Filter interviews by
To calculate project budget and cash flow, determine all expenses and income, create a timeline, and track progress.
Identify all expenses and income related to the project
Create a timeline for the project and allocate expenses accordingly
Track progress and adjust budget as needed
Consider potential risks and unexpected expenses
Use budgeting software or spreadsheets to help with calculations
Regularly review cash flo...
The quantum of construction refers to the amount or volume of construction work that needs to be completed.
The quantum of construction can be measured in terms of the total area to be constructed, the number of units or buildings to be constructed, or the total volume of materials required.
It is important for a General Manager Project to accurately estimate the quantum of construction in order to plan resources, t...
Cost control for entire project involves monitoring expenses, identifying variances, and implementing corrective actions.
Regularly track and monitor project expenses
Compare actual costs to budgeted costs
Identify cost variances and investigate reasons
Implement corrective actions to address cost overruns
Utilize cost management tools and software for accurate tracking
Communicate cost status to stakeholders regularly
Planning and scheduling of projects involves creating a timeline and allocating resources efficiently.
Develop a project plan outlining tasks, timelines, and resources needed
Use project management tools like Gantt charts to visualize the schedule
Allocate resources effectively to ensure timely completion
Regularly monitor progress and adjust schedule as needed
Examples: Construction projects, software development proj...
Rate analysis for pop and paint.
Rate analysis involves calculating the cost of materials, labor, and equipment needed for a project.
For pop and paint, the cost of materials includes gypsum board, joint compound, paint, and primer.
Labor costs will depend on the size of the area to be covered and the complexity of the design.
Equipment costs include scaffolding, ladders, and other tools needed for the job.
It is impor...
Quality of construction is a crucial aspect in project management.
Quality of construction directly impacts the durability and safety of the project.
It involves using high-quality materials, skilled labor, and adherence to industry standards.
Regular inspections and quality control measures ensure compliance with specifications.
Quality construction reduces maintenance costs and enhances the overall value of the proj...
I applied via Naukri.com and was interviewed in Feb 2023. There were 4 interview rounds.
When anybody appear for Head or GM Post for discussion or interviews, must be well aware of all Project and its apprval and laison processes.
Project or Constitution Execution Management, Cost Control and Forcasting is the basics and must, but legal approvals and its supporting documentation equally important for successful and timely completion and delivery of any Project.
Planning and scheduling of projects involves creating a timeline and allocating resources efficiently.
Develop a project plan outlining tasks, timelines, and resources needed
Use project management tools like Gantt charts to visualize the schedule
Allocate resources effectively to ensure timely completion
Regularly monitor progress and adjust schedule as needed
Examples: Construction projects, software development projects
Cost control for entire project involves monitoring expenses, identifying variances, and implementing corrective actions.
Regularly track and monitor project expenses
Compare actual costs to budgeted costs
Identify cost variances and investigate reasons
Implement corrective actions to address cost overruns
Utilize cost management tools and software for accurate tracking
Communicate cost status to stakeholders regularly
posted on 2 Dec 2023
I applied via Recruitment Consulltant and was interviewed before Dec 2022. There were 3 interview rounds.
03 rounds of interviews
The quantum of construction refers to the amount or volume of construction work that needs to be completed.
The quantum of construction can be measured in terms of the total area to be constructed, the number of units or buildings to be constructed, or the total volume of materials required.
It is important for a General Manager Project to accurately estimate the quantum of construction in order to plan resources, timeli...
Quality of construction is a crucial aspect in project management.
Quality of construction directly impacts the durability and safety of the project.
It involves using high-quality materials, skilled labor, and adherence to industry standards.
Regular inspections and quality control measures ensure compliance with specifications.
Quality construction reduces maintenance costs and enhances the overall value of the project.
F...
I applied via Referral and was interviewed in Feb 2023. There were 5 interview rounds.
Zero base budget calculations, product rate, rate analysis,negotiation skills.
I applied via Naukri.com and was interviewed in May 2022. There were 2 interview rounds.
To calculate project budget and cash flow, determine all expenses and income, create a timeline, and track progress.
Identify all expenses and income related to the project
Create a timeline for the project and allocate expenses accordingly
Track progress and adjust budget as needed
Consider potential risks and unexpected expenses
Use budgeting software or spreadsheets to help with calculations
Regularly review cash flow to ...
Rate analysis for pop and paint.
Rate analysis involves calculating the cost of materials, labor, and equipment needed for a project.
For pop and paint, the cost of materials includes gypsum board, joint compound, paint, and primer.
Labor costs will depend on the size of the area to be covered and the complexity of the design.
Equipment costs include scaffolding, ladders, and other tools needed for the job.
It is important ...
I applied via Naukri.com and was interviewed in Oct 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Sep 2021. There were 7 interview rounds.
Invest in a diversified portfolio of stocks, bonds, and real estate.
Diversify your portfolio to minimize risk
Consider investing in blue-chip stocks and government bonds
Real estate can provide long-term returns
Consult with a financial advisor for personalized advice
Top trending discussions
I appeared for an interview in Jun 2019.
I appeared for an interview before Mar 2024, where I was asked the following questions.
Effective project handling involves planning, communication, and adaptability to ensure successful outcomes.
Define clear project goals and objectives to align the team.
Utilize project management tools like Jira or Trello for tracking progress.
Conduct regular team meetings to discuss updates and challenges.
Implement Agile methodologies to adapt to changes quickly.
Document all processes and decisions for future reference...
The cable size required for a 10 hp motor depends on the voltage and current rating of the motor.
The cable size should be selected based on the motor's full load current (FLC) and the voltage rating.
For a 10 hp motor, the FLC would typically be around 15-20 Amps.
A common cable size for a 10 hp motor operating at 415V could be 4 sq mm cable.
I have a strong understanding of electrical systems and am capable of troubleshooting and problem-solving in this area.
I have a degree in Electrical Engineering
I have completed multiple projects involving electrical systems
I have experience working with electrical equipment and tools
I have a good understanding of electrical codes and regulations
based on 2 interview experiences
Difficulty level
Duration
based on 26 reviews
Rating in categories
Sales Manager
8
salaries
| ₹4 L/yr - ₹8 L/yr |
Purchase Manager
8
salaries
| ₹4.7 L/yr - ₹12 L/yr |
Sales Executive
7
salaries
| ₹3 L/yr - ₹5.1 L/yr |
Accountant
5
salaries
| ₹3 L/yr - ₹6 L/yr |
Senior Accountant
5
salaries
| ₹4.8 L/yr - ₹6.5 L/yr |
Signature Global
Sunteck Realty
Pittie Group
Advance India Projects