UL Solutions Project Engineer Interview Questions and Answers for Experienced

Updated 29 Mar 2024

UL Solutions Project Engineer Interview Experiences for Experienced

2 interviews found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Indeed and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Related to previous work
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Tell me about yourself.
Round 3 - Technical 

(1 Question)

  • Q1. Tech experience needed more

Interview Preparation Tips

Interview preparation tips for other job seekers - More technical experience needed

Project Engineer Interview Questions Asked at Other Companies for Experienced

asked in Wipro
Q1. Segregate Odd-Even Problem Statement In a wedding ceremony at Nin ... read more
Q2. What is the difference between lap length and Anchorage length ?
Q3. 4)what is sag and how to minimize it. 5)if a consumer having dist ... read more
Q4. How to solve the Point load, UDL, UVL load problems
Q5. How you do the rate analysis for additional item and what are the ... read more

Interview questions from similar companies

I applied via Indeed and was interviewed before May 2018. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Concerning job profile as like a electrical infrastracture project(ipds,ddugjy,rggvy)

Interview Preparation Tips

General Tips: put tecnical question or family relative question regarding my job profile @ bcarrier objective
Skills: only my knowledge or experience
Duration: 1-3 Months

I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. 33/11 kv sub station related, transformer, ct,pt, vcb,capacitor bank, LA, isolator
  • Q2. Types of insulator
  • Ans. 

    Insulators are materials that do not conduct electricity. They are used to prevent the flow of electrical current.

    • Ceramic insulators: Made of materials like porcelain or glass, commonly used in power lines.

    • Polymer insulators: Made of synthetic materials like silicone rubber, used in high-voltage transmission lines.

    • Composite insulators: Combination of different materials, used in various electrical applications.

    • Air insu...

  • Answered by AI
  • Q3.  How much distance pole to earth rod
  • Ans. 

    The distance between a pole and an earth rod depends on various factors such as soil resistivity and electrical requirements.

    • The distance between a pole and an earth rod is typically determined by the electrical engineer or designer based on the specific project requirements.

    • Soil resistivity plays a crucial role in determining the distance. Lower resistivity soils require shorter distances between the pole and earth ro...

  • Answered by AI
  • Q4. 5 mav tranformer plinth size
  • Ans. 

    The size of the plinth for 5 MAV transformers.

    • The plinth size will depend on the specific dimensions and weight of the MAV transformers.

    • Consider the space required for installation, maintenance, and ventilation.

    • Ensure the plinth is strong enough to support the weight of the transformers.

    • Consult the manufacturer's specifications or engineering standards for guidance.

    • Example: If each MAV transformer has dimensions of 2m ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Power Distribution 33/11 kv and tecnical round
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is transformer,how its work.
  • Ans. 

    A transformer is an electrical device that transfers electrical energy from one circuit to another through electromagnetic induction.

    • Transformers work on the principle of electromagnetic induction

    • They have two coils, primary and secondary, wound around a magnetic core

    • When an alternating current flows through the primary coil, it creates a magnetic field which induces a voltage in the secondary coil

    • Transformers are used...

  • Answered by AI
  • Q2. Write down dtr structure materials.
  • Ans. 

    DTR (Dynamic Tension Regulation) structure materials include carbon fiber, Kevlar, and fiberglass.

    • DTR structure materials are used in high-performance applications where strength and durability are crucial.

    • Carbon fiber is a popular choice due to its high strength-to-weight ratio.

    • Kevlar is known for its excellent impact resistance and is often used in bulletproof vests.

    • Fiberglass is a cost-effective option that provides

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep learning,and Earning, Electrical is good subject specially power system.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Mar 2023, where I was asked the following questions.

  • Q1. Define about your previous job role
  • Ans. 

    In my previous role as a Project Engineer, I managed engineering projects from conception to completion, ensuring timely delivery and quality.

    • Led a team of engineers to design and implement a new manufacturing process, resulting in a 20% increase in efficiency.

    • Coordinated with cross-functional teams to ensure project milestones were met, improving communication and collaboration.

    • Conducted risk assessments and developed...

  • Answered by AI
  • Q2. Crane pad compaction detail
  • Q3. Crane pad area detail
  • Q4. Capacity of crane lifting
  • Ans. 

    Understanding crane lifting capacity is crucial for safe and efficient project execution.

    • Crane capacity is determined by the type of crane and its configuration.

    • For example, a tower crane can lift heavier loads than a mobile crane due to its fixed base.

    • The lifting capacity decreases as the radius increases; for instance, a crane may lift 10 tons at 10 meters but only 5 tons at 20 meters.

    • Load charts provided by manufact...

  • Answered by AI
  • Q5. Detail in interacting and movement of major component
  • Ans. 

    Effective interaction and movement of major components ensure project success and efficiency in engineering tasks.

    • Understand the specifications of each component to ensure compatibility.

    • Utilize CAD software for precise modeling and visualization of component interactions.

    • Implement a systematic approach for assembly, such as following a step-by-step guide.

    • Conduct regular checks and tests during the movement phase to ide...

  • Answered by AI
  • Q6. Height and weight of major components
  • Q7. Process of Erection
  • Q8. Requirements of Erection
  • Ans. 

    Erection requirements involve planning, safety measures, and coordination for successful project execution.

    • Site Preparation: Ensure the site is cleared and ready for equipment and materials.

    • Safety Protocols: Implement safety measures like PPE and hazard assessments.

    • Equipment Availability: Confirm that all necessary tools and machinery are on-site.

    • Skilled Workforce: Ensure that qualified personnel are available for the ...

  • Answered by AI
  • Q9. How many manpower required in one crane pakage
  • Q10. How many cranes required in one crane pakage
  • Ans. 

    The number of cranes in a crane package depends on project size, load requirements, and site conditions.

    • Typically, one crane is sufficient for small to medium projects.

    • For larger projects, multiple cranes may be needed for efficiency.

    • Example: A high-rise building may require 2-3 cranes for simultaneous operations.

    • Consideration of crane type (tower, mobile) affects the number needed.

    • Site layout and logistics can also di

  • Answered by AI
  • Q11. Which tools required for tensioning and torquing
  • Ans. 

    Tensioning and torquing tools ensure proper fastening and load distribution in engineering projects.

    • Torque Wrench: Used to apply a specific torque to fasteners, ensuring they are tightened to the correct specification.

    • Tensioning Tool: Devices like hydraulic tensioners that apply a precise amount of tension to bolts, often used in large structures.

    • Torque Angle Gauge: Measures the angle of rotation after a fastener has b...

  • Answered by AI
  • Q12. Complete detail work of preparation for erection
  • Q13. Detail work process of MCC
  • Ans. 

    MCC (Motor Control Center) work process involves design, installation, and maintenance of electrical control systems for motors.

    • Design: Create layout and specifications for the MCC based on project requirements.

    • Installation: Assemble and install MCC components like circuit breakers, contactors, and control panels.

    • Testing: Conduct functional tests to ensure all components operate correctly and safely.

    • Maintenance: Regula...

  • Answered by AI
  • Q14. Process of MCC closing
  • Ans. 

    MCC closing involves safely shutting down a Motor Control Center, ensuring equipment and personnel safety.

    • 1. Ensure all equipment is in a safe state before closing the MCC.

    • 2. Notify all personnel involved in the operation about the MCC closure.

    • 3. Follow lockout/tagout (LOTO) procedures to prevent accidental re-energization.

    • 4. Gradually reduce load on the MCC by shutting down connected equipment.

    • 5. Monitor voltage and c...

  • Answered by AI
  • Q15. Punch point close plan
  • Q16. How you can stop the mishandling of tools and tackle and major components in site
  • Ans. 

    Implementing strict protocols and training can prevent tool mishandling and ensure safety on site.

    • Conduct regular training sessions on proper tool handling and safety protocols.

    • Implement a tool tracking system to monitor the usage and location of tools.

    • Establish a designated storage area for tools and components to prevent loss and damage.

    • Use color-coded tags or labels to identify tools and their designated users.

    • Condu...

  • Answered by AI
  • Q17. How you can control of tools damages
  • Ans. 

    Implementing preventive measures and regular maintenance can effectively control tool damage in engineering projects.

    • Conduct regular inspections to identify wear and tear, e.g., checking drill bits for dullness.

    • Implement proper storage solutions to prevent accidental damage, such as using toolboxes or racks.

    • Train staff on correct usage techniques to minimize misuse, e.g., demonstrating proper handling of power tools.

    • Es...

  • Answered by AI
  • Q18. Process of pre-com
  • Ans. 

    Pre-com is the process of preparing and organizing project components before execution.

    • Define project scope and objectives clearly.

    • Gather and analyze all necessary data and resources.

    • Develop a detailed project plan with timelines.

    • Identify and allocate roles and responsibilities among team members.

    • Conduct risk assessments and develop mitigation strategies.

  • Answered by AI
  • Q19. Post-com plan at site
  • Ans. 

    A post-com plan outlines the steps for project completion and site handover, ensuring all tasks are finalized efficiently.

    • Conduct a final site inspection to ensure all work meets quality standards.

    • Compile and submit all necessary documentation, including as-built drawings and warranties.

    • Organize a handover meeting with stakeholders to discuss project outcomes and address any concerns.

    • Ensure all safety measures are revi...

  • Answered by AI

I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Normal questions regarding civil engineering subjects

Interview Preparation Tips

Interview preparation tips for other job seekers - Dont be too nervous. Be normal and answer the questions. If not know any answer just say no.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Aptitude Test 

Electrical and Electronic test

Round 2 - Technical 

(1 Question)

  • Q1. All technical questions do the basic theory properly

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare very well for the interview

Interview Questionnaire 

3 Questions

  • Q1. Introduce yourself?
  • Q2. How will you test about leakage of oil in Transformer?
  • Ans. 

    Testing for oil leakage in transformers involves visual inspection, oil analysis, and pressure testing.

    • Visual inspection of the transformer for any signs of oil leakage

    • Oil analysis to check for any abnormal levels of dissolved gases or contaminants

    • Pressure testing to check for any leaks in the transformer's oil-filled compartments

    • Use of ultrasonic testing to detect any leaks in the transformer's tank

    • Regular maintenance

  • Answered by AI
  • Q3. How will you find out an error after completing the work of any Feeder?
  • Ans. 

    I will conduct a thorough testing and inspection process to identify any errors in the Feeder.

    • Perform visual inspection of the Feeder

    • Conduct electrical testing to ensure proper functioning

    • Check for any loose connections or damaged components

    • Compare the Feeder's performance to the expected results

    • Review any error logs or system alerts

    • Consult with colleagues or experts for additional input

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview should be in previous work experience.
Also related to B.Tech. stream.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2023. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Work experience
  • Q2. Last company details and qualifications
Round 2 - Technical 

(2 Questions)

  • Q1. Brick test compressive strength, Over hand tank like columns dom zik etc.
  • Q2. Quality test cement test , cube test , slump , temperature test curing HDPE pipe IS code life , Manhole , Pipe laying etc
Round 3 - HR 

(1 Question)

  • Q1. Salary dissuasion

UL Solutions Interview FAQs

How many rounds are there in UL Solutions Project Engineer interview for experienced candidates?
UL Solutions interview process for experienced candidates usually has 2 rounds. The most common rounds in the UL Solutions interview process for experienced candidates are Technical, Resume Shortlist and HR.
How to prepare for UL Solutions Project Engineer interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at UL Solutions. The most common topics and skills that interviewers at UL Solutions expect are Project Management, Continuous Improvement, Scheduling, Administration and Switchgear.

Tell us how to improve this page.

UL Solutions Project Engineer Interview Process for Experienced

based on 2 interviews

Interview experience

3.5
  
Good
View more
Join UL Solutions Safety. Science. Transformation.™

Interview Questions from Similar Companies

Bureau Veritas Interview Questions
3.9
 • 117 Interviews
SGS Interview Questions
3.9
 • 98 Interviews
TÜV NORD Interview Questions
3.7
 • 67 Interviews
Intertek Interview Questions
3.7
 • 56 Interviews
Cashify Interview Questions
3.8
 • 41 Interviews
Titan Eye Plus Interview Questions
4.3
 • 30 Interviews
Reliance Group Interview Questions
4.2
 • 20 Interviews
View all
UL Solutions Project Engineer Salary
based on 68 salaries
₹8 L/yr - ₹22 L/yr
186% more than the average Project Engineer Salary in India
View more details

UL Solutions Project Engineer Reviews and Ratings

based on 15 reviews

3.7/5

Rating in categories

3.7

Skill development

3.3

Work-life balance

3.7

Salary

3.7

Job security

3.5

Company culture

3.1

Promotions

3.5

Work satisfaction

Explore 15 Reviews and Ratings
Project Engineer
68 salaries
unlock blur

₹8 L/yr - ₹22 L/yr

Administrative Specialist
20 salaries
unlock blur

₹2.5 L/yr - ₹4.6 L/yr

Associate Project Engineer
19 salaries
unlock blur

₹5.5 L/yr - ₹18.2 L/yr

Senior Project Engineer
15 salaries
unlock blur

₹9.4 L/yr - ₹33 L/yr

Document Control Specialist
14 salaries
unlock blur

₹3.8 L/yr - ₹5 L/yr

Explore more salaries
Compare UL Solutions with

Bureau Veritas

3.9
Compare

SGS

3.9
Compare

Intertek

3.7
Compare

Medhaj Techno Concept

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview