Filter interviews by
I applied via Recruitment Consulltant and was interviewed before May 2022. There were 2 interview rounds.
Lap length is the amount of overlap between two reinforcing bars in a concrete structure.
It is necessary to provide lap length to ensure the transfer of stresses from one bar to another.
The lap length depends on the diameter of the bars, the grade of steel, and the type of structure.
For example, in a beam, the lap length is usually 50 times the diameter of the bar.
In columns, the lap length is usually 40 times the diam...
Cover blocks are used to maintain the distance between the reinforcement steel and the formwork in RCC work.
Cover blocks come in different sizes depending on the thickness of the concrete cover required.
For example, for a 20mm cover, a 20mm cover block is used.
For a 25mm cover, a 25mm cover block is used.
The size of the cover block should be such that it can withstand the weight of the reinforcement steel and the concr...
There are 5 types of scaffolding commonly used in construction.
The five types of scaffolding are: suspended, supported, rolling, aerial, and hanging bracket.
Suspended scaffolding is hung from the roof of a building and is commonly used for window washing or painting.
Supported scaffolding is built from the ground up and is commonly used for construction or maintenance work.
Rolling scaffolding is supported by wheels and ...
Standard size of brick is 190mm x 90mm x 90mm.
The standard size of brick varies from country to country.
In the UK, the standard size of brick is 215mm x 102.5mm x 65mm.
In the US, the standard size of brick is 203mm x 92mm x 57mm.
Bricks can also come in different shapes and sizes for specific purposes.
Cutting length in beam steel formula
Cutting length = Development length + Lap length - (2 x Bend deduction)
Development length = 0.87 x fy x d / (4 x σst)
Lap length = (diameter of bar x 2) + 10 mm
Bend deduction = 2 x diameter of bar
fy = Yield strength of steel
d = Depth of beam
σst = Permissible stress in steel
Top trending discussions
posted on 1 Dec 2024
I applied via AmbitionBox and was interviewed in Nov 2024. There were 4 interview rounds.
Management is fully supported in the department, providing resources and guidance to ensure success.
Management provides clear goals and expectations for the team
Regular check-ins and feedback sessions are conducted to support employee growth
Resources such as training programs and tools are readily available for employees
Management encourages open communication and collaboration among team members
posted on 21 Dec 2024
I managed inventory of various items in the store, including working side areas.
Managed inventory of products and supplies
Organized and maintained stock levels
Handled incoming and outgoing shipments
Ensured proper storage and labeling of items
Performed regular inventory checks and audits
posted on 7 Dec 2024
I applied via Naukri.com
I was interviewed in Dec 2024.
It is easy for both aptitude and core subjects.
posted on 28 Nov 2024
I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Nov 2024. There were 5 interview rounds.
Behaviour and believe to inform decisions
Details account information and development of the person
Slove tha coding problem
Further details and self information sharing and openly speaking skills test
Good ssjjdd jdhd dhebd dhdjd dhdhe jsjs HD shhd
I am a recent graduate with a degree in Business Administration and a passion for marketing and project management.
Recent graduate with a degree in Business Administration
Passionate about marketing and project management
Strong communication and organizational skills
Experience in internships and extracurricular activities
Materials used in road construction include asphalt, concrete, gravel, and crushed stone.
Asphalt is a common material used for road surfaces due to its durability and flexibility.
Concrete is often used for highways and major roads because of its strength and longevity.
Gravel is used for rural roads and driveways as a cost-effective option.
Crushed stone is used as a base layer for roads to provide stability and drainage...
Strength required for construction of a bridge includes structural stability, load-bearing capacity, and durability.
Structural stability to withstand various forces such as wind, traffic, and seismic activity
Load-bearing capacity to support the weight of vehicles, pedestrians, and other loads
Durability to resist corrosion, weathering, and wear over time
Materials like steel, concrete, and composite materials are commonl
General instructions for building construction involve following safety regulations, using proper materials, and ensuring structural integrity.
Ensure compliance with building codes and regulations
Use quality materials to ensure durability and longevity
Follow proper construction techniques to ensure structural integrity
Ensure proper foundation and support for the building
Consider environmental factors and sustainability...
The tallest height is the highest point above a given level or surface.
Height is a measurement of how tall something is
The tallest height on Earth is the summit of Mount Everest at 29,032 feet
Height can also refer to the highest point reached by something like a rocket or airplane
posted on 1 Jan 2025
I applied via Referral and was interviewed in Dec 2024. There were 3 interview rounds.
The company currently has 150 employees working.
The company has a total of 150 employees currently working.
The number of employees may vary due to hiring or resignations.
It is important to keep track of the current employee count for reporting purposes.
The project is working in multiple countries.
The project is currently active in 10 countries.
Each country has its own team of workers.
The project requires coordination between different countries for smooth operation.
based on 3 reviews
Rating in categories
Site Engineer
5
salaries
| ₹3.4 L/yr - ₹7 L/yr |
Civil Site Engineer
4
salaries
| ₹1.8 L/yr - ₹4.3 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures