The number of segments in one ring depends on the design and specifications of the tunnel project.
Number of segments can vary based on tunnel diameter
Segments are typically made of concrete or other durable materials
Segments are used to form the tunnel lining for structural support
Example: A tunnel with a diameter of 10 meters may have 6 segments per ring
Top trending discussions
I was interviewed in Dec 2024.
Calculator for material quantity on site material
posted on 27 Jan 2025
I was interviewed in Jul 2024.
I applied via Walk-in and was interviewed in Jun 2024. There were 4 interview rounds.
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
posted on 22 Mar 2024
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
posted on 12 Mar 2024
I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.
SOLAR ENERGY RELETED CIVIL CONSTRUCTION DISCUSSION
Solar system refers to the collection of planets and other objects that orbit around a star, typically referring to our own solar system with the Sun at its center.
The solar system consists of the Sun, eight planets, moons, asteroids, comets, and other celestial bodies.
The planets in our solar system are Mercury, Venus, Earth, Mars, Jupiter, Saturn, Uranus, and Neptune.
The Sun is the central star of our solar system, p...
posted on 30 Apr 2024
I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.
M4 in Planning refers to a milestone that marks the completion of a significant phase or deliverable in a project schedule.
M4 is typically used in project management to signify a key point in the project timeline.
It is often associated with the completion of a major task or the achievement of an important project milestone.
M4 can help track progress, identify potential delays, and ensure that the project stays on sched...
I will break down the 300 km laying project into smaller sections, assign resources, estimate durations, and create a detailed schedule.
Break down the project into manageable sections such as 10 km segments
Assign resources including equipment, manpower, and materials to each section
Estimate durations for each activity based on historical data or industry standards
Create a detailed schedule using a scheduling software l...
How will you provide schedule of WTP
based on 1 review
Rating in categories
Assistant Manager
216
salaries
| ₹3 L/yr - ₹10.1 L/yr |
Field Engineer
131
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Manager
125
salaries
| ₹6.5 L/yr - ₹19 L/yr |
Site Engineer
90
salaries
| ₹2.7 L/yr - ₹7 L/yr |
Engineer
68
salaries
| ₹3 L/yr - ₹7.5 L/yr |
Megha Engineering & Infrastructures
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company