Grade of concrete and IS code of steel are important aspects of civil engineering.
Grade of concrete refers to the strength of the concrete mix and is denoted by a number such as M20, M30, etc.
IS code of steel refers to the Indian Standard code for steel used in construction, which is IS 2062.
The grade of concrete and IS code of steel are important factors to consider when designing and constructing buildings and infras...
Yes, code of concrete is a reconciliation material.
Code of concrete provides guidelines for the design, construction, and testing of concrete structures.
It helps in ensuring the safety, durability, and sustainability of concrete structures.
Code of concrete also includes provisions for quality control and quality assurance of concrete materials and construction practices.
Examples of code of concrete include ACI 318, Eur
I applied via Naukri.com and was interviewed before Nov 2019. There was 1 interview round.
Design parameters for steel structure
Load capacity and distribution
Material strength and durability
Environmental factors such as wind and seismic activity
Connection details and joint design
Fire resistance and protection measures
I have 5 years of exposure to STAAD software.
I have used STAAD for various structural analysis and design projects.
I am proficient in using STAAD for modeling, analysis, and design of steel and concrete structures.
I have experience in using STAAD for seismic analysis and design of structures.
I have also used STAAD for foundation design and analysis.
I keep myself updated with the latest versions and features of STAAD so
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.
BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.
The bending moment will be maximum at the points where the frame experiences maximum sway.
The BMD can be drawn by analyzing the internal forces and moments acting on the frame.
Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.
Start by determining the dimensions and layout of the piperack
Use software like AutoCAD to create accurate and detailed drawings
Include all necessary details such as pipe sizes, supports, and connections
Label all components clearly for easy understanding
Review and revise the drawings as needed for accuracy
I applied via Walk-in and was interviewed before Sep 2022. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Jul 2022. There were 2 interview rounds.
Very basic level aptitude test and civil engineering subjects test.
Bending moment diagram of a fixed beam subjected to udl throughout the whole length.
Calculate the reactions at the supports of the beam
Determine the equation for bending moment at any point along the beam
Plot the bending moment diagram with positive and negative values
The bending moment will be maximum at the supports and zero at the midpoint of the beam
Bending moment diagram of a 1-bay, 1-storey portal frame with point load at column middle.
Calculate reactions at supports
Determine internal forces at critical points
Plot bending moment diagram using equations or software
Identify maximum bending moment and its location
M stands for mix design in M-20 concrete, indicating the compressive strength of the concrete mix.
M-20 concrete is a mix design where 'M' represents the compressive strength of the concrete after 28 days of curing.
The number '20' in M-20 concrete indicates the characteristic compressive strength of concrete in N/mm^2.
Different grades of concrete have different compressive strength requirements, with M-20 being a common
IS 10262 is required for mix design in civil engineering.
IS 10262 is the code for concrete mix design in India.
It provides guidelines for proportioning of concrete ingredients based on strength and durability requirements.
The code covers various aspects such as water-cement ratio, workability, and compressive strength.
Mix design is crucial for ensuring the desired properties and performance of concrete.
Following the co...
Earthquake design of a multi storey building involves analyzing seismic forces, selecting appropriate structural systems, and implementing design measures to ensure safety.
Analyze seismic forces based on the building location and seismic zone
Select appropriate structural systems such as reinforced concrete or steel frames
Implement design measures like base isolation, dampers, and shear walls to enhance building's seism
Design process of one-way and two-way slabs and their differences
One-way slab design involves calculating bending moments and shear forces along one direction, typically supported on two opposite sides. Two-way slab design considers bending moments and shear forces in both directions, usually supported on all four sides.
One-way slab design is simpler and more common in practice, while two-way slab design is more comple...
Dynamic method considers time history of earthquake while equivalent static method simplifies earthquake forces into equivalent static forces.
Dynamic method analyzes building response to actual time history of earthquake ground motion.
Equivalent static method simplifies earthquake forces into equivalent static forces based on simplified assumptions.
Dynamic method is more accurate but computationally intensive, while eq...
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.
Managed various projects including software development, system integration, and process improvement.
Led a team in developing a new software application for streamlining customer data management
Implemented system integration solutions to improve communication between different departments
Executed process improvement initiatives to increase efficiency and reduce costs
Collaborated with cross-functional teams to ensure pr
Continuous learning, growth, challenging projects, leadership opportunities, work-life balance
Continuous learning and skill development through training and certifications
Opportunities for career growth and advancement
Challenging projects that allow for problem-solving and innovation
Leadership opportunities to mentor and guide junior team members
Maintaining a healthy work-life balance to prevent burnout
I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.
P6 is a project management software used for scheduling, Float is the amount of time an activity can be delayed without delaying the project, Critical activities are tasks that must be completed on time to prevent project delays.
P6 is a software used for project scheduling and management
Float is the amount of time an activity can be delayed without affecting the project deadline
Critical activities are tasks that have z...
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
Site Engineer
128
salaries
| ₹3.8 L/yr - ₹8 L/yr |
Project Management Consultant
54
salaries
| ₹4.1 L/yr - ₹6.8 L/yr |
Manager
53
salaries
| ₹10 L/yr - ₹22.5 L/yr |
Senior Manager
46
salaries
| ₹12.3 L/yr - ₹31.9 L/yr |
Deputy Manager
45
salaries
| ₹6 L/yr - ₹15 L/yr |
AECOM
AtkinsRealis
McDermott International
Bechtel