Filter interviews by
I applied via Naukri.com and was interviewed in Oct 2021. There was 1 interview round.
I applied via Referral and was interviewed before Nov 2021. There were 3 interview rounds.
SAP is a software company that provides enterprise resource planning (ERP) solutions for businesses.
SAP stands for Systems, Applications, and Products in Data Processing.
It offers a range of software solutions for various business functions such as finance, human resources, supply chain management, and customer relationship management.
SAP ERP helps businesses streamline their operations, improve efficiency, and make da...
SAP and Store Management, Material Planing
posted on 31 Jan 2023
I applied via Naukri.com and was interviewed before Jan 2022. There were 2 interview rounds.
Tractebel interview questions for popular designations
Get interview-ready with Top Tractebel Interview Questions
I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.
I applied via Company Website and was interviewed before Apr 2020. There were 3 interview rounds.
Layout of combined cycle power plant with different structures and components.
Combined cycle power plant consists of gas turbine, heat recovery steam generator, and steam turbine.
Gas turbine generates electricity by burning natural gas or oil.
Heat recovery steam generator recovers waste heat from gas turbine exhaust and generates steam.
Steam turbine generates additional electricity using the steam produced by heat reco...
Designing machine foundation for gas turbine involves several factors and types of foundations.
Factors to consider include soil type, turbine size and weight, seismic activity, and environmental conditions.
Types of foundations include block, pile, and raft foundations.
Block foundations are suitable for smaller turbines on stable soil.
Pile foundations are used for larger turbines or unstable soil.
Raft foundations are us...
Ductile detailing for beam, column, and foundation involves following IS codes and ensuring proper reinforcement placement.
For beams, IS 13920 is followed and reinforcement is placed at the bottom of the beam.
For columns, IS 13920 and IS 456 are followed and reinforcement is placed in a spiral pattern.
For foundations, IS 13920 and IS 2911 are followed and reinforcement is placed in a specific pattern based on the type ...
Pile foundations are used to transfer loads from structures to soil. Different types include driven piles, bored piles, and screw piles.
Driven piles are installed by hammering or vibrating them into the ground.
Bored piles are created by drilling a hole and then filling it with concrete and steel reinforcement.
Screw piles are twisted into the ground using a hydraulic motor.
Design considerations include soil type, load c...
Shear walls are designed to resist lateral forces. Detailing includes reinforcement placement and anchorage.
Design shear walls based on the building code requirements and structural analysis.
Select appropriate materials and thickness for the shear wall.
Detail the reinforcement placement and anchorage to ensure proper load transfer.
Provide adequate boundary elements and openings for ducts and pipes.
Consider seismic and ...
I have experience with various software for structural analysis.
STAAD.Pro
SAP2000
ETABS
ANSYS
AutoCAD Structural Detailing
To model raft foundation or shear wall in finite element method, one needs to follow certain steps.
First, create a 3D model of the foundation or wall using a CAD software.
Next, import the model into a finite element analysis software.
Define the material properties and boundary conditions.
Mesh the model to create finite elements.
Solve the model to obtain the stresses and displacements.
Finally, analyze the results and ma...
Water retaining structures are designed as per IS code and crack width is limited to ensure safety.
Design of water retaining structures involves determining the loads, selecting materials, and ensuring stability.
IS 3370 is the code used for design of water retaining structures in India.
The crack width for water retaining structures is limited to 0.2 mm to ensure safety and prevent leakage.
Various types of water retaini...
Yes, I have worked with both American and British codes.
I have experience working with the International Building Code (IBC) which is based on American codes.
I have also worked with British Standards (BS) such as BS 5950 for structural steel design.
I am familiar with the differences between the two codes and can adapt accordingly.
Different load combinations for RCC and Steel structures.
Load combinations for RCC structures include dead load, live load, wind load, earthquake load, and temperature load.
Load combinations for Steel structures include dead load, live load, wind load, earthquake load, temperature load, and snow load.
Load combinations are determined based on the design codes and standards applicable to the project.
The load combinations...
Yes, I have extensive experience in site inspections and creating progress and quality reports.
I have conducted site inspections for various projects in my previous roles.
I am proficient in creating detailed progress and quality reports based on my observations during site inspections.
I have also implemented corrective actions based on the findings of my inspections to ensure project success.
For example, in my previous...
To draw a bending moment and shear force diagram for a portal frame with lateral force and UDL.
Calculate the reactions at the supports
Determine the shear force and bending moment at each section
Plot the shear force and bending moment diagrams
Identify the maximum shear force and bending moment
Consider the sign conventions for shear force and bending moment
Use appropriate software or tools for accurate results
I applied via Naukri.com and was interviewed before Jun 2021. There were 2 interview rounds.
Yes, I have experience in Water Supply Projects.
I have worked on multiple water supply projects in the past.
I have experience in designing and implementing water supply systems.
I have knowledge of the latest technologies and materials used in water supply projects.
I have experience in managing teams and ensuring timely completion of projects.
One of my recent projects involved designing and implementing a water supply s
My expected remuneration package is competitive and reflective of my experience and skills.
I am looking for a salary in line with industry standards and my level of expertise
I am open to negotiation based on the specific responsibilities and benefits offered
I am also interested in opportunities for professional development and growth
Examples of benefits I value include health insurance, retirement plans, and flexible w
I applied via Approached by Company and was interviewed before Jun 2021. There were 3 interview rounds.
Top trending discussions
Some of the top questions asked at the Tractebel interview -
The duration of Tractebel interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 29 interviews
Interview experience
based on 399 reviews
Rating in categories
Site Engineer
129
salaries
| ₹3.8 L/yr - ₹8 L/yr |
Project Management Consultant
54
salaries
| ₹4.1 L/yr - ₹6.8 L/yr |
Manager
52
salaries
| ₹10 L/yr - ₹22 L/yr |
Senior Engineer
51
salaries
| ₹4.8 L/yr - ₹9.5 L/yr |
Senior Manager
46
salaries
| ₹12.3 L/yr - ₹31.9 L/yr |
Tata Power
Adani Power
NTPC
BHEL