Filter interviews by
I applied via Referral and was interviewed before Sep 2023. There were 2 interview rounds.
About coil winding
Transformer winding technician
Before starting transformer winding, it is important to consider various factors to ensure successful completion.
Understand the winding specifications provided
Ensure all necessary materials and tools are available
Calculate the number of turns required for each winding layer
Follow proper winding techniques to prevent short circuits
Check for any defects or damage in the transformer core
There are mainly two types of winding - lap winding and wave winding.
Lap winding involves connecting the end of one coil to the start of the next coil in a series connection.
Wave winding involves connecting the end of one coil to the start of the next coil in a parallel connection.
Other types include spiral winding, disc winding, and crossover winding.
posted on 8 Jan 2025
I applied via Company Website and was interviewed in Dec 2024. There were 3 interview rounds.
Regular maintenance implementations are crucial for ensuring the smooth operation of equipment and preventing costly breakdowns.
Regularly schedule maintenance tasks such as equipment inspections, lubrication, and calibration.
Keep detailed records of maintenance activities and equipment performance to identify trends and potential issues.
Train maintenance staff on proper procedures and best practices to ensure efficient...
posted on 20 Dec 2024
Experienced site supervisor with a background in construction management and a proven track record of successfully overseeing projects.
Over 5 years of experience in site supervision
Strong knowledge of construction processes and safety regulations
Effective communication skills with team members and clients
Managed multiple projects simultaneously, ensuring deadlines were met
Implemented cost-saving measures without compro
I am passionate about leading teams and ensuring projects are completed successfully.
I have a strong background in construction and project management.
I enjoy the challenge of overseeing multiple tasks and problem-solving on site.
I am motivated by the opportunity to mentor and develop team members.
I thrive in fast-paced environments and am dedicated to delivering high-quality results.
My strengths include strong leadership skills, excellent communication abilities, and a proactive approach to problem-solving.
Strong leadership skills
Excellent communication abilities
Proactive approach to problem-solving
One of my weaknesses is that I can be overly critical of my own work, which can sometimes lead to perfectionism.
I tend to be a perfectionist and can spend too much time on a task to ensure it is flawless.
I have difficulty delegating tasks as I prefer to handle things on my own to ensure they are done correctly.
I can be overly self-critical, which can affect my confidence in certain situations.
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
I would prioritize and efficiently manage the documentation work while also finding ways to automate or streamline the process.
Prioritize tasks based on importance and deadlines
Look for opportunities to automate or streamline documentation processes
Delegate tasks if possible to ensure efficiency
Maintain clear communication with team members and stakeholders
Seek feedback and continuously improve documentation quality
I applied via Company Website and was interviewed in Nov 2024. There were 3 interview rounds.
I am interested to Aptitude test
posted on 29 Dec 2024
My greatest strength is my ability to troubleshoot complex technical issues efficiently and effectively.
Strong problem-solving skills
Attention to detail
Ability to work well under pressure
Excellent communication skills
Experience in handling challenging projects
Yes, I am a good leader with strong communication skills, ability to motivate and inspire team members, and experience in managing projects.
Strong communication skills to effectively convey goals and expectations to team members
Ability to motivate and inspire team members to achieve project objectives
Experience in managing projects and leading teams to successful completion
Lead by example and actively participate in pr
How to deliver our project on time to costumer with minimum cost
I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.
Spray line work involves operating and maintaining fire hoses and nozzles to extinguish fires.
Spray line work includes connecting hoses to water sources, aiming nozzles at the base of the fire, and controlling water flow.
Firefighters must be trained in proper techniques for using spray lines to effectively combat fires.
Regular maintenance of hoses and nozzles is essential to ensure they function properly during emergen
A fire protection system that uses water mist to suppress fires
Spray system uses fine water droplets to extinguish fires
It is effective in suppressing fires in enclosed spaces
Commonly used in areas where traditional sprinkler systems may cause water damage
Examples include high-pressure water mist systems and low-pressure water mist systems
A jockey pump is a small pump used to maintain pressure in a fire protection system.
Jockey pumps are typically used in conjunction with larger fire pumps to ensure a constant pressure in the system.
They are usually set at a lower pressure than the main fire pump to prevent frequent starts and stops.
Jockey pumps are often used in high-rise buildings, industrial facilities, and other locations where maintaining pressure ...
I applied via Walk-in and was interviewed in Nov 2024. There were 2 interview rounds.
Safety work of area involves implementing safety measures to prevent accidents and ensure a safe working environment.
Conduct regular safety inspections of the work area
Provide safety training to all workers
Enforce the use of personal protective equipment (PPE)
Implement safety protocols and procedures
Maintain clear and accessible emergency exits
Ensure proper storage and handling of hazardous materials
based on 5 reviews
Rating in categories
Technician
4
salaries
| ₹2.8 L/yr - ₹6 L/yr |
Assistant Electrical Design Manager
3
salaries
| ₹10.1 L/yr - ₹15 L/yr |
Suzlon Group
Adani Power
NTPC
Adani Group