Filter interviews by
I applied via campus placement at Government College of Engineering, Salem and was interviewed in Nov 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Aug 2022. There were 3 interview rounds.
Top trending discussions
Production planning is the process of determining the resources needed to achieve production goals and scheduling their use.
Analyzing demand forecasts to determine production requirements
Identifying available resources such as raw materials, equipment, and labor
Creating a production schedule to optimize resource utilization
Monitoring production progress and adjusting plans as needed
Ensuring timely delivery of finished
I have extensive experience in handling manpower in various production environments.
Managed a team of 20 production workers in a manufacturing plant
Developed and implemented training programs for new hires to improve efficiency
Scheduled shifts and assignments to ensure optimal productivity
Addressed employee concerns and conflicts to maintain a positive work environment
I applied via LinkedIn and was interviewed in Nov 2024. There were 2 interview rounds.
I implemented new production processes and technologies to improve efficiency and quality.
Introduced automated systems to streamline production processes
Implemented lean manufacturing principles to reduce waste and improve productivity
Led training sessions for employees to ensure smooth transition to new processes
Collaborated with cross-functional teams to identify areas for improvement
I was interviewed in Dec 2024.
posted on 28 Dec 2024
I applied via Walk-in and was interviewed in Jun 2024. There was 1 interview round.
OEE stands for Overall Equipment Effectiveness and is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability is the ratio of operating time to planned production time.
Performance is the ratio of actual production to maximum possible production.
Quality is the ratio of good parts to total parts produced.
OEE = Availability x Performa...
G code and M code are machine codes used in CNC programming to control the movements and functions of a machine tool.
G code is used to control the movements of the machine, such as linear or circular interpolation.
M code is used to control auxiliary functions of the machine, such as turning on or off coolant or spindle rotation.
G codes are typically used for positioning and feed rate control, while M codes are used for...
I have used software to create programs.
I have used software like AutoCAD, SolidWorks, and MATLAB to create programs for production engineering.
Using software allows for more precise and efficient programming compared to manual methods.
Software also helps in simulating and testing programs before implementation.
posted on 3 Feb 2025
Online test conducted for 1 hour atlest
based on 4 interviews
Interview experience
based on 11 reviews
Rating in categories
Assistant Manager
138
salaries
| ₹4.6 L/yr - ₹9 L/yr |
Senior Engineer
108
salaries
| ₹3 L/yr - ₹6.5 L/yr |
Deputy Manager
80
salaries
| ₹6.2 L/yr - ₹14.3 L/yr |
Quality Inspector
55
salaries
| ₹1.1 L/yr - ₹3.5 L/yr |
Senior Executive
47
salaries
| ₹3.2 L/yr - ₹7 L/yr |
Sundaram Clayton
Amara Raja Energy & Mobility
Samvardhana Motherson Group
Bharat Forge