Filter interviews by
I appeared for an interview before Feb 2024.
Daily Routine Management (DRM) optimizes productivity by structuring daily tasks and priorities effectively.
Establishing clear goals: Setting daily, weekly, and monthly objectives helps maintain focus.
Time blocking: Allocating specific time slots for tasks can enhance concentration and efficiency.
Prioritization: Using methods like the Eisenhower Matrix to distinguish between urgent and important tasks.
Regular reviews: ...
I follow a structured approach to new process development, ensuring thorough analysis, testing, and implementation.
Conduct a needs assessment to identify the problem or opportunity for improvement.
Research existing processes and technologies to gather insights and best practices.
Develop a detailed project plan outlining objectives, timelines, and resources required.
Prototype the new process and conduct pilot testing to...
PFMEA is a systematic approach to identify and mitigate potential process failures and their effects.
1. Define the scope: Identify the process to be analyzed, such as assembly or manufacturing.
2. Assemble a team: Include cross-functional members like engineers, quality, and production staff.
3. Identify potential failure modes: List ways the process could fail, e.g., incorrect assembly.
4. Determine effects of failures: ...
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 4 interview rounds.
My previous job KPI was to increase sales revenue by 20% within a year.
My KPI was to increase sales revenue by 20% within a year
I achieved this by implementing targeted marketing campaigns
I also optimized the sales process to improve efficiency
Regularly analyzed sales data to identify areas for improvement
Interview with Plant Chairman
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Referral and was interviewed before Jun 2022. There were 3 interview rounds.
Bus off is a state where a node on a bus is disabled due to errors. I2C and SPI are different communication protocols used in electronics.
Bus off is a state in CAN bus where a node is disabled due to errors.
I2C (Inter-Integrated Circuit) is a synchronous serial communication protocol commonly used for communication between integrated circuits.
SPI (Serial Peripheral Interface) is another synchronous serial communication...
I applied via Walk-in
I applied via AmbitionBox and was interviewed before Oct 2022. There were 3 interview rounds.
TCU stands for Temperature Control Unit. It is used in various industries for controlling and maintaining the temperature of different processes.
TCU is commonly used in industries such as manufacturing, automotive, and pharmaceuticals.
Motor alignment refers to the process of aligning the motor shaft with the driven equipment to ensure smooth operation.
Extrusion type refers to the process of shaping materials by forcing...
Some of the top questions asked at the Toyoda Gosei Minda Engineer interview -
based on 2 interviews
Interview experience
based on 20 reviews
Rating in categories
Engineer
101
salaries
| ₹2.2 L/yr - ₹7.9 L/yr |
Senior Engineer
96
salaries
| ₹3 L/yr - ₹8.4 L/yr |
Assistant Manager
49
salaries
| ₹4.5 L/yr - ₹11.4 L/yr |
Production Engineer
46
salaries
| ₹2.8 L/yr - ₹6 L/yr |
Supervisor
42
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Yazaki
JK Tyres
Faurecia
Knorr-Bremse