Filter interviews by
I applied via LinkedIn and was interviewed in Nov 2024. There were 2 interview rounds.
I implemented new production processes and technologies to improve efficiency and quality.
Introduced automated systems to streamline production processes
Implemented lean manufacturing principles to reduce waste and improve productivity
Led training sessions for employees to ensure smooth transition to new processes
Collaborated with cross-functional teams to identify areas for improvement
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There were 2 interview rounds.
I want to join JTEKT because of their reputation for innovation and commitment to excellence in the production engineering field.
JTEKT has a strong reputation for innovation and cutting-edge technology in the production engineering industry.
I am impressed by JTEKT's commitment to excellence and continuous improvement in their products and processes.
I believe that working at JTEKT will provide me with valuable opportuni...
7 QC is a set of quality control tools used in manufacturing to identify and solve production problems.
7 QC stands for Seven Quality Control tools
These tools include Pareto analysis, cause-and-effect diagram, check sheet, control chart, histogram, scatter diagram, and flowchart
They are used to analyze data, identify root causes of problems, and make informed decisions for process improvement
PPL stands for Production Per Labour and PPLH stands for Production Per Labour Hour.
PPL is a measure of how much production is achieved per unit of labor input.
PPLH is a measure of how much production is achieved per labor hour.
Both metrics are used to evaluate the efficiency of production processes.
For example, if a factory produces 100 units with 10 workers, the PPL would be 10 units per worker.
If the same factory op...
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
Torque is a twisting force that causes rotation, while force is a push or pull that causes an object to move or change direction.
Torque is measured in units of force multiplied by distance, such as newton-meters or pound-feet.
Force is measured in units of mass multiplied by acceleration, such as newtons or pounds.
Torque is important in rotating machinery, such as engines and motors.
Force is important in many applicatio...
Assembly line processing is a manufacturing process where a product is assembled in a sequential manner by different workers or machines.
It involves dividing the production process into smaller tasks
Each worker or machine performs a specific task in a sequential manner
The product moves from one station to another until it is completed
It increases efficiency and reduces production time and cost
Examples include automobil...
TSV stands for Test Specification and Verification. Testing process involves planning, designing, executing and reporting tests.
TSV is a document that outlines the testing requirements and procedures
Testing process involves identifying test scenarios and cases
Test cases are executed and results are recorded
Defects are reported and retested until resolved
Final test report is generated
Take time, cycle time, and lead time are important metrics in production engineering.
Take time is the time required to complete a single unit of production.
Cycle time is the time required to complete a single step in the production process.
Lead time is the time required to complete an entire production process from start to finish.
Reducing cycle time can increase production efficiency.
Reducing lead time can improve cus...
OEE stands for Overall Equipment Effectiveness and PPLH stands for Production Per Labor Hour.
OEE is a metric used to measure the efficiency of manufacturing processes.
It takes into account three factors: availability, performance, and quality.
PPLH is a metric used to measure the productivity of labor in manufacturing processes.
It is calculated by dividing the total production output by the total labor hours.
Both OEE an...
Line balancing is the process of optimizing workloads across a production line. Loss cycle time refers to the time lost due to inefficiencies in the production process.
Line balancing involves analyzing the production process to ensure that each workstation is being utilized efficiently
The goal of line balancing is to minimize idle time and maximize productivity
Loss cycle time refers to the time lost due to factors such...
TPM stands for Total Productive Maintenance and TQM stands for Total Quality Management.
TPM is a maintenance program that aims to maximize equipment effectiveness and minimize downtime.
TQM is a management approach that focuses on continuous improvement of product quality and customer satisfaction.
TPM involves all employees in the maintenance process and emphasizes preventive maintenance.
TQM involves all employees in th...
JH and JH steps are quality control methodologies used in manufacturing. 5S is a workplace organization method.
JH stands for Job Handling and JH steps are a set of procedures used to ensure quality control in manufacturing processes.
5S is a workplace organization method that involves sorting, simplifying, sweeping, standardizing, and sustaining.
JH steps and 5S are often used together to improve efficiency and quality i
FIFO and LIFO are inventory management methods used to manage stock and determine the cost of goods sold.
FIFO stands for First-In, First-Out, which means that the first items purchased are the first items sold.
LIFO stands for Last-In, First-Out, which means that the last items purchased are the first items sold.
FIFO is commonly used in industries where perishable goods are sold, such as food and beverage.
LIFO is common...
FRL unit is a filter, regulator, and lubricator unit used in compressed air systems. Solenoid valves are electromechanical valves used to control the flow of fluids.
FRL unit is used to filter, regulate, and lubricate compressed air in pneumatic systems
Solenoid valves are used to control the flow of fluids in various applications
Solenoid valves are electromechanical valves that use an electric current to control the val...
JTEKT interview questions for designations
I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.
Get interview-ready with Top JTEKT Interview Questions
Top trending discussions
posted on 15 Jan 2025
I applied via Naukri.com and was interviewed in Dec 2024. There was 1 interview round.
The process for handing over new projects involves thorough documentation, training, and communication with stakeholders.
Create a detailed project handover document outlining project scope, objectives, timelines, and key deliverables.
Provide training to the team members who will be taking over the project to ensure a smooth transition.
Communicate with all stakeholders involved in the project handover to address any con...
I applied via Naukri.com and was interviewed in Oct 2024. There was 1 interview round.
Manpower in shift can be handled by proper planning, communication, training, and monitoring.
Create a shift schedule that ensures adequate coverage and proper distribution of workload.
Communicate clearly with employees about their shift timings, responsibilities, and expectations.
Provide training to employees on their roles and responsibilities during the shift.
Monitor the performance and productivity of employees duri...
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
Motors convert electrical energy into mechanical energy, while generators convert mechanical energy into electrical energy.
Motors use electricity to produce motion, while generators use motion to produce electricity
Motors have a rotor that spins within a stator, while generators have a rotor that is turned by an external force
Examples of motors include electric fans and washing machines, while examples of generators in
posted on 10 Apr 2024
Interview experience
based on 21 reviews
Rating in categories
Diploma Trainee Engineer
286
salaries
| ₹1.2 L/yr - ₹3 L/yr |
Junior Engineer
269
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Section Engineer
180
salaries
| ₹3.5 L/yr - ₹7 L/yr |
Assistant Manager
175
salaries
| ₹5.7 L/yr - ₹11.1 L/yr |
Production Engineer
151
salaries
| ₹1.5 L/yr - ₹6.5 L/yr |
Mahindra & Mahindra
Tata Motors
Bosch
Ashok Leyland