I have knowledge of telecom infrastructure.
I am familiar with the components of telecom infrastructure such as switches, routers, and servers.
I understand the importance of network security and data privacy in telecom infrastructure.
I have experience in configuring and maintaining telecom infrastructure.
I am knowledgeable about different types of telecom networks such as LAN, WAN, and MAN.
I am aware of the latest trend...
To control outage & energy, monitor cluster health, use power management tools, and implement redundancy.
Monitor cluster health regularly to detect any potential issues
Use power management tools to optimize energy usage
Implement redundancy to ensure high availability
Have a disaster recovery plan in place
Perform regular maintenance and updates
Consider using load balancers to distribute workload
Use virtualization to impr
Check for power supply, fuel level, battery, and ignition switch.
Check if there is enough fuel in the tank.
Check if the battery is charged and connected properly.
Check if the ignition switch is turned on.
Check if there is power supply to the DG.
Check if there are any error codes or alarms displayed on the control panel.
Automation of site can be achieved through various tools and techniques.
Use of configuration management tools like Ansible, Chef, Puppet
Continuous Integration and Deployment using Jenkins, Travis CI
Infrastructure as Code using Terraform, CloudFormation
Monitoring and Alerting using tools like Nagios, Prometheus
Automated Testing using tools like Selenium, JMeter
Use of containerization technologies like Docker, Kubernetes
Top trending discussions
Previous site infrastructure included data centers, networking equipment, servers, and storage systems.
Data centers were located in multiple regions for redundancy.
Networking equipment included routers, switches, and firewalls.
Servers were a mix of physical and virtual machines.
Storage systems used SAN and NAS technologies.
Backup and disaster recovery plans were in place.
Monitoring tools were used to track performance
Multiple scenarios of UPS DG CHILLER FAILURES
I appeared for an interview in Mar 2024.
I have 8 years of experience working as a Shift Engineer in various industries.
I have 8 years of experience as a Shift Engineer
Worked in various industries such as manufacturing, energy, and facilities management
Experience in troubleshooting, maintenance, and operation of equipment
Familiar with safety regulations and protocols
Led teams in shift operations and coordinated with other departments
We used air circuit breakers in my previous company.
We used air circuit breakers for their reliability and ease of maintenance.
Air circuit breakers are commonly used in industrial settings for their high breaking capacity.
Examples of air circuit breaker brands we used include Siemens and Schneider Electric.
Circuit breaker rating refers to the maximum current that the breaker can safely interrupt without causing damage.
Circuit breaker rating is typically expressed in amps (e.g. 15A, 20A, 30A).
The rating should be chosen based on the maximum current that will flow through the circuit.
It is important to select a circuit breaker with a rating higher than the maximum current to prevent tripping.
Using a circuit breaker with a ...
Cycle breaker maintenance involves regular inspection, testing, and replacement of components to ensure proper functioning.
Inspecting for signs of wear or damage
Testing functionality with appropriate equipment
Replacing faulty components as needed
Following manufacturer's guidelines for maintenance schedule
Keeping detailed records of maintenance activities
posted on 11 Jan 2023
I applied via Referral and was interviewed before Jan 2022. There were 4 interview rounds.
Head round for final salary discussion
I applied via Company Website and was interviewed before Mar 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.
33 kV to 220 SLD refers to a switchgear system for electrical distribution at medium voltage levels.
33 kV to 220 SLD likely refers to a switchgear system designed to handle voltages between 33 kV and 220 kV.
SLD stands for Single Line Diagram, which is a schematic representation of the electrical distribution system.
This switchgear system would be used for distributing electricity from a higher voltage transmission syst...
ACB stands for Air Circuit Breaker and VCB stands for Vacuum Circuit Breaker.
ACB is a type of circuit breaker that operates in the air where the arc is drawn in the air and extinguished using air.
VCB is a type of circuit breaker that operates in a vacuum where the arc is drawn in a vacuum and extinguished using vacuum.
ACBs are commonly used in low voltage applications while VCBs are used in medium voltage applications.
...
I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.
based on 1 review
Rating in categories
Assistant Manager
39
salaries
| ₹3.5 L/yr - ₹8 L/yr |
Facility Executive
35
salaries
| ₹2.2 L/yr - ₹4.5 L/yr |
Operations Executive
28
salaries
| ₹2.2 L/yr - ₹4 L/yr |
Facility Manager
28
salaries
| ₹3.6 L/yr - ₹8.8 L/yr |
Key Account Manager
22
salaries
| ₹4.8 L/yr - ₹12.7 L/yr |
Sodexo
ISS Facility Services
Compass Group Support Services
OCS Group