Round 1 - Technical 

(3 Questions)

  • Q1. Size of brick nominal
  • Ans. 

    The nominal size of a brick refers to its standard dimensions.

    • The nominal size of a brick is typically larger than its actual size due to the inclusion of mortar joints.

    • In the United States, the nominal size of a standard brick is 8 inches by 4 inches by 2 ¼ inches.

    • However, the actual size of a brick can vary depending on factors such as manufacturing tolerances and regional standards.

  • Answered by AI
  • Q2. Cube test of concrete
  • Ans. 

    Cube test of concrete is a method to determine the compressive strength of concrete.

    • Cube test is performed by casting concrete cubes of standard size and curing them for a specific period.

    • After the curing period, the cubes are subjected to compressive load using a compression testing machine.

    • The maximum load applied to the cube is recorded and the compressive strength is calculated.

    • Cube test helps in assessing the qual...

  • Answered by AI
  • Q3. Slab thickness of minimum
  • Ans. 

    The minimum slab thickness depends on several factors such as the load it needs to support, the span between supports, and the type of material used.

    • The minimum slab thickness is determined by structural calculations and design codes.

    • It is important to consider the live load, dead load, and any additional loads that the slab will be subjected to.

    • The span between supports also affects the minimum slab thickness. Longer ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good job and Responsibility on this site
Cube test, Slump test of the correct test
And measurements is the acurecy of 0.00

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Aug 2024.

Round 1 - Technical 

(6 Questions)

  • Q1. Why use Steel in Construction works.
  • Ans. 

    Steel is used in construction works due to its strength, durability, versatility, and cost-effectiveness.

    • Steel is known for its high tensile strength, making it ideal for supporting heavy loads in buildings and bridges.

    • Steel is durable and resistant to corrosion, ensuring the longevity of structures.

    • Steel can be easily fabricated into different shapes and sizes, allowing for versatile design options.

    • Steel is cost-effec...

  • Answered by AI
  • Q2. Why Provided Concrete Cover in all Structures Members.
  • Ans. 

    Concrete cover is provided in all structural members to protect the reinforcement bars from corrosion and fire damage.

    • Concrete cover protects the reinforcement bars from corrosion caused by exposure to moisture and chemicals in the environment.

    • It also provides protection against fire damage by acting as a barrier between the reinforcement and the fire.

    • Proper concrete cover helps in maintaining the durability and streng...

  • Answered by AI
  • Q3. How to do Calculate Staircase Steel.
  • Ans. 

    Calculate the amount of steel required for a staircase based on design and dimensions.

    • Calculate the total length of all the steel bars needed for the staircase

    • Determine the diameter and spacing of the steel bars based on design requirements

    • Consider the number of steps and the dimensions of the staircase in the calculation

    • Account for any additional reinforcement needed for structural integrity

    • Consult structural drawings

  • Answered by AI
  • Q4. How do I Find Concrete Workability.
  • Ans. 

    Concrete workability can be determined by conducting a slump test.

    • Conduct a slump test to measure the consistency of the concrete mix.

    • Adjust the water content or use admixtures to achieve the desired workability.

    • Consider factors such as temperature, humidity, and type of aggregates in determining workability.

    • Consult with concrete mix design experts for guidance on achieving the desired workability.

    • Use tools like flow t...

  • Answered by AI
  • Q5. What is Slum test for Concrete.
  • Ans. 

    Slump test is a method to measure the consistency of concrete before it sets.

    • Slump test involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles.

    • The amount of slump indicates the workability of the concrete - higher slump means more workable concrete.

    • The test helps ensure the concrete is of the right consistency for proper placement and compaction.

    • Slump tes...

  • Answered by AI
  • Q6. What is Concrete Mix Design.
  • Ans. 

    Concrete mix design is the process of selecting suitable ingredients and determining their proportions to produce concrete with desired properties.

    • Involves selecting the right combination of materials like cement, aggregates, water, and admixtures

    • Proportions are determined based on desired strength, workability, durability, and other properties

    • Testing and adjusting the mix design to meet project requirements

    • Example: A ...

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Design of beam and column
  • Ans. 

    Designing beams and columns involves determining the size, material, and layout to support the required loads.

    • Consider the type of structure and the loads it will bear

    • Calculate the required dimensions and reinforcement based on structural analysis

    • Select appropriate materials such as steel or concrete

    • Ensure proper connections and detailing for stability and safety

  • Answered by AI
  • Q2. Condition of limit state of servicibility
  • Ans. 

    Limit state of serviceability refers to the condition where a structure is still functioning properly without any excessive deflection or deformation.

    • Limit state of serviceability ensures that a structure remains usable and safe for occupants.

    • It involves checking factors like deflection, vibration, cracking, and durability.

    • For example, a bridge should not deflect excessively under the weight of traffic to maintain serv...

  • Answered by AI

Site Engineer Interview Questions & Answers

AECOM user image Babalpreet singh

posted on 2 May 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. DAISCUSS ABOUT TECHNICAL ASPECTS OF CIVIL ENGINEERING AND SOFTWARE SKILLS
  • Q2. CODAL PROVISION OF CONCRETE AND COMMANDS OF SOFTWARE
  • Ans. 

    CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.

    • CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.

    • Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work enviourment is very fabulous
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Structural site questions
  • Q2. Fhinishing questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Site engineer for villa stectur work from Shalimar one world
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Practical work related question, Civil engineering related question
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Salary discussion and skills realted question.
  • Q2. 24/7 and rotate any across in india
  • Q3. Finally provided offer latter.

Interview Preparation Tips

Interview preparation tips for other job seekers - Site integration and fault management
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Cube test of concrete
  • Ans. 

    Cube test is a method to determine the compressive strength of concrete.

    • Concrete cubes are casted and cured for 28 days before testing.

    • The cubes are then placed in a compression testing machine.

    • The maximum load that the cube can bear before failure is recorded.

    • The compressive strength of the concrete is calculated using the formula: compressive strength = maximum load/area of cube face.

    • The cube test is an important qua

  • Answered by AI
  • Q2. Meaning of ESR CWR and steel IS code
  • Ans. 

    ESR stands for Earth System Research, CWR stands for Crop Water Requirement, and steel IS code refers to Indian Standard code for steel.

    • ESR is a research program that studies the Earth's climate system and its changes over time.

    • CWR is the amount of water needed by crops to grow and produce a good yield.

    • Steel IS code refers to the Indian Standard code for steel, which provides guidelines for the production and use of st

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Concrete test and bbs must know for site job and safety advice for labor also
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. How to select a conductor?
  • Ans. 

    Conductors are selected based on factors like material, size, insulation, and current carrying capacity.

    • Consider the material of the conductor (e.g. copper, aluminum)

    • Determine the size of the conductor based on the current it will carry

    • Choose the appropriate insulation for the conductor based on the environment it will be used in

    • Ensure the conductor has the required current carrying capacity for the application

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - see terms and conditions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Initial and final setting time for cement.
  • Ans. 

    Initial setting time is the time taken for the cement to harden to a certain degree, while final setting time is the time taken for the cement to completely harden.

    • Initial setting time is typically around 30 minutes to 1 hour after adding water to the cement.

    • Final setting time is usually around 2 to 4 hours after adding water to the cement.

    • Setting time can vary based on the type of cement and environmental conditions.

    • S

  • Answered by AI
  • Q2. What is bleeding?
  • Ans. 

    Bleeding is the process of air escaping from fresh concrete mix and rising to the surface.

    • Bleeding occurs when water in the concrete mix rises to the surface due to settlement of solid particles.

    • It can lead to surface defects if not properly managed.

    • Bleeding can be reduced by using proper mix design and techniques like vibration or adding admixtures.

    • Excessive bleeding can weaken the surface of the concrete.

    • Examples: Wa...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Shapoorji Pallonji Group Site Engineer interview:
  • Technical Skills

A V Construction Co Interview FAQs

How many rounds are there in A V Construction Co Site Engineer interview?
A V Construction Co interview process usually has 2 rounds. The most common rounds in the A V Construction Co interview process are Resume Shortlist and Technical.
What are the top questions asked in A V Construction Co Site Engineer interview?

Some of the top questions asked at the A V Construction Co Site Engineer interview -

  1. Size of brick nomi...read more
  2. Slab thickness of mini...read more
  3. Cube test of concr...read more

Tell us how to improve this page.

A V Construction Co Site Engineer Salary
based on 12 salaries
₹2.3 L/yr - ₹3.5 L/yr
21% less than the average Site Engineer Salary in India
View more details

A V Construction Co Site Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

4.0

Skill development

5.0

Work-Life balance

4.0

Salary & Benefits

4.0

Job Security

5.0

Company culture

5.0

Promotions/Appraisal

4.0

Work Satisfaction

Explore 1 Review and Rating
Site Engineer
12 salaries
unlock blur

₹2.3 L/yr - ₹3.5 L/yr

Senior Engineer
4 salaries
unlock blur

₹4.2 L/yr - ₹5.8 L/yr

Junior Engineer
4 salaries
unlock blur

₹2.2 L/yr - ₹3.9 L/yr

Civil Site Engineer
4 salaries
unlock blur

₹1.7 L/yr - ₹3.8 L/yr

Civil Engineer
4 salaries
unlock blur

₹2 L/yr - ₹3.1 L/yr

Explore more salaries
Compare A V Construction Co with

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.2
Compare

Alstom Transportation

3.8
Compare

Tata Technologies

3.7
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview