Insulators are materials that do not conduct electricity. They are used to prevent the flow of electrical current.
Ceramic insulators: Made of materials like porcelain or glass, commonly used in power lines.
Polymer insulators: Made of synthetic materials like silicone rubber, used in high-voltage transmission lines.
Composite insulators: Combination of different materials, used in various electrical applications.
Air insu...
The distance between a pole and an earth rod depends on various factors such as soil resistivity and electrical requirements.
The distance between a pole and an earth rod is typically determined by the electrical engineer or designer based on the specific project requirements.
Soil resistivity plays a crucial role in determining the distance. Lower resistivity soils require shorter distances between the pole and earth ro...
The size of the plinth for 5 MAV transformers.
The plinth size will depend on the specific dimensions and weight of the MAV transformers.
Consider the space required for installation, maintenance, and ventilation.
Ensure the plinth is strong enough to support the weight of the transformers.
Consult the manufacturer's specifications or engineering standards for guidance.
Example: If each MAV transformer has dimensions of 2m ...
posted on 2 May 2019
I applied via Indeed and was interviewed before May 2018. There were 3 interview rounds.
posted on 19 Nov 2022
A transformer is an electrical device that transfers electrical energy from one circuit to another through electromagnetic induction.
Transformers work on the principle of electromagnetic induction
They have two coils, primary and secondary, wound around a magnetic core
When an alternating current flows through the primary coil, it creates a magnetic field which induces a voltage in the secondary coil
Transformers are used...
DTR (Dynamic Tension Regulation) structure materials include carbon fiber, Kevlar, and fiberglass.
DTR structure materials are used in high-performance applications where strength and durability are crucial.
Carbon fiber is a popular choice due to its high strength-to-weight ratio.
Kevlar is known for its excellent impact resistance and is often used in bulletproof vests.
Fiberglass is a cost-effective option that provides
I appeared for an interview in Mar 2023, where I was asked the following questions.
In my previous role as a Project Engineer, I managed engineering projects from conception to completion, ensuring timely delivery and quality.
Led a team of engineers to design and implement a new manufacturing process, resulting in a 20% increase in efficiency.
Coordinated with cross-functional teams to ensure project milestones were met, improving communication and collaboration.
Conducted risk assessments and developed...
Effective interaction and movement of major components ensure project success and efficiency in engineering tasks.
Understand the specifications of each component to ensure compatibility.
Utilize CAD software for precise modeling and visualization of component interactions.
Implement a systematic approach for assembly, such as following a step-by-step guide.
Conduct regular checks and tests during the movement phase to ide...
Tensioning and torquing tools ensure proper fastening and load distribution in engineering projects.
Torque Wrench: Used to apply a specific torque to fasteners, ensuring they are tightened to the correct specification.
Tensioning Tool: Devices like hydraulic tensioners that apply a precise amount of tension to bolts, often used in large structures.
Torque Angle Gauge: Measures the angle of rotation after a fastener has b...
MCC (Motor Control Center) work process involves design, installation, and maintenance of electrical control systems for motors.
Design: Create layout and specifications for the MCC based on project requirements.
Installation: Assemble and install MCC components like circuit breakers, contactors, and control panels.
Testing: Conduct functional tests to ensure all components operate correctly and safely.
Maintenance: Regula...
MCC closing involves safely shutting down a Motor Control Center, ensuring equipment and personnel safety.
1. Ensure all equipment is in a safe state before closing the MCC.
2. Notify all personnel involved in the operation about the MCC closure.
3. Follow lockout/tagout (LOTO) procedures to prevent accidental re-energization.
4. Gradually reduce load on the MCC by shutting down connected equipment.
5. Monitor voltage and c...
Implementing strict protocols and training can prevent tool mishandling and ensure safety on site.
Conduct regular training sessions on proper tool handling and safety protocols.
Implement a tool tracking system to monitor the usage and location of tools.
Establish a designated storage area for tools and components to prevent loss and damage.
Use color-coded tags or labels to identify tools and their designated users.
Condu...
Implementing preventive measures and regular maintenance can effectively control tool damage in engineering projects.
Conduct regular inspections to identify wear and tear, e.g., checking drill bits for dullness.
Implement proper storage solutions to prevent accidental damage, such as using toolboxes or racks.
Train staff on correct usage techniques to minimize misuse, e.g., demonstrating proper handling of power tools.
Es...
Pre-com is the process of preparing and organizing project components before execution.
Define project scope and objectives clearly.
Gather and analyze all necessary data and resources.
Develop a detailed project plan with timelines.
Identify and allocate roles and responsibilities among team members.
Conduct risk assessments and develop mitigation strategies.
A post-com plan outlines the steps for project completion and site handover, ensuring all tasks are finalized efficiently.
Conduct a final site inspection to ensure all work meets quality standards.
Compile and submit all necessary documentation, including as-built drawings and warranties.
Organize a handover meeting with stakeholders to discuss project outcomes and address any concerns.
Ensure all safety measures are revi...
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Oct 2022. There were 2 interview rounds.
Electrical and Electronic test
posted on 23 Jul 2024
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Gurgaon / Gurugram
2-6 Yrs
Not Disclosed
Noida,
Gurgaon / Gurugram
+12-7 Yrs
Not Disclosed
Project Engineer
68
salaries
| ₹8 L/yr - ₹22 L/yr |
Administrative Specialist
20
salaries
| ₹2.5 L/yr - ₹4.6 L/yr |
Associate Project Engineer
18
salaries
| ₹6.4 L/yr - ₹18.2 L/yr |
Senior Project Engineer
15
salaries
| ₹9.4 L/yr - ₹33 L/yr |
Document Control Specialist
14
salaries
| ₹3.8 L/yr - ₹5 L/yr |
Bureau Veritas
SGS
Intertek
Medhaj Techno Concept