I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Introduce myself, technical, Honeywell plc working, protocols, architecture

Interview Preparation Tips

Interview preparation tips for other job seekers - About the PLC architecture, protocols, application and programming

Interview Questionnaire 

1 Question

  • Q1. What is the layer of cube filling?
  • Ans. 

    The layer of cube filling refers to the material or substance used to fill the empty space inside a cube.

    • The layer of cube filling can vary depending on the purpose of the cube.

    • Common cube fillings include foam, air, liquid, or solid materials.

    • For example, in a foam cube, the filling layer would be foam.

    • In a cube filled with water, the filling layer would be liquid.

    • The choice of cube filling depends on factors such as

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical in civil Engineer

Senior Project Engineer Interview Questions Asked at Other Companies

Q1. Types of road:- 1 Flexible pavements .... .. . 2 Rigid pavements ... read more
Q2. 1) What is reason of Projects delay in Gurgaon mostly HighRise . ... read more
Q3. PQC:- total thickness 300mm use M40 grade concrete, aggregate siz ... read more
Q4. Pqc mix pre mix batching plant homogeneous and uniform. Before la ... read more
Q5. The weight of cement 150kg per cum. If the flyash more than 20% t ... read more

Interview questions from similar companies

I applied via Indeed and was interviewed before May 2018. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Concerning job profile as like a electrical infrastracture project(ipds,ddugjy,rggvy)

Interview Preparation Tips

General Tips: put tecnical question or family relative question regarding my job profile @ bcarrier objective
Skills: only my knowledge or experience
Duration: 1-3 Months

I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. 33/11 kv sub station related, transformer, ct,pt, vcb,capacitor bank, LA, isolator
  • Q2. Types of insulator
  • Ans. 

    Insulators are materials that do not conduct electricity. They are used to prevent the flow of electrical current.

    • Ceramic insulators: Made of materials like porcelain or glass, commonly used in power lines.

    • Polymer insulators: Made of synthetic materials like silicone rubber, used in high-voltage transmission lines.

    • Composite insulators: Combination of different materials, used in various electrical applications.

    • Air insu...

  • Answered by AI
  • Q3.  How much distance pole to earth rod
  • Ans. 

    The distance between a pole and an earth rod depends on various factors such as soil resistivity and electrical requirements.

    • The distance between a pole and an earth rod is typically determined by the electrical engineer or designer based on the specific project requirements.

    • Soil resistivity plays a crucial role in determining the distance. Lower resistivity soils require shorter distances between the pole and earth ro...

  • Answered by AI
  • Q4. 5 mav tranformer plinth size
  • Ans. 

    The size of the plinth for 5 MAV transformers.

    • The plinth size will depend on the specific dimensions and weight of the MAV transformers.

    • Consider the space required for installation, maintenance, and ventilation.

    • Ensure the plinth is strong enough to support the weight of the transformers.

    • Consult the manufacturer's specifications or engineering standards for guidance.

    • Example: If each MAV transformer has dimensions of 2m ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Power Distribution 33/11 kv and tecnical round
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is transformer,how its work.
  • Ans. 

    A transformer is an electrical device that transfers electrical energy from one circuit to another through electromagnetic induction.

    • Transformers work on the principle of electromagnetic induction

    • They have two coils, primary and secondary, wound around a magnetic core

    • When an alternating current flows through the primary coil, it creates a magnetic field which induces a voltage in the secondary coil

    • Transformers are used...

  • Answered by AI
  • Q2. Write down dtr structure materials.
  • Ans. 

    DTR (Dynamic Tension Regulation) structure materials include carbon fiber, Kevlar, and fiberglass.

    • DTR structure materials are used in high-performance applications where strength and durability are crucial.

    • Carbon fiber is a popular choice due to its high strength-to-weight ratio.

    • Kevlar is known for its excellent impact resistance and is often used in bulletproof vests.

    • Fiberglass is a cost-effective option that provides

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep learning,and Earning, Electrical is good subject specially power system.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Mar 2023, where I was asked the following questions.

  • Q1. Define about your previous job role
  • Q2. Crane pad compaction detail
  • Q3. Crane pad area detail
  • Q4. Capacity of crane lifting
  • Q5. Detail in interacting and movement of major component
  • Q6. Height and weight of major components
  • Q7. Process of Erection
  • Q8. Requirements of Erection
  • Q9. How many manpower required in one crane pakage
  • Q10. How many cranes required in one crane pakage
  • Q11. Which tools required for tensioning and torquing
  • Q12. Complete detail work of preparation for erection
  • Q13. Detail work process of MCC
  • Q14. Process of MCC closing
  • Q15. Punch point close plan
  • Q16. How you can stop the mishandling of tools and tackle and major components in site
  • Q17. How you can control of tools damages
  • Q18. Process of pre-com
  • Q19. Post-com plan at site

Interview Questionnaire 

3 Questions

  • Q1. Core Java related
  • Q2. Advance java, ajax , my baitis
  • Q3. Some Technical the. Hr discussion

Interview Preparation Tips

Round: Test
Experience: Mcq

I applied via Other and was interviewed before Jan 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About current work experience
  • Q2. What do you know about IPAC
  • Ans. 

    IPAC stands for Integrated Public Alert and Warning System. It is a national alert and warning system in the United States.

    • IPAC is designed to provide timely and accurate alerts and warnings to the public during emergencies and disasters.

    • It is managed by the Federal Emergency Management Agency (FEMA) in partnership with other federal agencies, state and local governments, and the private sector.

    • IPAC can send alerts thr...

  • Answered by AI
  • Q3. Whats your understanding of TN Politics

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic understanding of political situation in the state

I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Normal questions regarding civil engineering subjects

Interview Preparation Tips

Interview preparation tips for other job seekers - Dont be too nervous. Be normal and answer the questions. If not know any answer just say no.

I applied via Naukri.com and was interviewed in Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. All questions are about basic Fundamentals of Accounting. I.e mostly Journal entries
  • Q2. Journal entries for accruals
  • Ans. 

    Journal entries for accruals

    • Accruals are used to record expenses or revenues that have been incurred but not yet paid or received.

    • Accrued expenses are recorded with a debit to the expense account and a credit to the accrued liability account.

    • Accrued revenues are recorded with a debit to the accrued asset account and a credit to the revenue account.

    • Example of an accrued expense: Accrued salaries payable - Debit Salaries...

  • Answered by AI
  • Q3. Adjustment entries

Interview Preparation Tips

Interview preparation tips for other job seekers - Be strong on Basics of Accounting

UL Solutions Interview FAQs

How many rounds are there in UL Solutions Senior Project Engineer interview?
UL Solutions interview process usually has 2 rounds. The most common rounds in the UL Solutions interview process are Resume Shortlist and Technical.
How to prepare for UL Solutions Senior Project Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at UL Solutions. The most common topics and skills that interviewers at UL Solutions expect are Continuous Improvement, Risk Management, Administration, Auditing and Civil Engineering.

Tell us how to improve this page.

Join UL Solutions Safety. Science. Transformation.™

Interview Questions from Similar Companies

Deloitte Interview Questions
3.8
 • 2.8k Interviews
Ernst & Young Interview Questions
3.4
 • 1.1k Interviews
KPMG India Interview Questions
3.5
 • 795 Interviews
Bureau Veritas Interview Questions
3.9
 • 113 Interviews
SGS Interview Questions
3.9
 • 93 Interviews
TÜV NORD Interview Questions
3.8
 • 63 Interviews
Intertek Interview Questions
3.8
 • 51 Interviews
Cashify Interview Questions
3.8
 • 40 Interviews
View all
UL Solutions Senior Project Engineer Salary
based on 15 salaries
₹9.4 L/yr - ₹33 L/yr
119% more than the average Senior Project Engineer Salary in India
View more details

UL Solutions Senior Project Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Project Engineer
68 salaries
unlock blur

₹8 L/yr - ₹22 L/yr

Administrative Specialist
20 salaries
unlock blur

₹2.5 L/yr - ₹4.6 L/yr

Associate Project Engineer
18 salaries
unlock blur

₹6.4 L/yr - ₹18.2 L/yr

Senior Project Engineer
15 salaries
unlock blur

₹9.4 L/yr - ₹33 L/yr

Document Control Specialist
14 salaries
unlock blur

₹3.8 L/yr - ₹5 L/yr

Explore more salaries
Compare UL Solutions with

Bureau Veritas

3.9
Compare

SGS

3.9
Compare

Intertek

3.7
Compare

Medhaj Techno Concept

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview