i
Transsion
Filter interviews by
Surface Mount Technology (SMT) is a method used to mount electronic components onto printed circuit boards (PCBs) using surface-mount devices (SMDs).
SMT involves placing components directly onto the surface of the PCB.
Components are soldered onto the PCB using reflow soldering or wave soldering techniques.
SMT allows for smaller and lighter electronic devices compared to through-hole technology.
Examples of SMT comp...
Views in creating material include cost, quality, availability, and sustainability.
Consider cost implications of materials chosen
Ensure quality meets project requirements
Check availability of materials in required quantities
Evaluate sustainability aspects of materials used
SAP MM stands for Materials Management, a module in SAP ERP system that manages procurement and inventory functions.
SAP MM helps in managing materials procurement, inventory management, and invoice verification processes.
It integrates with other modules like SAP SD (Sales and Distribution) and SAP PP (Production Planning).
SAP MM streamlines the procurement process by automating purchase orders, goods receipt, and ...
Path enterprise structure involves defining the hierarchy of business units, departments, and reporting relationships within an organization.
Start with the top-level entity, usually the company or organization itself
Identify the major divisions or business units within the organization
Break down each division into departments or functional areas
Establish reporting relationships between different levels of the stru...
Code for implementing single linked list
Define a Node class with data and next pointer
Create a LinkedList class with methods like insert, delete, search
Implement methods to traverse and display the linked list
A circular linked list is a linked list where the last node points back to the first node, creating a circular structure.
Each node has a reference to the next node in the list
The last node's reference points back to the first node
Traversal can start from any node in the list
I have 5 years of experience working with SMT mounting machines in a high-volume manufacturing environment.
Operated and maintained various SMT mounting machines such as pick and place, stencil printers, and reflow ovens
Troubleshooted and resolved issues related to machine programming, component placement, and soldering
Optimized machine settings to improve efficiency and quality of production
Collaborated with cross...
Material planning involves forecasting demand, determining inventory levels, and scheduling production.
Analyze historical sales data to forecast future demand
Determine optimal inventory levels to avoid stockouts and excess inventory
Collaborate with suppliers to ensure timely delivery of materials
Schedule production based on demand and inventory levels
Continuously monitor and adjust plans based on changes in demand...
7QC tools are a set of techniques used for quality control and improvement in manufacturing and service industries.
The 7QC tools include: Pareto chart, cause-and-effect diagram, check sheet, control chart, histogram, scatter diagram, and flowchart.
These tools help identify and solve problems, improve processes, and reduce waste and defects.
For example, a Pareto chart can be used to identify the most common causes ...
Expectations for Assistant Manager role
To manage and lead a team towards achieving organizational goals
To ensure smooth operations and customer satisfaction
To analyze data and make informed decisions
To communicate effectively with superiors, peers, and subordinates
To continuously improve processes and performance
I applied via Naukri.com and was interviewed in Dec 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Nov 2024. There was 1 interview round.
As an Assistant Manager, my job responsibilities include overseeing daily operations, managing staff, ensuring customer satisfaction, and assisting the manager in decision-making.
Overseeing daily operations to ensure smooth functioning of the business
Managing staff by delegating tasks, providing training, and resolving conflicts
Ensuring customer satisfaction by addressing complaints and feedback
Assisting the manager in...
I applied via Campus Placement and was interviewed in Jun 2023. There were 3 interview rounds.
A circular linked list is a linked list where the last node points back to the first node, creating a circular structure.
Each node has a reference to the next node in the list
The last node's reference points back to the first node
Traversal can start from any node in the list
Code for implementing single linked list
Define a Node class with data and next pointer
Create a LinkedList class with methods like insert, delete, search
Implement methods to traverse and display the linked list
I applied via Job Fair and was interviewed in Mar 2023. There were 3 interview rounds.
7QC tools are a set of techniques used for quality control and improvement in manufacturing and service industries.
The 7QC tools include: Pareto chart, cause-and-effect diagram, check sheet, control chart, histogram, scatter diagram, and flowchart.
These tools help identify and solve problems, improve processes, and reduce waste and defects.
For example, a Pareto chart can be used to identify the most common causes of de...
8D methodology is a problem-solving approach used to identify, correct and prevent recurring problems.
8D stands for 8 disciplines
It involves a team-based approach to problem-solving
The methodology includes steps such as defining the problem, identifying the root cause, implementing corrective actions, and preventing recurrence
It is commonly used in industries such as automotive, aerospace, and manufacturing
Example: If ...
Expectations for Assistant Manager role
To manage and lead a team towards achieving organizational goals
To ensure smooth operations and customer satisfaction
To analyze data and make informed decisions
To communicate effectively with superiors, peers, and subordinates
To continuously improve processes and performance
Psychometric Assessments based on internal competency framework
I manage disagreements by promoting open communication, active listening, and finding common ground.
Encourage open and honest communication to understand different perspectives
Practice active listening to ensure everyone feels heard and valued
Seek common ground and compromise to find a mutually beneficial solution
Mediate discussions and encourage respectful dialogue
Provide opportunities for team members to share their ...
I handled the toughest assignment in tight timelines by prioritizing tasks, delegating responsibilities, and working efficiently.
I assessed the tasks and identified the most critical ones that needed immediate attention.
I communicated with my team members and delegated tasks based on their strengths and availability.
I created a detailed timeline and action plan to ensure all tasks were completed within the given deadli...
To keep the team motivated during a last-minute project change, effective communication, providing support and resources, and recognizing their efforts are key.
Communicate the reasons behind the change and the potential benefits
Provide clear instructions and expectations for the new project
Offer support and resources to help the team adapt to the change
Recognize and appreciate the team's efforts and flexibility
Encourag...
I applied via LinkedIn and was interviewed before Sep 2022. There were 5 interview rounds.
I applied via Naukri.com
Uph , upph, lob ,ct, takt time , bottlenack, 7qc tools , 8 westage and etc .
Material planning involves forecasting demand, determining inventory levels, and scheduling production.
Analyze historical sales data to forecast future demand
Determine optimal inventory levels to avoid stockouts and excess inventory
Collaborate with suppliers to ensure timely delivery of materials
Schedule production based on demand and inventory levels
Continuously monitor and adjust plans based on changes in demand or s...
I applied via Monster and was interviewed in Oct 2022. There were 2 interview rounds.
Any time i am available except Sunday.
Top trending discussions
The duration of Transsion interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 32 interview experiences
Difficulty level
Duration
based on 635 reviews
Rating in categories
Assistant Engineer
130
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Engineer
100
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Quality Engineer
85
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
Area Sales Manager
84
salaries
| ₹4.1 L/yr - ₹14 L/yr |
Assistant Manager
82
salaries
| ₹5 L/yr - ₹10.5 L/yr |
Samsung
OPPO
LG Electronics
HARMAN