collaborated with cross-functional teams to troubleshoot and resolve technical issues
Managed projects from concept to production, meeting strict deadlines
I have worked on various projects including designing a new software system for a manufacturing company and implementing a renewable energy solution for a residential building.
Designed a new software system for a manufacturing company to streamline production processes
Implemented a renewable energy solution for a residential building to reduce energy costs and environmental impact
Collaborated with a team of engineers t...
I applied via Walk-in and was interviewed in Nov 2024. There were 6 interview rounds.
Experienced engineer with a background in mechanical and electrical engineering, specializing in project management and problem-solving.
Bachelor's degree in Mechanical Engineering from XYZ University
5+ years of experience working in the automotive industry
Proficient in CAD software such as SolidWorks and AutoCAD
Led a team of engineers to successfully launch a new product line
The toolroom is typically organized in a hierarchical structure with a manager overseeing toolmakers and machinists.
Typically led by a Toolroom Manager who oversees the operations
Toolmakers and machinists report to the Toolroom Manager
May have specialized teams for different types of tools or machinery
Collaborates closely with engineering and production departments
Mold maintenance involves regular cleaning, inspection, and repair of molds used in manufacturing processes.
Regularly clean molds to prevent buildup of residue or contaminants
Inspect molds for wear and tear, cracks, or other damage
Repair any issues found during inspection to ensure molds function properly
Store molds properly when not in use to prevent damage or contamination
Encourage a positive culture that fosters the development of new ideas and activities for improvement.
Corrective action is taken to address an existing issue, while preventive action is taken to avoid potential issues in the future.
Corrective action is reactive, addressing problems that have already occurred.
Preventive action is proactive, aiming to prevent problems from happening in the first place.
Corrective action focuses on fixing the root cause of a problem.
Preventive action focuses on identifying and eliminating ...
Preventive maintenance is scheduled maintenance performed on a regular basis to prevent breakdowns, while predictive maintenance uses data and analytics to predict when equipment will fail.
Preventive maintenance is scheduled at regular intervals to prevent breakdowns.
Predictive maintenance uses data and analytics to predict when equipment will fail.
Preventive maintenance is time-based, while predictive maintenance is c...
Breakdown maintenance is a type of maintenance where equipment is only repaired after it has broken down.
Breakdown maintenance is reactive in nature, as repairs are only done after a breakdown occurs.
It can lead to increased downtime and production losses.
This type of maintenance is usually more costly compared to preventive maintenance.
Examples include fixing a machine only when it stops working or repairing a vehicle...
The frequency of preventive maintenance varies depending on the equipment and industry standards.
Frequency of preventive maintenance is typically determined by equipment manufacturer recommendations.
Some industries may have specific regulations or standards that dictate the frequency of preventive maintenance.
Factors such as usage, environmental conditions, and criticality of the equipment can also influence the freque...
Lifter pad and lifter are different components used in mechanical systems.
Lifter pad is a component used to support and lift heavy objects, while lifter is a device used to lift and move objects vertically.
Lifter pads are often made of rubber or other materials to provide cushioning and grip, while lifters can be hydraulic, pneumatic, or mechanical.
Lifter pads are stationary and provide a stable base for lifting, while...
The frequency of tool life refers to how often a tool needs to be replaced or maintained.
Frequency of tool life is determined by factors such as material being worked on, cutting speed, and tool material.
Higher cutting speeds or harder materials may require more frequent tool changes.
Regular maintenance and monitoring can help extend tool life and reduce frequency of replacements.
based on 2 interview experiences
based on 4 reviews
Rating in categories
Senior Engineer
219
salaries
| ₹3.4 L/yr - ₹7.5 L/yr |
Assistant Manager
118
salaries
| ₹5.2 L/yr - ₹10.5 L/yr |
Quality Engineer
100
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Engineer
86
salaries
| ₹2.5 L/yr - ₹4.2 L/yr |
Production Engineer
84
salaries
| ₹1.6 L/yr - ₹4.5 L/yr |
Delphi TVS
Motherson Automotive Technologies and Engineering
Belrise Industries
Krishna Maruti