Filter interviews by
I applied via LinkedIn and was interviewed in Apr 2024. There was 1 interview round.
I have a strong technical background, proven track record of successful projects, and a passion for continuous learning and improvement.
Extensive experience in senior engineering roles
Proven track record of delivering successful projects on time and within budget
Passion for continuous learning and staying up-to-date with industry trends
Strong problem-solving skills and ability to work well in a team
I applied via Walk-in and was interviewed before Feb 2023. There was 1 interview round.
The main components of estimation work include gathering data, analyzing requirements, determining resources, and creating a timeline.
Gathering data: Collecting relevant information and data to understand the project requirements.
Analyzing requirements: Evaluating the scope, complexity, and constraints of the project.
Determining resources: Identifying the necessary materials, equipment, and personnel needed for the pro...
I applied via Naukri.com and was interviewed in Aug 2021. There was 1 interview round.
I have used various types of software in my work as a Project Manager Civil.
Project management software such as Microsoft Project or Primavera P6
Design software like AutoCAD or Revit for creating and editing civil engineering drawings
Collaboration and communication tools like Microsoft Teams or Slack for team coordination
Cost estimation software like CostX or Candy for budgeting and cost control
Document management syst...
Top trending discussions
A C code that prints out the elements of an array of strings.
Declare an array of strings
Use a loop to iterate through the array
Print out each element
The probability of rain in Chennai today depends on various factors such as season, weather conditions, and location.
The probability can be estimated by analyzing the current weather patterns and historical data.
Factors such as humidity, temperature, and wind speed can affect the probability of rain.
Local weather forecasts and satellite imagery can also provide insights into the likelihood of rain.
The probability of ra...
It is impossible to accurately predict the probability of India winning the next Cricket World Cup.
Sports events are unpredictable and depend on various factors such as team performance, weather conditions, injuries, etc.
Past performance of the team and individual players can be considered, but it does not guarantee future success.
Other teams participating in the tournament also play a significant role in determining t...
Polymorphism is the ability of an object to take on many forms. In C++, it is achieved through function overloading and virtual functions.
Polymorphism allows objects of different classes to be treated as objects of a common base class.
Function overloading enables multiple functions with the same name but different parameters.
Virtual functions allow derived classes to override base class functions.
based on 2 interviews
Interview experience
based on 9 reviews
Rating in categories
Architectural Draughtsman
5
salaries
| ₹3.2 L/yr - ₹4.2 L/yr |
Accounts Manager
4
salaries
| ₹10 L/yr - ₹10 L/yr |
HR Manager
3
salaries
| ₹3.5 L/yr - ₹6 L/yr |
Quantity Surveyor
3
salaries
| ₹4.2 L/yr - ₹5.5 L/yr |
Urban Company
Housejoy
Quikr
MagicBricks