Cluster Incharge

filter-iconFilter interviews by

Cluster Incharge Interview Questions and Answers

Updated 31 Jan 2025

Popular Companies

search-icon

Q1. What is actual fuel consumption if site runs less then 10% discharging.

Ans.

Actual fuel consumption will depend on the specific fuel efficiency of the site's equipment and machinery.

  • Actual fuel consumption will be lower if the site is running at less than 10% discharging as less energy is being used.

  • Factors such as the type of equipment, load capacity, and operating conditions will also impact fuel consumption.

  • For example, a site using energy-efficient machinery may have lower fuel consumption even at low discharging levels.

Q2. What is office culture and behavior? How to connect with local public.

Ans.

Office culture and behavior refer to the values, norms, and practices that shape interactions and relationships within a workplace. Connecting with the local public involves understanding their needs and preferences.

  • Office culture encompasses the shared beliefs, attitudes, and behaviors of employees within an organization.

  • Behavior in the office includes communication styles, work ethic, teamwork, and respect for colleagues.

  • To connect with the local public, it is important to ...read more

Q3. What is the functioning of Ipms , piu , DG

Ans.

IPMS, PIU, and DG are systems used in managing clusters. IPMS stands for Integrated Project Management System, PIU stands for Project Implementation Unit, and DG stands for Diesel Generator.

  • IPMS is used for monitoring and controlling project activities.

  • PIU is responsible for implementing projects on the ground.

  • DG is used as a backup power source in case of electricity outages.

  • IPMS helps in tracking project progress and identifying any delays or issues.

  • PIU ensures that project...read more

Q4. What was battery bank capacity on 200 Amp dc load.

Ans.

The battery bank capacity on a 200 Amp dc load is dependent on the discharge rate and the type of batteries used.

  • Battery bank capacity is typically measured in Ampere-hours (Ah).

  • To calculate the capacity required for a 200 Amp dc load, divide the load by the discharge rate of the batteries.

  • For example, if using 100 Ah batteries, the capacity required would be 2 hours (200 Ah / 100 Ah = 2 hours).

Are these interview questions helpful?

Q5. How we improve Battery backup at site

Ans.

Improving battery backup at a site can be achieved by optimizing power consumption, upgrading to higher capacity batteries, implementing efficient charging systems, and conducting regular maintenance.

  • Optimize power consumption by using energy-efficient equipment and implementing power-saving practices.

  • Upgrade to higher capacity batteries to increase the amount of power stored and available during outages.

  • Implement efficient charging systems such as fast chargers or solar pane...read more

Q6. HOW TO SAVE ENERGY IN THE COMPONY

Ans.

Saving energy in the company can be achieved through various measures.

  • Switch off lights and electronics when not in use

  • Use energy-efficient appliances and equipment

  • Implement a system to monitor and control energy usage

  • Encourage employees to adopt energy-saving habits

  • Invest in renewable energy sources like solar panels

  • Regularly maintain and upgrade equipment to ensure optimal efficiency

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q7. HOW TO OPERATE THE SYSTEM

Ans.

Operating the system requires understanding its functions and features.

  • Read the user manual thoroughly

  • Attend training sessions if available

  • Practice using the system regularly

  • Ask for help or guidance from experts if needed

Q8. Difference between AC & DC Supply

Ans.

AC supply alternates direction of current flow, while DC supply flows in one direction.

  • AC stands for alternating current, while DC stands for direct current.

  • AC changes direction periodically, typically 50-60 times per second.

  • DC flows in one direction constantly.

  • AC is used in household appliances, while DC is used in batteries and electronic devices.

Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

4.0
 • 845 Interviews
3.7
 • 538 Interviews
3.8
 • 176 Interviews
4.1
 • 175 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Recently Viewed
DESIGNATION
Cluster Incharge Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter