Filter interviews by
Clear (1)
Online test conducted for 1 hour atlest
I applied via Walk-in and was interviewed in May 2023. There were 2 interview rounds.
The 7 wastes of production are categories of waste that can occur in manufacturing processes.
Transportation: Unnecessary movement of materials or products
Inventory: Excess inventory leading to storage costs and potential waste
Motion: Unnecessary movement of workers
Waiting: Idle time during production processes
Overproduction: Producing more than needed
Overprocessing: Using more resources than necessary
Defects: Errors le
Lean manufacturing is a production method focused on minimizing waste and maximizing efficiency.
Focuses on eliminating waste in all forms, including time, materials, and resources
Involves continuous improvement and problem-solving to streamline processes
Emphasizes value creation for the customer
Utilizes tools such as 5S, Kanban, and Kaizen
Promotes a culture of employee involvement and empowerment
Kaizen is a Japanese term meaning continuous improvement. There are several types of Kaizen, including Gemba Kaizen, Flow Kaizen, and Process Kaizen.
Kaizen is a Japanese business philosophy focused on continuous improvement.
Gemba Kaizen involves making improvements at the workplace where the work is done.
Flow Kaizen focuses on improving the flow of work or processes.
Process Kaizen involves making improvements to specif
Top trending discussions
I applied via Walk-in and was interviewed before May 2022. There were 3 interview rounds.
I have experience in optimizing production processes and improving efficiency.
Implemented lean manufacturing principles to reduce waste and increase productivity
Developed and implemented standard operating procedures to ensure consistent quality
Identified and resolved bottlenecks in production line to improve throughput
Collaborated with cross-functional teams to implement process improvements
Utilized data analysis to i...
I applied via Company Website and was interviewed before Jan 2023. There was 1 interview round.
I applied via Walk-in and was interviewed before Sep 2020. There was 1 interview round.
I am a production engineer with experience in optimizing manufacturing processes and ensuring efficient production.
Experienced production engineer
Skilled in optimizing manufacturing processes
Ensuring efficient production
Strong knowledge of production equipment and technologies
Proficient in analyzing data and implementing improvements
Collaborative team player
I was a Senior Production Engineer in my previous company.
I held the position of Senior Production Engineer.
I was responsible for overseeing production processes and ensuring efficiency.
I worked closely with the production team to identify and resolve any issues.
I implemented improvements to optimize production output and reduce costs.
I collaborated with other departments to coordinate production schedules and meet dea...
As a Production Engineer, my role is to oversee the manufacturing process, optimize production efficiency, and ensure quality control.
Overseeing the manufacturing process
Optimizing production efficiency
Ensuring quality control
Identifying and resolving production issues
Implementing process improvements
Collaborating with cross-functional teams
Monitoring production metrics and analyzing data
Creating and maintaining produc
DFT in painting stands for Dry Film Thickness.
DFT is the thickness of the paint film after it has dried.
It is measured using a coating thickness gauge.
The DFT is important for ensuring proper protection and appearance of the painted surface.
For example, a coating may require a minimum DFT of 2 mils to provide adequate corrosion protection.
DFT can also affect the drying time and curing of the paint.
Dry film thickness refers to the thickness of a coating after it has dried and cured.
It is measured using a coating thickness gauge.
It is important to ensure that the dry film thickness meets the specifications for the coating.
The dry film thickness can affect the performance and durability of the coating.
Examples of coatings that require specific dry film thickness include paint, powder coating, and plating.
Dry film t...
Excess DFT can lead to increased cost and longer production time.
Excess DFT can lead to increased material usage and waste.
It can also lead to longer production time and increased cost.
The excess DFT may also affect the performance and durability of the product.
It is important to ensure that the DFT is within the specified range to avoid these issues.
I applied via Recruitment Consultant and was interviewed in Sep 2021. There was 1 interview round.
I was interviewed in Jan 2022.
I applied via Naukri.com and was interviewed in Apr 2022. There were 3 interview rounds.
All types Of questions
I applied via Recruitment Consulltant and was interviewed in Jul 2021. There was 1 interview round.
based on 2 interviews
Interview experience
based on 19 reviews
Rating in categories
Process Engineer
212
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Officer
104
salaries
| ₹0 L/yr - ₹0 L/yr |
Section Leader
103
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
95
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive
59
salaries
| ₹0 L/yr - ₹0 L/yr |
Ingram Micro
Redington
Tech Data
SYNNEX Corporation