LOD stands for Limit of Detection and LOQ stands for Limit of Quantification. They are important parameters in analytical chemistry.
LOD is the lowest concentration of an analyte that can be reliably detected but not necessarily quantified.
LOQ is the lowest concentration of an analyte that can be reliably measured and quantified with acceptable accuracy and precision.
LOD is typically determined as the concentration corr...
LOQ level can be determined through statistical methods and experimental data.
Calculate the standard deviation of the blank samples.
Multiply the standard deviation by 3.3 to get the LOQ level.
Ensure that the LOQ level is higher than the LOD level.
Validate the LOQ level through spike recovery experiments.
Use appropriate statistical software for accurate calculations.
I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.
Present company own job profile
Acme Formulation interview questions for popular designations
I applied via Naukri.com and was interviewed before May 2023. There was 1 interview round.
Following standard operating procedures (SOP) for efficient work processes in the warehouse.
Understand and follow all SOPs provided by the company.
Maintain cleanliness and organization in the warehouse.
Use equipment and tools according to SOPs to ensure safety and efficiency.
Report any deviations from SOPs to the supervisor immediately.
Regularly review and update SOPs as needed.
Example: Following specific procedures fo...
I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
Questions about quality control work
I applied via Naukri.com and was interviewed in Apr 2021. There were 5 interview rounds.
I applied via Walk-in and was interviewed in Mar 2021. There were 5 interview rounds.
I applied via Company Website
Leak test is performed by subjecting the product to a specific pressure and observing for any pressure drop over a specified time period.
Select appropriate equipment for the test
Set the pressure and time parameters as per the product specifications
Connect the product to the equipment and initiate the test
Observe for any pressure drop during the test period
Record the results and take necessary actions if the product fai
Top trending discussions
based on 9 interviews
Interview experience
based on 128 reviews
Rating in categories
Officer
74
salaries
| ₹1.6 L/yr - ₹4.1 L/yr |
Senior Officer
63
salaries
| ₹2.8 L/yr - ₹5.2 L/yr |
Executive
37
salaries
| ₹3.6 L/yr - ₹6.8 L/yr |
Senior Executive
30
salaries
| ₹4.3 L/yr - ₹8.6 L/yr |
Ipqa Officer
18
salaries
| ₹2.5 L/yr - ₹3.8 L/yr |
Sun Pharmaceutical Industries
Cipla
DRJ & CO
Biocon Limited