Round 1 - HR 

(2 Questions)

  • Q1. Your experience
  • Ans. 

    I have 5 years of experience working as an Electrical Project Engineer in the construction industry.

    • Managed multiple electrical projects from conception to completion

    • Collaborated with architects, contractors, and clients to ensure project requirements were met

    • Performed electrical design calculations and created project plans

    • Ensured projects were completed on time and within budget

    • Troubleshooted and resolved any electri

  • Answered by AI
  • Q2. Which field maximum u r job profile
  • Ans. 

    My job profile is primarily in the field of electrical engineering.

    • My job profile primarily involves electrical engineering projects

    • I work on designing, implementing, and overseeing electrical systems

    • I am responsible for ensuring projects are completed on time and within budget

    • Examples of projects include power distribution systems, lighting systems, and control systems

  • Answered by AI

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed in Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Electrical related

Interview Preparation Tips

Interview preparation tips for other job seekers - Cable gland tramination how cable maggring panels related drawings asked electrical equipment installation
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Coding Test 

It was basic level coding question. you can answer if you strong in basic level of java

Round 3 - HR 

(1 Question)

  • Q1. Why CTS? are u willing to work in any location? expected salary?
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2024. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. What is the salary date??
  • Q2. Work balance life employment??
Round 2 - One-on-one 

(2 Questions)

  • Q1. Group discussion
  • Q2. Good how is salary high
Round 3 - Aptitude Test 

Face interview when it will be there??

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Dec 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. Procedure about maintenance
  • Ans. 

    Maintenance procedures involve regular inspections, testing, and repairs to ensure equipment functionality and safety.

    • Regularly schedule maintenance tasks to prevent breakdowns and ensure equipment longevity

    • Conduct thorough inspections to identify potential issues before they escalate

    • Keep detailed records of maintenance activities and equipment history

    • Train staff on proper maintenance procedures and safety protocols

    • Uti...

  • Answered by AI
  • Q2. Knowledge about LOTO
  • Q3. Haw to maintain a battery bank
  • Ans. 

    To maintain a battery bank, regular inspections, proper charging, temperature control, and monitoring electrolyte levels are essential.

    • Perform regular inspections to check for signs of corrosion, leaks, or damage

    • Ensure proper charging by following manufacturer's guidelines and avoiding overcharging

    • Control temperature to prevent overheating or freezing, which can reduce battery life

    • Monitor electrolyte levels and top up ...

  • Answered by AI
  • Q4. Asking about ptw
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Cable laying process
  • Ans. 

    The cable laying process involves planning, trenching, installation, and testing for effective electrical distribution.

    • Planning: Assess the route and determine cable type based on load requirements.

    • Trenching: Excavate the ground to lay cables, ensuring proper depth and width.

    • Installation: Place cables in trenches, using protective conduits if necessary.

    • Backfilling: Cover the cables with soil, ensuring no sharp objects ...

  • Answered by AI
  • Q2. Transformers testing
  • Q3. Oil filtration process

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Discussion about the profile
Round 3 - Technical 

(1 Question)

  • Q1. Site reporting manager ask questions as per core relevants.
Round 4 - Client Interview 

(1 Question)

  • Q1. Ask all technical questions regarding the core relevant areas

Interview Preparation Tips

Interview preparation tips for other job seekers - Very easy process

I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Planning for execution and laying of bituminous
  • Ans. 

    Planning for execution and laying of bituminous involves detailed scheduling, coordination, and quality control.

    • Develop a detailed project plan outlining tasks, timelines, and resources required

    • Coordinate with suppliers for timely delivery of materials

    • Ensure proper equipment and manpower are available for the execution

    • Implement quality control measures to ensure the final product meets specifications

    • Regularly monitor p...

  • Answered by AI
  • Q2. About bituminous laying

Interview Preparation Tips

Interview preparation tips for other job seekers - Production and asphalt laying

I applied via Campus Placement and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Everything in your resume questions from your domain and 1 quizzes

Interview Preparation Tips

Interview preparation tips for other job seekers - Completely prepare your resume

I applied via Campus Placement and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Completely in the resume and mostly depends upon the hr

Interview Preparation Tips

Interview preparation tips for other job seekers - Study coding and your department related stuff

Adani Infra Interview FAQs

How many rounds are there in Adani Infra Electrical Project Engineer interview?
Adani Infra interview process usually has 1 rounds. The most common rounds in the Adani Infra interview process are HR.

Tell us how to improve this page.

Adani Infra Electrical Project Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

J&F Interview Questions
3.7
 • 30 Interviews
Eversendai Interview Questions
3.7
 • 28 Interviews
J K Fenner Interview Questions
3.9
 • 27 Interviews
View all

Fast track your campus placements

View all
Adani Infra Electrical Project Engineer Salary
based on 4 salaries
₹4.2 L/yr - ₹6.6 L/yr
At par with the average Electrical Project Engineer Salary in India
View more details

Adani Infra Electrical Project Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

5.0

Skill development

3.0

Work-life balance

4.0

Salary

4.0

Job security

1.0

Company culture

2.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
109 salaries
unlock blur

₹6.5 L/yr - ₹14 L/yr

Deputy Manager
74 salaries
unlock blur

₹10.1 L/yr - ₹19 L/yr

Associate Manager
59 salaries
unlock blur

₹13.4 L/yr - ₹25 L/yr

Senior Engineer
41 salaries
unlock blur

₹6 L/yr - ₹12 L/yr

Manager
28 salaries
unlock blur

₹19.9 L/yr - ₹33 L/yr

Explore more salaries
Compare Adani Infra with

Patel Infrastructure

3.9
Compare

CTS Consulting & Technical Support

3.7
Compare

J K Fenner

3.9
Compare

Saudi Binladin Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview