Sieve analysis is a method used to determine the particle size distribution of sand.
Sieve analysis involves passing a sample of sand through a series of sieves with different mesh sizes.
The sand is placed on the top sieve and shaken to separate particles based on size.
The weight of sand retained on each sieve is measured and used to calculate the percentage of sand in each size range.
The results of sieve analysis can b...
The required capacity of the ctm machine in KN to test a cube of m 40 grade is dependent on the size of the cube and the testing standards.
The capacity of the ctm machine is determined by the maximum load it can apply to the cube during testing.
The cube size and testing standards determine the load requirements for testing.
The required capacity can be calculated using the formula: Required capacity = Cube size x Testin
The weight of a cube can be determined by measuring its dimensions and using the formula: weight = density x volume.
To determine the weight of a cube, measure its length, width, and height.
Calculate the volume of the cube by multiplying the length, width, and height.
Obtain the density of the material the cube is made of.
Multiply the density by the volume to get the weight of the cube.
Precautions on cube mould before casting
Ensure the cube mould is clean and free from any debris or previous concrete residue
Apply a thin layer of oil or release agent to the inner surfaces of the mould to prevent sticking
Check for any cracks or damage in the mould and replace if necessary
Ensure the mould is properly aligned and securely fastened to prevent any leakage
Use a vibrating table or vibrating rod to remove any...
The frequency of cubes casting refers to how often cubes are made for testing purposes.
The frequency of cubes casting depends on the project requirements and quality standards.
It is common to cast cubes at regular intervals during construction projects.
The frequency may vary based on factors such as the type of concrete being used and the project timeline.
For example, in a large-scale construction project, cubes may be...
Admixtures are substances added to concrete or mortar to enhance its properties.
Water-reducing admixtures: reduce the amount of water needed for the desired workability of concrete.
Retarding admixtures: delay the setting time of concrete, allowing more time for placement and finishing.
Accelerating admixtures: speed up the setting time of concrete, useful in cold weather conditions.
Air-entraining admixtures: create smal...
Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix. It affects the strength and durability of concrete.
Water cement ratio determines the workability of concrete. Higher water content makes the mix more fluid and easier to work with.
Excess water in the mix can lead to segregation and bleeding, resulting in a weaker and less durable concrete.
A lower water cement ratio pr...
The water cement ratio can be reduced by using less water or increasing the amount of cement in the mixture.
Use a lower water content in the mix
Increase the amount of cement in the mix
Use additives or admixtures to improve workability without increasing water content
Optimize the particle size distribution of the aggregates
Use a higher grade of cement
I appeared for an interview in Dec 2024.
I applied via Referral and was interviewed in Mar 2024. There was 1 interview round.
Tulip Infratech interview questions for popular designations
I applied via Job Fair and was interviewed in Aug 2022. There were 3 interview rounds.
I applied via Company Website and was interviewed before Dec 2020. There were 4 interview rounds.
I applied via Company Website and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2021. There were 2 interview rounds.
based on 5 interviews
Interview experience
based on 77 reviews
Rating in categories
Civil Engineer
12
salaries
| ₹3.6 L/yr - ₹5.4 L/yr |
Civil Site Engineer
10
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
Site Engineer
10
salaries
| ₹2.4 L/yr - ₹7 L/yr |
Senior Engineer
9
salaries
| ₹5.4 L/yr - ₹7.6 L/yr |
Senior Civil Engineer
8
salaries
| ₹3 L/yr - ₹8.6 L/yr |
DLF
Unitech
Sobha
Prestige Group