Q. What are PPL and PPLH?
Ans. 

PPL stands for Production Per Labour and PPLH stands for Production Per Labour Hour.

  • PPL is a measure of how much production is achieved per unit of labor input.

  • PPLH is a measure of how much production is achieved per labor hour.

  • Both metrics are used to evaluate the efficiency of production processes.

  • For example, if a factory produces 100 units with 10 workers, the PPL would be 10 units per worker.

  • If the same facto...

A Production Engineer was asked
Q. What are JH and JH steps, and what is 5S?
Ans. 

JH and JH steps are quality control methodologies used in manufacturing. 5S is a workplace organization method.

  • JH stands for Job Handling and JH steps are a set of procedures used to ensure quality control in manufacturing processes.

  • 5S is a workplace organization method that involves sorting, simplifying, sweeping, standardizing, and sustaining.

  • JH steps and 5S are often used together to improve efficiency and qual...

Production Engineer Interview Questions Asked at Other Companies

Q1. How do you detect faults in robots?
asked in Foxconn
Q2. If product A fails in the last stage, what is the root cause?
Q3. Did you know about soldering and what is the criteria for solderi ... read more
Q4. What is the minimum value that can be measured by a vernier calip ... read more
Q5. What is the difference between mass production and batch producti ... read more
A Production Engineer was asked
Q. What are cycle time and lead time?
Ans. 

Take time, cycle time, and lead time are important metrics in production engineering.

  • Take time is the time required to complete a single unit of production.

  • Cycle time is the time required to complete a single step in the production process.

  • Lead time is the time required to complete an entire production process from start to finish.

  • Reducing cycle time can increase production efficiency.

  • Reducing lead time can improv...

A Production Engineer was asked
Q. What is assembly line processing?
Ans. 

Assembly line processing is a manufacturing process where a product is assembled in a sequential manner by different workers or machines.

  • It involves dividing the production process into smaller tasks

  • Each worker or machine performs a specific task in a sequential manner

  • The product moves from one station to another until it is completed

  • It increases efficiency and reduces production time and cost

  • Examples include auto...

A Production Engineer was asked
Q. What is line balancing and loss cycle time?
Ans. 

Line balancing is the process of optimizing workloads across a production line. Loss cycle time refers to the time lost due to inefficiencies in the production process.

  • Line balancing involves analyzing the production process to ensure that each workstation is being utilized efficiently

  • The goal of line balancing is to minimize idle time and maximize productivity

  • Loss cycle time refers to the time lost due to factors...

A Production Engineer was asked
Q. What is OEE and PPLH?
Ans. 

OEE stands for Overall Equipment Effectiveness and PPLH stands for Production Per Labor Hour.

  • OEE is a metric used to measure the efficiency of manufacturing processes.

  • It takes into account three factors: availability, performance, and quality.

  • PPLH is a metric used to measure the productivity of labor in manufacturing processes.

  • It is calculated by dividing the total production output by the total labor hours.

  • Both O...

A Production Engineer was asked
Q. What's is torque and force
Ans. 

Torque is a twisting force that causes rotation, while force is a push or pull that causes an object to move or change direction.

  • Torque is measured in units of force multiplied by distance, such as newton-meters or pound-feet.

  • Force is measured in units of mass multiplied by acceleration, such as newtons or pounds.

  • Torque is important in rotating machinery, such as engines and motors.

  • Force is important in many appli...

Are these interview questions helpful?
A Production Engineer was asked
Q. What's is Tsv and testing process
Ans. 

TSV stands for Test Specification and Verification. Testing process involves planning, designing, executing and reporting tests.

  • TSV is a document that outlines the testing requirements and procedures

  • Testing process involves identifying test scenarios and cases

  • Test cases are executed and results are recorded

  • Defects are reported and retested until resolved

  • Final test report is generated

A Production Engineer was asked
Q. What's is FIFO and lifo
Ans. 

FIFO and LIFO are inventory management methods used to manage stock and determine the cost of goods sold.

  • FIFO stands for First-In, First-Out, which means that the first items purchased are the first items sold.

  • LIFO stands for Last-In, First-Out, which means that the last items purchased are the first items sold.

  • FIFO is commonly used in industries where perishable goods are sold, such as food and beverage.

  • LIFO is c...

A Production Engineer was asked
Q. What's is frl unit and solenoid valves
Ans. 

FRL unit is a filter, regulator, and lubricator unit used in compressed air systems. Solenoid valves are electromechanical valves used to control the flow of fluids.

  • FRL unit is used to filter, regulate, and lubricate compressed air in pneumatic systems

  • Solenoid valves are used to control the flow of fluids in various applications

  • Solenoid valves are electromechanical valves that use an electric current to control th...

JTEKT Production Engineer Interview Experiences

5 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Nov 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. How change your previous company
  • Ans. 

    I implemented new production processes and technologies to improve efficiency and quality.

    • Introduced automated systems to streamline production processes

    • Implemented lean manufacturing principles to reduce waste and improve productivity

    • Led training sessions for employees to ensure smooth transition to new processes

    • Collaborated with cross-functional teams to identify areas for improvement

  • Answered by AI
  • Q2. Over experience and filed and achievements
Round 2 - Technical 

(2 Questions)

  • Q1. Question as par roll and documents related
  • Q2. Working and behaviour related

Interview Preparation Tips

Interview preparation tips for other job seekers - Not extra laod on resume and not writing any unnecessary things

Production Engineer Interview Questions & Answers

user image Abhishek Anand

posted on 8 Sep 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Self introduction
  • Q2. Why you want to join jtekt
  • Ans. 

    I want to join JTEKT because of their reputation for innovation and commitment to excellence in the production engineering field.

    • JTEKT has a strong reputation for innovation and cutting-edge technology in the production engineering industry.

    • I am impressed by JTEKT's commitment to excellence and continuous improvement in their products and processes.

    • I believe that working at JTEKT will provide me with valuable opportuni...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What is 7 QC
  • Ans. 

    7 QC is a set of quality control tools used in manufacturing to identify and solve production problems.

    • 7 QC stands for Seven Quality Control tools

    • These tools include Pareto analysis, cause-and-effect diagram, check sheet, control chart, histogram, scatter diagram, and flowchart

    • They are used to analyze data, identify root causes of problems, and make informed decisions for process improvement

  • Answered by AI
  • Q2. What is ppl and pplh
  • Ans. 

    PPL stands for Production Per Labour and PPLH stands for Production Per Labour Hour.

    • PPL is a measure of how much production is achieved per unit of labor input.

    • PPLH is a measure of how much production is achieved per labor hour.

    • Both metrics are used to evaluate the efficiency of production processes.

    • For example, if a factory produces 100 units with 10 workers, the PPL would be 10 units per worker.

    • If the same factory op...

  • Answered by AI
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself
Round 2 - Technical 

(1 Question)

  • Q1. Metal non metal

I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(10 Questions)

  • Q1. What's is torque and force
  • Ans. 

    Torque is a twisting force that causes rotation, while force is a push or pull that causes an object to move or change direction.

    • Torque is measured in units of force multiplied by distance, such as newton-meters or pound-feet.

    • Force is measured in units of mass multiplied by acceleration, such as newtons or pounds.

    • Torque is important in rotating machinery, such as engines and motors.

    • Force is important in many applicatio...

  • Answered by AI
  • Q2. What's is assembly line processing
  • Ans. 

    Assembly line processing is a manufacturing process where a product is assembled in a sequential manner by different workers or machines.

    • It involves dividing the production process into smaller tasks

    • Each worker or machine performs a specific task in a sequential manner

    • The product moves from one station to another until it is completed

    • It increases efficiency and reduces production time and cost

    • Examples include automobil...

  • Answered by AI
  • Q3. What's is Tsv and testing process
  • Ans. 

    TSV stands for Test Specification and Verification. Testing process involves planning, designing, executing and reporting tests.

    • TSV is a document that outlines the testing requirements and procedures

    • Testing process involves identifying test scenarios and cases

    • Test cases are executed and results are recorded

    • Defects are reported and retested until resolved

    • Final test report is generated

  • Answered by AI
  • Q4. What's is take time cycle time and lead time
  • Ans. 

    Take time, cycle time, and lead time are important metrics in production engineering.

    • Take time is the time required to complete a single unit of production.

    • Cycle time is the time required to complete a single step in the production process.

    • Lead time is the time required to complete an entire production process from start to finish.

    • Reducing cycle time can increase production efficiency.

    • Reducing lead time can improve cus...

  • Answered by AI
  • Q5. What's is oee and pplh
  • Ans. 

    OEE stands for Overall Equipment Effectiveness and PPLH stands for Production Per Labor Hour.

    • OEE is a metric used to measure the efficiency of manufacturing processes.

    • It takes into account three factors: availability, performance, and quality.

    • PPLH is a metric used to measure the productivity of labor in manufacturing processes.

    • It is calculated by dividing the total production output by the total labor hours.

    • Both OEE an...

  • Answered by AI
  • Q6. What's is line balancing and loss cycle time
  • Ans. 

    Line balancing is the process of optimizing workloads across a production line. Loss cycle time refers to the time lost due to inefficiencies in the production process.

    • Line balancing involves analyzing the production process to ensure that each workstation is being utilized efficiently

    • The goal of line balancing is to minimize idle time and maximize productivity

    • Loss cycle time refers to the time lost due to factors such...

  • Answered by AI
  • Q7. What's is tpm and tqm
  • Ans. 

    TPM stands for Total Productive Maintenance and TQM stands for Total Quality Management.

    • TPM is a maintenance program that aims to maximize equipment effectiveness and minimize downtime.

    • TQM is a management approach that focuses on continuous improvement of product quality and customer satisfaction.

    • TPM involves all employees in the maintenance process and emphasizes preventive maintenance.

    • TQM involves all employees in th...

  • Answered by AI
  • Q8. What's is jh and jh steps and 5s
  • Ans. 

    JH and JH steps are quality control methodologies used in manufacturing. 5S is a workplace organization method.

    • JH stands for Job Handling and JH steps are a set of procedures used to ensure quality control in manufacturing processes.

    • 5S is a workplace organization method that involves sorting, simplifying, sweeping, standardizing, and sustaining.

    • JH steps and 5S are often used together to improve efficiency and quality i...

  • Answered by AI
  • Q9. What's is FIFO and lifo
  • Ans. 

    FIFO and LIFO are inventory management methods used to manage stock and determine the cost of goods sold.

    • FIFO stands for First-In, First-Out, which means that the first items purchased are the first items sold.

    • LIFO stands for Last-In, First-Out, which means that the last items purchased are the first items sold.

    • FIFO is commonly used in industries where perishable goods are sold, such as food and beverage.

    • LIFO is common...

  • Answered by AI
  • Q10. What's is frl unit and solenoid valves
  • Ans. 

    FRL unit is a filter, regulator, and lubricator unit used in compressed air systems. Solenoid valves are electromechanical valves used to control the flow of fluids.

    • FRL unit is used to filter, regulate, and lubricate compressed air in pneumatic systems

    • Solenoid valves are used to control the flow of fluids in various applications

    • Solenoid valves are electromechanical valves that use an electric current to control the val...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - All check sheet update and good communication knowledge

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Related to diploma subjects

Top trending discussions

View All
Interview Tips & Stories
2w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about JTEKT?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Job Fair and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - Case Study 

I am graduation in Mechanical Engineering and also done my diploma mechanical automobile in ghaziabad

Round 2 - HR 

(1 Question)

  • Q1. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - I am working in denso India pvt Ltd as a line leader in production department in Armature assembly in honda bs 6 model

I applied via Job Fair and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - Case Study 

I am graduation in Mechanical Engineering and also done my diploma mechanical automobile in ghaziabad

Round 2 - HR 

(1 Question)

  • Q1. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - I am working in denso India pvt Ltd as a line leader in production department in Armature assembly in honda bs 6 model
Are these interview questions helpful?
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jan 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Self introduction its very important
  • Ans. 

    I am a dedicated Production Engineer with a passion for optimizing processes and enhancing efficiency in manufacturing environments.

    • Educational Background: Graduated with a degree in Mechanical Engineering from XYZ University, where I specialized in production systems.

    • Work Experience: Worked at ABC Manufacturing for 3 years, focusing on process improvement and quality control.

    • Skills: Proficient in Lean Manufacturing an...

  • Answered by AI
  • Q2. Subject Questions Technical Questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your self confidence
research about company, speak clearly

I applied via Campus Placement and was interviewed before Mar 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Face to face depend on interview skill and confidence
  • Q2. Skill and communication in the opportunity in the company
Round 3 - HR 

(2 Questions)

  • Q1. Why should we hire you?
  • Ans. 

    I have a strong background in production engineering and a proven track record of improving efficiency and reducing costs.

    • I have a Bachelor's degree in Production Engineering and have completed internships at two leading manufacturing companies.

    • I have successfully implemented process improvements that resulted in a 20% increase in production output at my previous job.

    • I am skilled in using various production software an...

  • Answered by AI
  • Q2. I am working in denso India pvt Ltd I am working in honsety and I am also good confidence and hardworking

Interview Preparation Tips

Interview preparation tips for other job seekers - I am Shivam Singh from Mainpuri Uttar Pradesh.i have complete graduation in Mechanical Engineering and also done my diploma in Mechanical Automobile in ghaziabad I am working in denso India pvt Ltd as a diploma apprentice training.

I applied via Campus Placement and was interviewed before Dec 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Tell me about your self
  • Ans. 

    I am a production engineer with experience in optimizing manufacturing processes and improving efficiency.

    • Experienced in analyzing production data and identifying areas for improvement

    • Proficient in implementing lean manufacturing principles to reduce waste and increase productivity

    • Skilled in using CAD software to design and optimize production layouts

    • Strong problem-solving and troubleshooting abilities

    • Effective communi...

  • Answered by AI
  • Q2. What is metal describe itself
  • Ans. 

    Metal is a solid material that is typically hard, shiny, malleable, ductile, and a good conductor of heat and electricity.

    • Metal is a chemical element that is typically found in the Earth's crust.

    • It is known for its strength, durability, and ability to conduct heat and electricity.

    • Some common metals include iron, copper, aluminum, gold, and silver.

    • Metals can be used for a variety of purposes, such as building materials,...

  • Answered by AI
  • Q3. Tell me about Bernoulli’s theorem
  • Ans. 

    Bernoulli's theorem states that as the speed of a fluid increases, its pressure decreases.

    • It is a fundamental principle of fluid dynamics

    • It is based on the conservation of energy in a fluid

    • It is used to explain the lift of an airplane wing

    • It is also used in the design of carburetors and Venturi tubes

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just relax yourself and answer everything in confidence

JTEKT Interview FAQs

How many rounds are there in JTEKT Production Engineer interview?
JTEKT interview process usually has 2 rounds. The most common rounds in the JTEKT interview process are Technical, HR and Resume Shortlist.
How to prepare for JTEKT Production Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at JTEKT. The most common topics and skills that interviewers at JTEKT expect are 5s, 7Qc, Apqp, CNC and CNC Turning.
What are the top questions asked in JTEKT Production Engineer interview?

Some of the top questions asked at the JTEKT Production Engineer interview -

  1. What's is take time cycle time and lead t...read more
  2. What's is line balancing and loss cycle t...read more
  3. What's is torque and fo...read more

Tell us how to improve this page.

Overall Interview Experience Rating

4.3/5

based on 4 interview experiences

Difficulty level

Moderate 100%

Duration

Less than 2 weeks 67%
6-8 weeks 33%
View more
JTEKT Production Engineer Salary
based on 150 salaries
₹2 L/yr - ₹6 L/yr
8% less than the average Production Engineer Salary in India
View more details

JTEKT Production Engineer Reviews and Ratings

based on 25 reviews

4.2/5

Rating in categories

3.6

Skill development

3.7

Work-life balance

3.4

Salary

3.8

Job security

3.7

Company culture

3.1

Promotions

3.3

Work satisfaction

Explore 25 Reviews and Ratings
Diploma Trainee Engineer
287 salaries
unlock blur

₹1.5 L/yr - ₹3.3 L/yr

Junior Engineer
265 salaries
unlock blur

₹1.8 L/yr - ₹4.5 L/yr

Section Engineer
185 salaries
unlock blur

₹3.5 L/yr - ₹7.4 L/yr

Assistant Manager
180 salaries
unlock blur

₹5.7 L/yr - ₹11.7 L/yr

Senior Engineer
157 salaries
unlock blur

₹4.5 L/yr - ₹9.3 L/yr

Explore more salaries
Compare JTEKT with

Bosch

4.1
Compare

Hitachi Astemo

4.0
Compare

Faurecia

3.9
Compare

Valeo

4.0
Compare
write
Share an Interview