DPT stands for Dye Penetrant Testing in the Non-Destructive Testing (NDT) process.
DPT is a method used to detect surface-breaking defects in non-porous materials.
The process involves applying a liquid dye penetrant to the surface of the material, allowing it to seep into any cracks or defects.
After a certain dwell time, excess penetrant is removed and a developer is applied to draw out the penetrant from the defects, m...
Erection sequence refers to the order in which components of a structure are assembled to ensure stability and safety.
Erection sequence typically starts with the foundation and then progresses to the structural frame.
Next, walls and floors are added followed by roof installation.
Finally, finishing touches such as windows, doors, and interior fittings are completed.
An example of erection sequence for a building would be...
Erection productivity in structure refers to the efficiency and speed at which the construction of a building or infrastructure is completed.
Erection productivity is influenced by factors such as skilled labor availability, equipment efficiency, and project management.
Efficient planning and coordination among different teams can improve erection productivity.
Using prefabricated components can also help speed up the ere...
Erection tolerance for a column refers to the acceptable level of deviation from verticality or straightness.
Erection tolerance is typically specified in the project's design or construction documents.
Common erection tolerances for columns are around 1/500 to 1/1000 of the column height.
Tolerances may vary based on the material of the column and its intended use.
Erection tolerance ensures structural integrity and aesth
Various codes are applicable for structure erection depending on the country and type of structure.
The International Building Code (IBC) is commonly used in the United States for structural requirements.
Eurocode is used in European countries for structural design and construction.
British Standards (BS) are also commonly used in the UK for structural engineering.
Local building codes and regulations may also apply depend
A lift plan for erection is a detailed plan outlining the process of safely lifting and placing heavy equipment or materials during construction.
Identify the weight and dimensions of the equipment or materials to be lifted
Determine the location for the lift and assess any obstacles or hazards
Select the appropriate lifting equipment such as cranes or hoists
Calculate the load capacity and ensure it does not exceed the eq...
How many manpower is required for complete the 500mt erection in one month.
Seeking new challenges and growth opportunities in a larger organization.
Desire for career advancement
Looking for new challenges
Seeking opportunities for professional growth
Interested in a larger organization with more resources
Want to broaden my skill set
My expected CTC is negotiable based on the responsibilities and benefits offered for the Deputy Manager position.
My expected CTC is based on industry standards and my experience level.
I am open to discussing the salary range during the interview process.
I am looking for a competitive salary package with additional benefits such as health insurance and performance bonuses.
I applied via Approached by Company and was interviewed in Feb 2024. There was 1 interview round.
The critical piping welding procedure for main steam and HRH line joints involves several steps to ensure proper joint integrity and safety.
Preparation of the welding area by cleaning and removing any contaminants
Selection of appropriate welding materials and techniques based on the specific requirements of the joint
Welding of the joint using approved procedures and qualified welders
Inspection of the weld to ensure it ...
Alkali flushing and steam blowing are procedures used to clean pipelines and equipment in power plants and industrial settings.
Alkali flushing involves circulating a solution of alkali through the pipelines to remove impurities and deposits.
Steam blowing uses high-pressure steam to remove any remaining debris and ensure the pipelines are clean and ready for operation.
Both procedures are essential for maintaining the ef...
I applied via Referral and was interviewed before Feb 2022. There were 3 interview rounds.
Piling work involves driving piles into the ground to provide support for structures. The procedure includes several steps.
Site preparation and surveying
Pile installation using equipment such as pile drivers or hydraulic hammers
Testing and inspection of piles to ensure they meet design specifications
Cutting and capping of piles to finish the installation process
Backfilling and site restoration
Examples of piling work in...
Top trending discussions
I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.
Planning for execution and laying of bituminous involves detailed scheduling, coordination, and quality control.
Develop a detailed project plan outlining tasks, timelines, and resources required
Coordinate with suppliers for timely delivery of materials
Ensure proper equipment and manpower are available for the execution
Implement quality control measures to ensure the final product meets specifications
Regularly monitor p...
posted on 20 Dec 2024
I applied via Walk-in and was interviewed before Feb 2023. There was 1 interview round.
posted on 28 Apr 2022
Yes, I have dealt with fatal accidents in my previous role as HR Manager.
I have provided support to employees and their families during such incidents
I have worked with management to ensure proper communication and support is provided to affected employees
I have also reviewed and updated safety protocols to prevent future incidents
For example, in one instance, an employee passed away due to a workplace accident and I w...
Factory acts are laws that regulate the working conditions in factories.
Factory acts are designed to protect the health and safety of workers.
They typically cover issues such as working hours, breaks, and safety equipment.
Examples of factory acts include the Factory Act of 1833 in the UK and the Occupational Safety and Health Act in the US.
I was interviewed in Jun 2021.
posted on 28 Nov 2024
I applied via Company Website and was interviewed before Nov 2023. There was 1 interview round.
The temperature needed for BC laying is typically around 70-75 degrees Fahrenheit.
The ideal temperature for BC laying is between 70-75 degrees Fahrenheit
Maintaining a consistent temperature is important for successful BC laying
Extreme temperatures can negatively impact the BC laying process
P&M Quality objectives focus on improving product and manufacturing quality standards.
Implementing quality control measures to ensure products meet specifications
Continuous monitoring and analysis of production processes for quality improvement
Training employees on quality standards and best practices
Setting specific quality targets to achieve measurable improvements
Regularly reviewing and updating quality objectives b...
I applied via Company Website and was interviewed in Sep 2024. There was 1 interview round.
Unit weight of steel is typically around 7850 kg/m^3.
Unit weight of steel is commonly expressed in kg/m^3.
The unit weight of steel can vary depending on the type of steel being used.
For example, the unit weight of mild steel is approximately 7850 kg/m^3.
Shuttering level can be checked using a spirit level to ensure it is horizontal or vertical.
Use a spirit level to check if the shuttering is horizontal or vertical
Ensure the bubble in the spirit level is centered to indicate level
Adjust the shuttering as needed to achieve the correct level
Check multiple points along the shuttering to ensure consistency
based on 3 interviews
Interview experience
based on 10 reviews
Rating in categories
Assistant Manager
106
salaries
| ₹6.5 L/yr - ₹14.6 L/yr |
Deputy Manager
70
salaries
| ₹10.1 L/yr - ₹20 L/yr |
Associate Manager
57
salaries
| ₹13.4 L/yr - ₹25 L/yr |
Senior Engineer
38
salaries
| ₹5.7 L/yr - ₹12 L/yr |
Manager
27
salaries
| ₹19.9 L/yr - ₹33 L/yr |
GMR Group
Larsen & Toubro Limited
Tata Projects
Reliance Infrastructure