I applied via Recruitment Consulltant and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Lap Length in steel.
  • Ans. 

    Lap length is the amount of overlap between two reinforcing bars in a concrete structure.

    • It is necessary to provide lap length to ensure the transfer of stresses from one bar to another.

    • The lap length depends on the diameter of the bars, the grade of steel, and the type of structure.

    • For example, in a beam, the lap length is usually 50 times the diameter of the bar.

    • In columns, the lap length is usually 40 times the diam...

  • Answered by AI
  • Q2. Cover block sizes in different RCC work
  • Ans. 

    Cover blocks are used to maintain the distance between the reinforcement steel and the formwork in RCC work.

    • Cover blocks come in different sizes depending on the thickness of the concrete cover required.

    • For example, for a 20mm cover, a 20mm cover block is used.

    • For a 25mm cover, a 25mm cover block is used.

    • The size of the cover block should be such that it can withstand the weight of the reinforcement steel and the concr...

  • Answered by AI
  • Q3. How many types of scaffolding
  • Ans. 

    There are 5 types of scaffolding commonly used in construction.

    • The five types of scaffolding are: suspended, supported, rolling, aerial, and hanging bracket.

    • Suspended scaffolding is hung from the roof of a building and is commonly used for window washing or painting.

    • Supported scaffolding is built from the ground up and is commonly used for construction or maintenance work.

    • Rolling scaffolding is supported by wheels and ...

  • Answered by AI
  • Q4. Standard size of brick
  • Ans. 

    Standard size of brick is 190mm x 90mm x 90mm.

    • The standard size of brick varies from country to country.

    • In the UK, the standard size of brick is 215mm x 102.5mm x 65mm.

    • In the US, the standard size of brick is 203mm x 92mm x 57mm.

    • Bricks can also come in different shapes and sizes for specific purposes.

  • Answered by AI
  • Q5. Formula of cutting length in beam steel
  • Ans. 

    Cutting length in beam steel formula

    • Cutting length = Development length + Lap length - (2 x Bend deduction)

    • Development length = 0.87 x fy x d / (4 x σst)

    • Lap length = (diameter of bar x 2) + 10 mm

    • Bend deduction = 2 x diameter of bar

    • fy = Yield strength of steel

    • d = Depth of beam

    • σst = Permissible stress in steel

  • Answered by AI

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is a beam ?
  • Ans. 

    A beam is a structural element that is designed to resist loads applied perpendicular to its longitudinal axis.

    • Beams are commonly used in construction to support loads over a span.

    • They can be made of various materials such as wood, steel, or concrete.

    • Beams can be classified based on their shape, such as I-beams, H-beams, or T-beams.

    • The design of a beam takes into account factors like span length, load requirements, and

  • Answered by AI
  • Q2. What is the Defrance between king post and qween post ?
  • Ans. 

    King post and queen post are both types of trusses used in construction, with king post being a simpler design and queen post being a more complex design.

    • King post is a simple vertical member in a truss, while queen post is a pair of vertical members connected by a horizontal member.

    • Queen post trusses are stronger and can span longer distances compared to king post trusses.

    • King post trusses are commonly used in small s...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Dilip Buildcon Junior Engineer Civil interview:
  • Management
  • Team Management
  • Excel
Interview preparation tips for other job seekers - A civil engineer is always a seeker.
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - Group Discussion 

Our Work related what we are doing in Construction explain

Interview Preparation Tips

Interview preparation tips for other job seekers - Nothing
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before May 2018. There were 2 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What is Your Current Sallary.
  • Ans. 

    I am currently earning $60,000 per year.

    • My current salary is $60,000 per year.

    • I am satisfied with my current salary.

    • I believe my salary reflects my experience and qualifications.

  • Answered by AI
  • Q2. Expected salary
  • Q3. Negotiable sallary how much you negotiate.
  • Q4. Yourself Introduction.
  • Q5. About Your projects, experience and some technical question . I.e. procedure of work , productivity of workman and how to start your activities etc.

Interview Preparation Tips

You should be confident don't be nervous and Give your best.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. What is Tension
  • Ans. 

    Tension is a force that pulls or stretches an object.

    • Tension is a type of mechanical stress that occurs when an object is pulled or stretched.

    • It is a force that acts in the opposite direction of compression.

    • Tension is commonly seen in structures like bridges and cables.

    • Examples of tension include a rope being pulled taut or a rubber band being stretched.

  • Answered by AI
  • Q2. What is compression
  • Ans. 

    Compression is the action of applying pressure to reduce the size or volume of an object or material.

    • Compression is a force that squeezes or presses an object or material together.

    • It is commonly used in civil engineering to test the strength of materials like concrete or soil.

    • Compression can cause materials to deform or break if the force applied is too great.

    • Examples of compression include the weight of a building pre...

  • Answered by AI

Skills evaluated in this interview

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How to find grades of concrete which is already mixed
  • Ans. 

    Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.

    • Perform a slump test to determine the workability of the concrete mix.

    • Take samples from the mixed batch and cast test specimens for compressive strength testing.

    • Conduct compressive strength tests on the specimens to determine the grade of concrete.

    • Compare the test results with the standar

  • Answered by AI
  • Q2. What are the site and laboratory test on bricks and cement
  • Ans. 

    Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.

    • Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.

    • Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.

    • Site tests for cement include checking the color, sm...

  • Answered by AI
  • Q3. Plastering work calculation for different size of wall
  • Ans. 

    Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.

    • Calculate the surface area of the wall by multiplying the height and length of each wall segment.

    • Determine the total surface area to be plastered by adding up the surface areas of all wall segments.

    • Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.

    • Consi...

  • Answered by AI

I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Brick work plaster work tile work flooring work cladding work
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in Mar 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Civil relatable like bbs
  • Q2. Civil site excavation

Interview Preparation Tips

Interview preparation tips for other job seekers - Requesting for job Civil site engineer like water supply project
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. I am civil foreman my total experience in 15 years
  • Q2. My experience in structure work most MNB, MJB, ROB, flyover, bridge and metro work
  • Q3. My interview is any question structure work
  • Q4. Sir plz your questions I am answer
  • Q5. I am nothing question
Round 3 - Aptitude Test 

My aptitude in working aptitude nothing people attitude

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir my advice is working in progress
And first quality and safety and progress
Total Workman PPE and toolbox most daily basis workplace

I applied via Walk-in and was interviewed in Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is a aluminium formwork? , Knowledge of mivan and it's part, questions related to drowning,and types of drowning i reffer, BBS related questions, alignment,level, Steel bar
  • Q2. What is mix design? Use of mix design at different construction project.
  • Ans. 

    Mix design is the process of determining the proportions of ingredients to be used in concrete or asphalt.

    • Mix design ensures the desired strength and durability of the construction material.

    • It takes into account factors such as the type of aggregate, cement, water, and admixtures.

    • Mix design is used in various construction projects such as buildings, roads, bridges, and dams.

    • For example, a mix design for a high-rise bui...

  • Answered by AI
  • Q3. Batching plant test of concrete
  • Ans. 

    Batching plant test of concrete is a process to ensure the quality of concrete before it is used in construction.

    • Batching plant test involves checking the strength, workability, and consistency of concrete.

    • Tests are conducted on samples of concrete taken from the batching plant.

    • Tests include slump test, compressive strength test, and water-cement ratio test.

    • Results of the tests are compared with the specifications to e...

  • Answered by AI
Round 3 - HR 

(3 Questions)

  • Q1. Accommodation related
  • Q2. Perivous company CTC
  • Q3. Previous company details

Interview Preparation Tips

Topics to prepare for TCE Civil Site Engineer interview:
  • Aluminium
  • Concrete
  • Formwork
  • Adavance construction knowledge
Interview preparation tips for other job seekers - Knowledge of Indian standard code is must
I have to Concrete mix design knowledge
Knowledge of mivan shuttering and parts
Quality of material

VP Construction Interview FAQs

How many rounds are there in VP Construction Civil Engineer 1 interview?
VP Construction interview process usually has 2 rounds. The most common rounds in the VP Construction interview process are Resume Shortlist and Technical.
What are the top questions asked in VP Construction Civil Engineer 1 interview?

Some of the top questions asked at the VP Construction Civil Engineer 1 interview -

  1. Cover block sizes in different RCC w...read more
  2. Formula of cutting length in beam st...read more
  3. How many types of scaffold...read more

Tell us how to improve this page.

VP Construction Civil Engineer 1 Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 740 Interviews
Tata Projects Interview Questions
4.2
 • 422 Interviews
KEC International Interview Questions
4.0
 • 296 Interviews
Tata Technologies Interview Questions
3.6
 • 257 Interviews
TCE Interview Questions
3.8
 • 246 Interviews
View all

VP Construction Civil Engineer 1 Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

4.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Site Engineer
5 salaries
unlock blur

₹3.4 L/yr - ₹7 L/yr

Civil Site Engineer
4 salaries
unlock blur

₹1.7 L/yr - ₹4.3 L/yr

Explore more salaries
Compare VP Construction with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview