I applied via Company Website and was interviewed before Mar 2023. There were 2 interview rounds.
Production norms for a 36" diameter pipeline are determined based on factors such as material, pressure, and flow rate.
Production norms for a 36" diameter pipeline will vary depending on the material of the pipeline (e.g. steel, PVC), the pressure it needs to withstand, and the desired flow rate.
Factors such as the type of fluid being transported, environmental conditions, and regulatory requirements also play a role i...
Fabrication norms for spools up to 36" diameter involve specific welding procedures, material specifications, and quality control measures.
Welding procedures must adhere to ASME standards for pressure piping.
Material specifications should meet project requirements and industry standards.
Quality control measures include non-destructive testing (NDT) such as radiography and ultrasonic testing.
Spools may require post-weld...
I have extensive experience in supervising multidisciplinary construction activities, ensuring coordination and efficiency.
Experience in overseeing various construction activities such as civil, mechanical, electrical, and structural work
Ability to coordinate with different teams and stakeholders to ensure smooth progress of projects
Knowledge of construction regulations and standards to ensure compliance
Strong communic...
Top trending discussions
Experienced Planning Engineer with a background in civil engineering and a proven track record of successfully managing projects.
Bachelor's degree in Civil Engineering
5+ years of experience in planning and managing construction projects
Proficient in project management software such as Primavera P6
Strong analytical and problem-solving skills
Excellent communication and teamwork abilities
In 5 years, I see myself as a senior Planning Engineer leading a team on major projects and contributing to the growth of the company.
Leading a team of planning engineers on major projects
Contributing to the growth and success of the company
Continuing to enhance my skills and knowledge in planning and project management
Possibly pursuing further certifications or advanced degrees in the field
posted on 23 Apr 2024
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
Delay analysis methods are used to determine the causes and impacts of project delays.
There are various methods of delay analysis such as Critical Path Method (CPM), Time Impact Analysis (TIA), Impacted As-Planned, and As-Built.
Each method has its own advantages and limitations, and the choice of method depends on the specific circumstances of the project.
CPM is a commonly used method that analyzes the project schedule...
posted on 8 Apr 2024
I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Dec 2021. There were 2 interview rounds.
posted on 15 Jun 2022
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 2 interview rounds.
based on 1 review
Rating in categories
Site Engineer
125
salaries
| ₹3.8 L/yr - ₹8 L/yr |
Manager
52
salaries
| ₹10 L/yr - ₹23 L/yr |
Project Management Consultant
52
salaries
| ₹3.6 L/yr - ₹6.8 L/yr |
Senior Manager
49
salaries
| ₹12.3 L/yr - ₹31.9 L/yr |
Deputy Manager
45
salaries
| ₹6 L/yr - ₹17 L/yr |
Tata Power
Adani Power
NTPC
BHEL