Upload Button Icon Add office photos

Filter interviews by

Tulip Infratech Interview Questions and Answers

Updated 24 Jan 2025

Tulip Infratech Interview Experiences

Popular Designations

7 interviews found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. RCC basics and design concepts
  • Q2. Geotechnical engineering tests
  • Q3. Building materials

Civil Site Supervisor Interview Questions asked at other Companies

Q1. Which survey in earths 🌍 measurement Survay carefully?
View answer (2)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Dec 2024.

Round 1 - HR 

(2 Questions)

  • Q1. What is the expected salary for this position?
  • Ans. 

    The expected salary for an Assistant Safety Officer varies depending on factors such as location, industry, experience, and qualifications.

    • Salaries can range from $40,000 to $70,000 per year.

    • Higher salaries are typically offered in industries such as oil and gas, construction, and manufacturing.

    • Experience and additional certifications can lead to higher salary offers.

    • Location also plays a significant role in determinin...

  • Answered by AI
  • Q2. What facilities will be available?

Assistant Safety Officer Interview Questions asked at other Companies

Q1. What is safety
View answer (25)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - HR 

(6 Questions)

  • Q1. Bar bending schedule
  • Q2. About the concrete
  • Q3. Site management
  • Q4. Planning & scheduling
  • Q5. Brickwork & mortar
  • Q6. Cement and his ration

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (22)

Store Officer Interview Questions & Answers

user image Anonymous

posted on 26 Sep 2022

I applied via Job Fair and was interviewed in Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Case Study 

Bihar board 12th pass and k y p computer course b.a 1 St year

Round 3 - Technical 

(3 Questions)

  • Q1. Computer knowledge data entry
  • Q2. Work knowledge supervision
  • Q3. Handover working knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Tulip infratech Pvt Ltd I have to work Store kipper ya data entry and supervision

Store Officer Interview Questions asked at other Companies

Q1. Maintaining stock Upload, Issue, Receipt of material in The System Define maximum & minimum stock level for all type materials. Generate nonmoving item list & highlight to concern H.O.D. Monitoring of all incoming material. Maintain... read more
View answer (1)

Tulip Infratech interview questions for popular designations

 QA QC Executive

 (1)

 Software Engineer

 (1)

 Assistant Safety Officer

 (1)

 Civil Engineer

 (1)

 Civil Site Supervisor

 (1)

 Store Officer

 (1)

 Store Incharge

 (1)

Interview Questionnaire 

3 Questions

  • Q1. Good Commuction
  • Q2. Any time quick response
  • Q3. Always your team work

Interview Preparation Tips

Interview preparation tips for other job seekers - no

Store Incharge Interview Questions asked at other Companies

Q1. if material purchase in party but some material in liquid and some has been expiared how would have in this case?
View answer (4)

Software Engineer Interview Questions & Answers

user image saumya raichurkar

posted on 20 Jul 2021

Interview Questionnaire 

1 Question

  • Q1. Oops concepts ,Database , MVC basic and C sharp concepts

Software Engineer Interview Questions asked at other Companies

Q1. Bridge and torch problem : Four people come to a river in the night. There is a narrow bridge, but it can only hold two people at a time. They have one torch and, because it's night, the torch has to be used when crossing the bridge. Person... read more
View answer (217)

Jobs at Tulip Infratech

View all

QA QC Executive Interview Questions & Answers

user image VISHNU BISHNOI

posted on 4 May 2019

Interview Questionnaire 

10 Questions

  • Q1. Sieve analysis of sand
  • Ans. 

    Sieve analysis is a method used to determine the particle size distribution of sand.

    • Sieve analysis involves passing a sample of sand through a series of sieves with different mesh sizes.

    • The sand is placed on the top sieve and shaken to separate particles based on size.

    • The weight of sand retained on each sieve is measured and used to calculate the percentage of sand in each size range.

    • The results of sieve analysis can b...

  • Answered by AI
  • Q2. Required capacity of ctm machine in KN to test a cube of m 40 grade
  • Ans. 

    The required capacity of the ctm machine in KN to test a cube of m 40 grade is dependent on the size of the cube and the testing standards.

    • The capacity of the ctm machine is determined by the maximum load it can apply to the cube during testing.

    • The cube size and testing standards determine the load requirements for testing.

    • The required capacity can be calculated using the formula: Required capacity = Cube size x Testin

  • Answered by AI
  • Q3. Plastering
  • Q4. Weight of cube
  • Ans. 

    The weight of a cube can be determined by measuring its dimensions and using the formula: weight = density x volume.

    • To determine the weight of a cube, measure its length, width, and height.

    • Calculate the volume of the cube by multiplying the length, width, and height.

    • Obtain the density of the material the cube is made of.

    • Multiply the density by the volume to get the weight of the cube.

  • Answered by AI
  • Q5. Precautions on cube mould before casting
  • Ans. 

    Precautions on cube mould before casting

    • Ensure the cube mould is clean and free from any debris or previous concrete residue

    • Apply a thin layer of oil or release agent to the inner surfaces of the mould to prevent sticking

    • Check for any cracks or damage in the mould and replace if necessary

    • Ensure the mould is properly aligned and securely fastened to prevent any leakage

    • Use a vibrating table or vibrating rod to remove any...

  • Answered by AI
  • Q6. Frequency of cubes casting
  • Ans. 

    The frequency of cubes casting refers to how often cubes are made for testing purposes.

    • The frequency of cubes casting depends on the project requirements and quality standards.

    • It is common to cast cubes at regular intervals during construction projects.

    • The frequency may vary based on factors such as the type of concrete being used and the project timeline.

    • For example, in a large-scale construction project, cubes may be...

  • Answered by AI
  • Q7. Types of Admixture and their role
  • Ans. 

    Admixtures are substances added to concrete or mortar to enhance its properties.

    • Water-reducing admixtures: reduce the amount of water needed for the desired workability of concrete.

    • Retarding admixtures: delay the setting time of concrete, allowing more time for placement and finishing.

    • Accelerating admixtures: speed up the setting time of concrete, useful in cold weather conditions.

    • Air-entraining admixtures: create smal...

  • Answered by AI
  • Q8. Water cement ratio and its effect on concrete
  • Ans. 

    Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix. It affects the strength and durability of concrete.

    • Water cement ratio determines the workability of concrete. Higher water content makes the mix more fluid and easier to work with.

    • Excess water in the mix can lead to segregation and bleeding, resulting in a weaker and less durable concrete.

    • A lower water cement ratio pr...

  • Answered by AI
  • Q9. How can we reduce the water cement ratio
  • Ans. 

    The water cement ratio can be reduced by using less water or increasing the amount of cement in the mixture.

    • Use a lower water content in the mix

    • Increase the amount of cement in the mix

    • Use additives or admixtures to improve workability without increasing water content

    • Optimize the particle size distribution of the aggregates

    • Use a higher grade of cement

  • Answered by AI
  • Q10. Mix design proportion

Top Tulip Infratech QA QC Executive Interview Questions and Answers

Q1. Required capacity of ctm machine in KN to test a cube of m 40 grade
View answer (1)

QA QC Executive Interview Questions asked at other Companies

Q1. If a team member is unable to carry out his work, he is doing it repetitively, how would you handle it?, would you like to work only on lifing of components, or would you be ready to shift to other departments?
View answer (1)

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Walk-in and was interviewed in Nov 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Brain stellar puzzles were asked

Round 2 - Coding Test 

Basic question on linked list and tree

Round 3 - HR 

(2 Questions)

  • Q1. What are your strength and weakness
  • Q2. What are your hobbies
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. In starting they say you can apply as a fresher but later they only takes experience persons
  • Q2. What you know about the area
  • Ans. 

    The area is known for its diverse culture, historical landmarks, and thriving business community.

    • The area has a rich history dating back to the colonial era

    • It is home to several museums and landmarks such as the Liberty Bell and Independence Hall

    • The area has a diverse population with a mix of ethnicities and cultures

    • There are several universities and colleges in the area, including the University of Pennsylvania and Te...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Tell about dwarka expressway
  • Ans. 

    Dwarka Expressway is a 27 km long, 8-lane expressway connecting Dwarka in Delhi to Gurgaon in Haryana.

    • It is also known as Northern Peripheral Road (NPR)

    • It is a major real estate hub with numerous residential and commercial projects

    • The expressway will provide seamless connectivity to Indira Gandhi International Airport and NH-8

    • It has faced delays and legal hurdles, but is now nearing completion

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Go only if you're experienced they don't take fresers and be prepared with the cv cross questions

Interview Questionnaire 

4 Questions

  • Q1. Different between two Stok and four stok engine?
  • Ans. 

    Two-stroke engines have a power stroke every revolution, while four-stroke engines have a power stroke every other revolution.

    • Two-stroke engines have a simpler design and are lighter than four-stroke engines.

    • Two-stroke engines have a higher power-to-weight ratio than four-stroke engines.

    • Four-stroke engines are more fuel-efficient and have a longer lifespan than two-stroke engines.

    • Two-stroke engines are commonly used in...

  • Answered by AI
  • Q2. Batching plant pain mixture servicing?
  • Ans. 

    Batching plant pain mixture servicing refers to the maintenance and repair of the equipment used to mix concrete.

    • Regular cleaning and inspection of the batching plant equipment

    • Replacing worn out parts and repairing any damages

    • Ensuring proper calibration of the equipment for accurate mixing

    • Regular lubrication of moving parts to prevent wear and tear

    • Training staff on proper use and maintenance of the equipment

  • Answered by AI
  • Q3. Hydraulic function of Bp1800 concrete pump?
  • Ans. 

    Bp1800 concrete pump has a hydraulic function for efficient pumping of concrete.

    • The hydraulic system of Bp1800 concrete pump helps in generating the required pressure to pump concrete.

    • It consists of hydraulic cylinders, pumps, and motors that work together to move the concrete through the pipeline.

    • The hydraulic function also helps in controlling the speed and direction of the pump.

    • The hydraulic oil used in the system h...

  • Answered by AI
  • Q4. Tower crane support mechanic function?
  • Ans. 

    A tower crane support mechanic is responsible for maintaining and repairing the tower crane's support system.

    • Inspecting and maintaining the tower crane's support system

    • Repairing or replacing damaged or worn-out parts

    • Ensuring the tower crane is stable and secure

    • Working with other members of the construction team to ensure safety and efficiency

    • Using specialized tools and equipment to perform maintenance and repairs

    • Keepin

  • Answered by AI

Tulip Infratech Interview FAQs

How many rounds are there in Tulip Infratech interview?
Tulip Infratech interview process usually has 1-2 rounds. The most common rounds in the Tulip Infratech interview process are Technical, HR and Resume Shortlist.
How to prepare for Tulip Infratech interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Tulip Infratech. The most common topics and skills that interviewers at Tulip Infratech expect are Administration, Construction, Residential, Communication Skills and High Rise Building.
What are the top questions asked in Tulip Infratech interview?

Some of the top questions asked at the Tulip Infratech interview -

  1. Required capacity of ctm machine in KN to test a cube of m 40 gr...read more
  2. How can we reduce the water cement ra...read more
  3. Precautions on cube mould before casti...read more

Tell us how to improve this page.

Tulip Infratech Interview Process

based on 5 interviews

Interview experience

4.4
  
Good
View more

Interview Questions from Similar Companies

DRA Homes Interview Questions
4.6
 • 23 Interviews
N.K. Realtors Interview Questions
4.2
 • 19 Interviews
JP Infra Interview Questions
3.8
 • 19 Interviews
DTC Projects Interview Questions
4.0
 • 17 Interviews
PS Group Interview Questions
3.8
 • 16 Interviews
ATS Homekraft Interview Questions
4.2
 • 16 Interviews
Bullmen Realty Interview Questions
3.0
 • 14 Interviews
View all

Tulip Infratech Reviews and Ratings

based on 80 reviews

3.7/5

Rating in categories

3.5

Skill development

3.6

Work-life balance

3.8

Salary

3.6

Job security

3.6

Company culture

3.5

Promotions

3.5

Work satisfaction

Explore 80 Reviews and Ratings
Human Resource Recruiter Male Only

Mumbai

5-10 Yrs

₹ 3-4.5 LPA

Explore more jobs
Civil Engineer
12 salaries
unlock blur

₹3.6 L/yr - ₹5.4 L/yr

Civil Site Engineer
10 salaries
unlock blur

₹2.2 L/yr - ₹4.2 L/yr

Site Engineer
10 salaries
unlock blur

₹2.4 L/yr - ₹7 L/yr

Senior Engineer
9 salaries
unlock blur

₹5.4 L/yr - ₹7.6 L/yr

Senior Civil Engineer
8 salaries
unlock blur

₹3 L/yr - ₹8.6 L/yr

Explore more salaries
Compare Tulip Infratech with

Realty Assistant

3.9
Compare

Kunal Structure

3.7
Compare

Omkar Realtors and Developers Group

3.7
Compare

HM Group

4.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview