Filter interviews by
Clear (1)
I applied via Naukri.com and was interviewed before Jan 2024. There were 2 interview rounds.
CFM stands for Cubic Feet per Minute and is a measurement of the volume of air that a compressor can deliver.
CFM is a common measurement used to rate the airflow of compressors.
It indicates how much air the compressor can deliver in one minute.
CFM is important in determining the efficiency and capacity of a compressor.
For example, a compressor with a CFM rating of 10 can deliver 10 cubic feet of air per minute.
A PM check sheet for a compressor is a document outlining scheduled maintenance tasks to prevent breakdowns and ensure optimal performance.
Includes tasks such as checking oil levels, inspecting filters, testing safety features
Helps identify potential issues before they become major problems
Ensures compressor operates efficiently and extends its lifespan
A basic hydraulic circuit consists of a pump, reservoir, control valves, actuators, and return line.
Start with a pump to generate hydraulic pressure
Connect the pump to a reservoir to store hydraulic fluid
Include control valves to regulate the flow of fluid
Add actuators like cylinders or motors to convert hydraulic energy into mechanical work
Complete the circuit with a return line to send the fluid back to the reservoir
Gearboxes are mechanical devices used to transmit power from one component to another by changing the speed, torque, and direction of rotation.
Gearboxes contain gears that mesh together to transmit power
They are used in various applications such as automobiles, industrial machinery, and wind turbines
Gearboxes can change the speed, torque, and direction of rotation
Common types of gearboxes include spur, helical, bevel,
A screw rod is a type of fastener that has a helical ridge, or thread, wrapped around a cylindrical shaft.
Screw rods are commonly used in construction, machinery, and furniture assembly.
They are often made of metal, such as steel or brass.
Screw rods come in various sizes and thread types, including coarse and fine threads.
They are used to fasten objects together by turning the rod into a threaded hole or nut.
Screw rods...
I have attended big breakdowns related to conveyor belt failures, motor malfunctions, and hydraulic system leaks.
Conveyor belt failure due to excessive wear and tear
Motor malfunction caused by overheating
Hydraulic system leak leading to loss of pressure
A preventive maintenance check sheet for a hydraulic power pack includes inspecting fluid levels, checking for leaks, testing pressure levels, and examining filters.
Inspect fluid levels and top up if necessary
Check for leaks in hoses and connections
Test pressure levels to ensure they are within specified range
Examine filters and replace if dirty or clogged
I create and maintain engineering documentation such as equipment manuals, schematics, and maintenance logs.
Creating equipment manuals for new machinery
Updating schematics to reflect changes in equipment
Maintaining maintenance logs to track repairs and preventative maintenance
Documenting troubleshooting procedures for common issues
Ensuring all documentation meets regulatory standards
I am a dedicated Maintenance Engineer with 5 years of experience in troubleshooting and repairing industrial equipment.
5 years of experience in maintenance engineering
Skilled in troubleshooting and repairing industrial equipment
Strong knowledge of preventive maintenance practices
Experience with PLC programming and automation systems
Excellent problem-solving and communication skills
My father is a retired electrical engineer who specialized in industrial maintenance.
Retired electrical engineer
Specialized in industrial maintenance
Recently attended breakdown of a faulty conveyor belt in the production line
Conveyor belt stopped moving due to motor failure
Identified and replaced faulty motor
Performed routine maintenance on other conveyor belts to prevent future breakdowns
I inquired about the company's history, services, current projects, and future goals.
History of USHA company
Services offered by USHA
Current projects undertaken by USHA
Future goals of USHA
I am currently earning a competitive salary based on my experience and qualifications.
My current salary is competitive within the industry
It is based on my experience and qualifications
I am open to discussing salary expectations for this role
My salary expectations are based on my experience, qualifications, and the industry standard for Maintenance Engineers.
Consider my level of experience and expertise in the field
Research the average salary range for Maintenance Engineers in this industry
Open to negotiation based on benefits and opportunities for growth
Top trending discussions
A wire harness is a collection of wires, cables, and connectors that transmit electrical signals and power between different components in a system.
Wire harnesses provide a neat and organized way to route and protect wires in a system.
They ensure proper connectivity and prevent wire damage or short circuits.
Wire harnesses simplify troubleshooting and maintenance by allowing easy identification and replacement of faulty...
Sputtering is a process used in manufacturing to deposit thin films of material onto a surface.
Sputtering is a physical vapor deposition technique.
It involves bombarding a target material with high-energy ions or atoms.
This bombardment dislodges atoms from the target material, which then deposit onto a substrate.
Sputtering is commonly used in the production of semiconductor devices, solar cells, and thin film coatings.
...
I applied via Campus Placement and was interviewed before Apr 2019. There was 1 interview round.
I applied via Approached by Company and was interviewed before Feb 2021. There were 3 interview rounds.
I applied via Apna Jobs and was interviewed in Mar 2022. There were 3 interview rounds.
I will immediately investigate the cause of the NG lot and work with the team to find a solution to make it usable.
Investigate the cause of the NG lot
Work with the team to find a solution
Prioritize urgent use of the lot
Ensure quality control measures are in place
Communicate with stakeholders about the situation
I applied via Walk-in and was interviewed in Jun 2021. There was 1 interview round.
I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.
Insulation
Insulate the panel
Use protective covers
Ensure proper grounding
Regular maintenance
UG cable laying process involves trenching, cable pulling, jointing, and testing.
Trenching is done to create a path for the cable and ensure proper depth
Cable pulling involves laying the cable in the trench and securing it with clamps
Jointing is done to connect two cables together using connectors and insulators
Testing is done to ensure the cable is properly installed and functioning
Criteria for UG cable laying include...
Some of the top questions asked at the USHA International Maintenance Engineer interview -
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Territory Manager
293
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Territory Manager
190
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales Executive
159
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
141
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales Manager
130
salaries
| ₹0 L/yr - ₹0 L/yr |
Bajaj Electricals
Havells
Whirlpool
LG Electronics