Filter interviews by
I applied via Recruitment Consulltant and was interviewed before May 2022. There were 3 interview rounds.
Procurement process involves identifying needs, selecting suppliers, negotiating contracts, and managing relationships.
Identify needs and requirements
Select suppliers and evaluate their capabilities
Negotiate contracts and terms
Manage relationships with suppliers
Ensure compliance with regulations and policies
Monitor performance and make improvements
Collaborate with stakeholders to align procurement strategy with busines
Top trending discussions
posted on 31 Aug 2022
I applied via Naukri.com and was interviewed in Jul 2022. There were 3 interview rounds.
posted on 1 Jul 2021
OEE stands for Overall Equipment Efficiency. It is a measure of how effectively a manufacturing operation is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability measures the percentage of time that equipment is available for production.
Performance measures the speed at which the equipment operates compared to its designed speed.
Quality measures the percentage of good-quality pr...
Production planning in shopfloor involves creating a detailed plan for manufacturing processes to ensure efficient and timely production.
Production planning involves determining the sequence of operations, resources required, and estimated time for each task.
It includes creating a production schedule, allocating resources, and coordinating with different departments.
The goal is to optimize production, minimize downtime...
Productivity is the measure of efficiency and output in relation to the resources used.
Productivity is a measure of how efficiently resources are used to produce goods or services.
It is the ratio of output to input, indicating how much is produced per unit of input.
Higher productivity means achieving more output with the same or fewer resources.
For example, in manufacturing, productivity can be measured by the number o...
5S is a methodology used to organize and maintain a clean, efficient, and safe work environment.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workplace.
Set in Order focuses on arranging necessary items in a logical and efficient manner.
Shine involves cleaning and maintaining the workplace.
Standardize establishes guidelines and procedures for maintain...
I applied via Walk-in
I applied via Naukri.com and was interviewed before Aug 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Dec 2023. There was 1 interview round.
About past experience
I applied via Company Website and was interviewed in Dec 2022. There were 3 interview rounds.
Self introduction and education and family background and 5s
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 3 interview rounds.
I applied via Campus Placement and was interviewed in Nov 2023. There was 1 interview round.
I applied via Walk-in and was interviewed before Oct 2023. There was 1 interview round.
Shift ownership issues can arise due to miscommunication, lack of accountability, or unclear procedures.
Ensure clear communication about shift responsibilities and handover procedures
Establish accountability among team members for their assigned shifts
Implement a system for tracking shift ownership and handovers
Address any conflicts or misunderstandings promptly to prevent escalation
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Engineer
98
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
96
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
48
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
46
salaries
| ₹0 L/yr - ₹0 L/yr |
Supervisor
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Bosch
Samvardhana Motherson Group
ZF Commercial Vehicle Control Systems
Endurance Technologies