Upload Button Icon Add office photos

Transrail Lighting

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Transrail Lighting Assistant Manager - QA Interview Questions, Process, and Tips

Updated 5 Jan 2024

Transrail Lighting Assistant Manager - QA Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jan 2023. There were 2 interview rounds.

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Jan 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Basics of Electrical Engineering, some important formulae. Details of Internships & industrial training like what have you learnt, what was the industry process & discipline related questions with respect ...

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare & focus mainly on your final project.

I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. About planning scheduling costing budgeting of water supply projects
  • Q2. How soon can you join
  • Ans. 

    I can join within two weeks.

    • I am currently serving a two-week notice period at my current job.

    • I have already completed all necessary paperwork and background checks.

    • I am ready to start as soon as possible.

    • I can adjust my start date based on the company's requirements.

  • Answered by AI
  • Q3. Process of recruitment is too lengthy
  • Q4. Three rounds conducted
  • Q5. Why did you left last company
  • Ans. 

    I left my last company to pursue new opportunities and challenges.

    • Seeking growth and advancement in my career

    • Looking for a company with a better cultural fit

    • Wanting to broaden my skill set

    • Desire for a higher level of responsibility

    • Company downsizing or restructuring

  • Answered by AI
  • Q6. Relation with previous bosses

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer very clearly honestly and politly

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Improve technical knowledge and site management

I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Interviewer asked me about last activity process , material quality, more technical questions, and cost analysis of last projects.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majority a stress test.it lasted about 1hr 45 minutes.i tried to answer every question with example.

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to explain basic concepts clearly

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mainly consantraint for pump and high temp lines and material.

Interview Preparation Tips

Interview preparation tips for other job seekers - As above questions mention
Contribute & help others!
anonymous
You can choose to be anonymous

Transrail Lighting Interview FAQs

How many rounds are there in Transrail Lighting Assistant Manager - QA interview?
Transrail Lighting interview process usually has 2 rounds. The most common rounds in the Transrail Lighting interview process are Technical and HR.
What are the top questions asked in Transrail Lighting Assistant Manager - QA interview?

Some of the top questions asked at the Transrail Lighting Assistant Manager - QA interview -

  1. Do you know the Grade of material and fabrication proce...read more
  2. What about CAPA against customer complain...read more
  3. Do you know root cause analys...read more

Recently Viewed

INTERVIEWS

Transrail Lighting

No Interviews

LIST OF COMPANIES

Ramky Infrastructure

Locations

INTERVIEWS

Ramky Infrastructure

No Interviews

INTERVIEWS

Ramky Infrastructure

40 top interview questions

REVIEWS

L & W Constructions

No Reviews

SALARIES

Ramky Infrastructure

REVIEWS

Ramky Infrastructure

No Reviews

INTERVIEWS

Transrail Lighting

No Interviews

INTERVIEWS

Transrail Lighting

20 top interview questions

SALARIES

Leighton Contractors

Tell us how to improve this page.

Transrail Lighting Assistant Manager - QA Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 744 Interviews
Tata Projects Interview Questions
4.2
 • 425 Interviews
TCE Interview Questions
3.8
 • 248 Interviews
Havells Interview Questions
4.0
 • 209 Interviews
Bajaj Electricals Interview Questions
4.0
 • 124 Interviews
AECOM Interview Questions
4.2
 • 114 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
View all
Assistant Manager
97 salaries
unlock blur

₹5.2 L/yr - ₹12.6 L/yr

Senior Engineer
65 salaries
unlock blur

₹4.3 L/yr - ₹9.4 L/yr

Deputy Manager
54 salaries
unlock blur

₹6 L/yr - ₹16.5 L/yr

Assistant Engineer
54 salaries
unlock blur

₹3 L/yr - ₹5.2 L/yr

Engineer
51 salaries
unlock blur

₹4 L/yr - ₹7.2 L/yr

Explore more salaries
Compare Transrail Lighting with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview