Upload Button Icon Add office photos

URC Construction

Compare button icon Compare button icon Compare

Filter interviews by

URC Construction Executive Engineer Interview Questions and Answers for Freshers

Updated 30 Oct 2023

URC Construction Executive Engineer Interview Experiences for Freshers

1 interview found

Executive Engineer Interview Questions & Answers

user image Sathish Kumar.G

posted on 19 Oct 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. In How much square metres shuttering will be done in 1carpenter & 1helper per day ??
  • Ans. 

    The amount of square metres of shuttering done in a day by 1 carpenter and 1 helper varies based on factors like experience, efficiency, and complexity of the task.

    • The square metres of shuttering done per day can range from 10-50 depending on the skill level and speed of the carpenter and helper.

    • Factors such as the type of material used, complexity of the design, and availability of tools can also impact the amount of ...

  • Answered by AI
  • Q2. What is the Difference Between nominal mix & design mix?
  • Ans. 

    Nominal mix is a rough mix with fixed ratios, while design mix is a specific mix designed for a particular strength and durability.

    • Nominal mix has fixed ratios like 1:2:4, while design mix is calculated based on specific requirements.

    • Design mix is more precise and tailored to achieve desired strength and durability.

    • Nominal mix is commonly used for small construction projects, while design mix is preferred for larger pr...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Lot of work pressure is there. New joine person don't expect the first 1 month salary..And first month will be held on NXT month after 25 will be given . And mrng timing 7:30 surely your in site and evng out time not sure when will you go to room based on your work ....

Interview questions from similar companies

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. PAST EXPERIENCE QUESTIONS

Interview Preparation Tips

Topics to prepare for L&T Energy Hydrocarbon Senior Engineer interview:
  • Piping
Interview preparation tips for other job seekers - GET DETAILS OF CODES AND STANDARDS YOU USED IN WORK
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About your self. About casting yard. About Methodology of casting of different structures. About site progress planning and time cycle of progress. This process is for 30-40 minutes.
Round 3 - HR 

(1 Question)

  • Q1. Details of my Education and experience. Salary negotiation and finalization of joining.

Interview Preparation Tips

Topics to prepare for AECOM Senior Engineer interview:
  • Civil Construction
  • IS Code
  • Your expertise area
Interview preparation tips for other job seekers - Prepare before going to attend an interview on all subject not only in your expertise area.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Whate are different bus bar schemes?
  • Ans. 

    Bus bar schemes are different ways of connecting bus bars in power systems.

    • Single bus bar scheme

    • Double bus bar scheme

    • Main and transfer bus bar scheme

    • Ring bus bar scheme

    • Breaker and a half scheme

    • Mesh bus bar scheme

  • Answered by AI
  • Q2. What are the equipment sequence for any line bay?
  • Ans. 

    The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.

    • The circuit breaker is the first equipment in the sequence.

    • Next comes the isolator switch.

    • After that, the earth switch is operated.

    • Then the line disconnector is opened.

    • Finally, the transformer is disconnected from the line.

    • The sequence is reversed when the line bay is put back into service.

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What you want to leave your current organization?
  • Q2. Are you comfortable to relocate to another city?

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be prepare about possible questions and be confident while giving interview

Interview Questionnaire 

5 Questions

  • Q1. Seismic design of building, criteria, type of checks in building with respect to seismic, analysis approach
  • Q2. Pile and foundation detail, structural system in building, shear wall, dual system implications
  • Q3. Steel structure- Class of section, connection detail, slender member design criteria
  • Q4. Building irregularities type
  • Q5. Nature of scope of work performed, understanding of coordination approach, software knowledge

I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Errection and maintenance related
  • Q2. Installation of b/plant, tower crain etc
  • Q3. Aggregate processing plant, screen house, primary crusher, secondary crusher, conveyor belt errection,fluit coupling repairing work

Interview Preparation Tips

Interview preparation tips for other job seekers - All over India telephonic or walk-in interview please call my no for interview
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are your strengths and weaknesses?
Round 3 - Technical 
Round 4 - Technical 
Round 5 - Technical 
Round 6 - One-on-one 

Interview Preparation Tips

Interview preparation tips for other job seekers - Reference not accept
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Why leave the previous company?
  • Q2. Tell us something about yourself
Round 3 - Assignment 

Total 3 rounds of interview were conducted

Round 4 - HR 

(1 Question)

  • Q1. Salary is getting higher

URC Construction Interview FAQs

How many rounds are there in URC Construction Executive Engineer interview for freshers?
URC Construction interview process for freshers usually has 2 rounds. The most common rounds in the URC Construction interview process for freshers are Resume Shortlist and Technical.
What are the top questions asked in URC Construction Executive Engineer interview for freshers?

Some of the top questions asked at the URC Construction Executive Engineer interview for freshers -

  1. In How much square metres shuttering will be done in 1carpenter & 1helper per d...read more
  2. What is the Difference Between nominal mix & design m...read more

Tell us how to improve this page.

URC Construction Executive Engineer Interview Process for Freshers

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 118 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 61 Interviews
Psp Projects Interview Questions
3.9
 • 51 Interviews
View all
URC Construction Executive Engineer Salary
based on 14 salaries
₹1.8 L/yr - ₹4.8 L/yr
40% less than the average Executive Engineer Salary in India
View more details

URC Construction Executive Engineer Reviews and Ratings

based on 2 reviews

2.5/5

Rating in categories

4.0

Skill development

2.5

Work-life balance

4.0

Salary

3.0

Job security

3.4

Company culture

3.0

Promotions

2.0

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Engineer
196 salaries
unlock blur

₹1.8 L/yr - ₹5.5 L/yr

Senior Engineer
131 salaries
unlock blur

₹3 L/yr - ₹9 L/yr

Assistant Engineer - Civil
61 salaries
unlock blur

₹2.4 L/yr - ₹5.7 L/yr

Assistant Manager
48 salaries
unlock blur

₹4.6 L/yr - ₹9.9 L/yr

Planning Engineer
40 salaries
unlock blur

₹1.1 L/yr - ₹7 L/yr

Explore more salaries
Compare URC Construction with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview