Upload Button Icon Add office photos

Filter interviews by

Tulip Infratech Civil Site Supervisor Interview Questions and Answers

Updated 5 Dec 2023

Tulip Infratech Civil Site Supervisor Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. RCC basics and design concepts
  • Q2. Geotechnical engineering tests
  • Q3. Building materials

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Execution process
  • Q2. Building rules and laws

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare yourself
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Self introduction and my career details
  • Q2. Its about my previous company details
Round 2 - Technical 

(1 Question)

  • Q1. It's all about my experience based technical questions

Site Engineer Interview Questions & Answers

DRA Homes user image Nishanth Ganesan Velu

posted on 31 Jul 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(3 Questions)

  • Q1. Density of common material like cement, steel, fine and coarse aggregate
  • Ans. 

    Density of common construction materials varies, with cement around 1440 kg/m3, steel around 7850 kg/m3, fine aggregate around 1600-1750 kg/m3, and coarse aggregate around 1200-1750 kg/m3.

    • Cement density: 1440 kg/m3

    • Steel density: 7850 kg/m3

    • Fine aggregate density: 1600-1750 kg/m3

    • Coarse aggregate density: 1200-1750 kg/m3

  • Answered by AI
  • Q2. Weight of the cube which is made to check the strength of concrete
  • Ans. 

    The weight of the cube used to check the strength of concrete is typically 15 cm x 15 cm x 15 cm and weighs around 29 kg.

    • Standard size of cube for testing concrete strength is 15 cm x 15 cm x 15 cm

    • Weight of the cube is usually around 29 kg

    • The cube is made of concrete from the same batch being tested

  • Answered by AI
  • Q3. Ratio of cement mortar for outer and inner wall plastering
  • Ans. 

    The ratio of cement mortar for outer and inner wall plastering varies depending on the type of wall and desired finish.

    • The ratio of cement mortar for outer wall plastering is usually 1:4 (1 part cement to 4 parts sand).

    • The ratio of cement mortar for inner wall plastering is typically 1:6 (1 part cement to 6 parts sand).

    • However, the ratio can vary based on factors such as the type of wall surface, desired finish, and lo...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. What is your goal and do you know how to achieve?
  • Ans. 

    My goal is to become a proficient Site Engineer by gaining experience, knowledge, and skills in the field.

    • Continuously seek opportunities to learn and improve technical skills

    • Work on various projects to gain practical experience

    • Seek mentorship from experienced engineers

    • Stay updated with industry trends and technologies

    • Obtain relevant certifications to enhance credibility

    • Set specific career milestones to track progress

  • Answered by AI
  • Q2. After 5 to 6 years, what is your position in your field ?
  • Ans. 

    I envision myself as a Senior Site Engineer leading projects and mentoring junior engineers.

    • Leading and managing multiple projects simultaneously

    • Mentoring and training junior engineers

    • Implementing innovative technologies and practices

    • Collaborating with cross-functional teams for successful project delivery

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be strong on what you know and have to know something about advancement in your field

I applied via Approached by Company and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Quantity Take off, BOQ Preparation and Current Market Prices of Civil Materials
Round 3 - One-on-one 

(1 Question)

  • Q1. Final Round With Site DGM

Interview Preparation Tips

Interview preparation tips for other job seekers - Simple Questions if you know the answers then you keep on Continuing if not don't waste interviewers time..
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Maivan work know waterproofing work check, brick work, plastering, painting, putty, primary , gypsum work know, falceling, tile marvel, granite, wooden work know, upvc mep railing scating work check,
  • Ans. Interview time I'm speak
  • Answered by lalatsahoo
  • Q2. Any question & answer i can speak

Interview Preparation Tips

Interview preparation tips for other job seekers - I can speak English, hindi, odia, finishing work total know, stacher
My present company my home group
My pvc company aparna construction
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. HR asked about me
Round 3 - Technical 

(2 Questions)

  • Q1. What are the responsibilities of an site engineer??
  • Ans. 

    Site engineers are responsible for overseeing construction projects, managing workers, ensuring safety regulations are followed, and coordinating with various stakeholders.

    • Managing construction projects from start to finish

    • Supervising and coordinating construction workers

    • Ensuring safety regulations and building codes are followed

    • Collaborating with architects, engineers, and subcontractors

    • Preparing and presenting progre

  • Answered by AI
  • Q2. Execution's & Reduce wastage

Interview Preparation Tips

Interview preparation tips for other job seekers - Telling the truth and keeping confidence.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Internal plaster thickness and ratio?
  • Ans. 

    Internal plaster thickness and ratio are important factors in construction projects.

    • The standard thickness of internal plaster is usually 12mm for walls and 15mm for ceilings.

    • The ratio of internal plaster is typically 1:6 (1 part cement to 6 parts sand).

    • The thickness and ratio may vary depending on the specific requirements of the project and the type of surface being plastered.

  • Answered by AI
  • Q2. Process of slab checking?
  • Ans. 

    Slab checking involves verifying the structural integrity and load-bearing capacity of concrete slabs.

    • Check for proper reinforcement placement and spacing

    • Verify concrete mix design and curing process

    • Inspect for any cracks or defects

    • Ensure slab thickness meets design specifications

    • Perform load testing if necessary

  • Answered by AI
  • Q3. External Plaster thickness and ratio?
  • Ans. 

    External plaster thickness and ratio are determined based on the type of surface and desired finish.

    • External plaster thickness typically ranges from 12mm to 20mm depending on the surface condition.

    • The ratio of external plaster mix is usually 1:4 (cement:sand) for rough surfaces and 1:6 for smooth finishes.

    • For better adhesion, a bonding agent may be added to the plaster mix.

    • Proper curing is essential to ensure the stren

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I will try my best technical knowledge provide for your company...

I applied via Referral and was interviewed in Jan 2021. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Civil structural, finishing and mep. These subjects have to be known.

Interview Preparation Tips

Interview preparation tips for other job seekers - Not only civil any specialization, you have to know civil structural, finishing in details, electrical, plumbing, land scaping all things. Have Knowledge everything.

I appeared for an interview in Feb 2021.

Interview Questionnaire 

1 Question

  • Q1. About bricks leadge wall

Interview Preparation Tips

Interview preparation tips for other job seekers - I am happy with ATS Homektaft

Tulip Infratech Interview FAQs

How many rounds are there in Tulip Infratech Civil Site Supervisor interview?
Tulip Infratech interview process usually has 2 rounds. The most common rounds in the Tulip Infratech interview process are Resume Shortlist and Technical.
What are the top questions asked in Tulip Infratech Civil Site Supervisor interview?

Some of the top questions asked at the Tulip Infratech Civil Site Supervisor interview -

  1. RCC basics and design conce...read more
  2. Geotechnical engineering te...read more
  3. Building materi...read more

Tell us how to improve this page.

Tulip Infratech Civil Site Supervisor Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

DRA Homes Interview Questions
4.6
 • 23 Interviews
N.K. Realtors Interview Questions
4.2
 • 19 Interviews
JP Infra Interview Questions
3.8
 • 19 Interviews
DTC Projects Interview Questions
4.0
 • 17 Interviews
PS Group Interview Questions
3.8
 • 16 Interviews
ATS Homekraft Interview Questions
4.1
 • 16 Interviews
Bullmen Realty Interview Questions
3.0
 • 14 Interviews
View all
Civil Engineer
12 salaries
unlock blur

₹3.6 L/yr - ₹5.4 L/yr

Civil Site Engineer
10 salaries
unlock blur

₹2.2 L/yr - ₹4.2 L/yr

Site Engineer
10 salaries
unlock blur

₹2.4 L/yr - ₹7 L/yr

Senior Engineer
9 salaries
unlock blur

₹5.4 L/yr - ₹7.6 L/yr

Senior Civil Engineer
8 salaries
unlock blur

₹3 L/yr - ₹8.6 L/yr

Explore more salaries
Compare Tulip Infratech with

Realty Assistant

3.9
Compare

Kunal Structure

3.7
Compare

Omkar Realtors and Developers Group

3.8
Compare

HM Group

4.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview