Filter interviews by
The Production Approval process involves daily reporting of production targets to ensure goals are being met.
The Production Approval process involves obtaining approval for production activities to ensure compliance with regulations and standards.
Daily production targets report includes information on the quantity of products produced, any deviations from the targets, and reasons for any discrepancies.
The report helps ...
I applied via Recruitment Consulltant and was interviewed in May 2023. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in May 2023. There were 3 interview rounds.
Top trending discussions
I applied via Walk-in and was interviewed before Dec 2021. There were 2 interview rounds.
The project involved designing and implementing a new production process to improve efficiency and reduce costs.
Identify areas for improvement in current production process
Research and analyze different production methods and technologies
Design and implement new production process
Test and optimize the new process for efficiency and cost-effectiveness
Overcoming is the act of successfully dealing with or overcoming a challenge, obstacle, or difficulty.
Identifying the challenge or obstacle
Developing a plan or strategy to address it
Taking action to implement the plan
Persisting through setbacks or failures
Learning from the experience to improve future outcomes
Mathamatics resoning
I applied via Company Website and was interviewed before Dec 2021. There were 2 interview rounds.
Maintain production quantity and quality output by optimizing processes, training employees, and monitoring performance.
Regularly review and optimize production processes to eliminate inefficiencies and reduce waste.
Provide ongoing training and development opportunities for employees to improve their skills and knowledge.
Implement quality control measures to ensure that products meet or exceed customer expectations.
Mon...
I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
Torque is a twisting force that causes rotation, while force is a push or pull that causes an object to move or change direction.
Torque is measured in units of force multiplied by distance, such as newton-meters or pound-feet.
Force is measured in units of mass multiplied by acceleration, such as newtons or pounds.
Torque is important in rotating machinery, such as engines and motors.
Force is important in many applicatio...
Assembly line processing is a manufacturing process where a product is assembled in a sequential manner by different workers or machines.
It involves dividing the production process into smaller tasks
Each worker or machine performs a specific task in a sequential manner
The product moves from one station to another until it is completed
It increases efficiency and reduces production time and cost
Examples include automobil...
TSV stands for Test Specification and Verification. Testing process involves planning, designing, executing and reporting tests.
TSV is a document that outlines the testing requirements and procedures
Testing process involves identifying test scenarios and cases
Test cases are executed and results are recorded
Defects are reported and retested until resolved
Final test report is generated
Take time, cycle time, and lead time are important metrics in production engineering.
Take time is the time required to complete a single unit of production.
Cycle time is the time required to complete a single step in the production process.
Lead time is the time required to complete an entire production process from start to finish.
Reducing cycle time can increase production efficiency.
Reducing lead time can improve cus...
OEE stands for Overall Equipment Effectiveness and PPLH stands for Production Per Labor Hour.
OEE is a metric used to measure the efficiency of manufacturing processes.
It takes into account three factors: availability, performance, and quality.
PPLH is a metric used to measure the productivity of labor in manufacturing processes.
It is calculated by dividing the total production output by the total labor hours.
Both OEE an...
Line balancing is the process of optimizing workloads across a production line. Loss cycle time refers to the time lost due to inefficiencies in the production process.
Line balancing involves analyzing the production process to ensure that each workstation is being utilized efficiently
The goal of line balancing is to minimize idle time and maximize productivity
Loss cycle time refers to the time lost due to factors such...
TPM stands for Total Productive Maintenance and TQM stands for Total Quality Management.
TPM is a maintenance program that aims to maximize equipment effectiveness and minimize downtime.
TQM is a management approach that focuses on continuous improvement of product quality and customer satisfaction.
TPM involves all employees in the maintenance process and emphasizes preventive maintenance.
TQM involves all employees in th...
JH and JH steps are quality control methodologies used in manufacturing. 5S is a workplace organization method.
JH stands for Job Handling and JH steps are a set of procedures used to ensure quality control in manufacturing processes.
5S is a workplace organization method that involves sorting, simplifying, sweeping, standardizing, and sustaining.
JH steps and 5S are often used together to improve efficiency and quality i
FIFO and LIFO are inventory management methods used to manage stock and determine the cost of goods sold.
FIFO stands for First-In, First-Out, which means that the first items purchased are the first items sold.
LIFO stands for Last-In, First-Out, which means that the last items purchased are the first items sold.
FIFO is commonly used in industries where perishable goods are sold, such as food and beverage.
LIFO is common...
FRL unit is a filter, regulator, and lubricator unit used in compressed air systems. Solenoid valves are electromechanical valves used to control the flow of fluids.
FRL unit is used to filter, regulate, and lubricate compressed air in pneumatic systems
Solenoid valves are used to control the flow of fluids in various applications
Solenoid valves are electromechanical valves that use an electric current to control the val...
Some of the top questions asked at the NBC Bearings Production Engineer interview -
based on 3 interviews
Interview experience
based on 23 reviews
Rating in categories
Assistant Manager
221
salaries
| ₹0 L/yr - ₹0 L/yr |
Diploma Engineer
196
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
112
salaries
| ₹0 L/yr - ₹0 L/yr |
Diploma Mechanical Engineer
109
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate Manager
102
salaries
| ₹0 L/yr - ₹0 L/yr |
SKF
Timken
Schaeffler India
Ntn Bearing