Rolling margin is a financial term that refers to the difference between the revenue generated and the variable costs incurred over a specific period of time.
Rolling margin is used to measure the profitability of a business or project.
It helps in assessing the efficiency of operations and identifying areas for cost reduction.
The formula for calculating rolling margin is: (Revenue - Variable Costs) / Revenue * 100.
For e...
If the site quantity differs from the drawing quantity, I will take the following steps to address the issue.
I will review the drawings and specifications to ensure accuracy.
I will communicate with the project team, including the architect and engineer, to clarify any discrepancies.
I will conduct a site visit to physically verify the quantities and compare them with the drawings.
If there are significant differences, I ...
Reconciliation of steel involves comparing the actual quantity of steel used in a construction project with the estimated quantity.
Reconciliation of steel is a process used in construction projects to ensure that the actual quantity of steel used matches the estimated quantity.
It involves comparing the quantity of steel recorded in the project's documentation, such as drawings and specifications, with the quantity of s...
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a concrete element.
BBS is prepared based on the structural drawings and specifications.
It includes the diameter, length, shape, and number of reinforcement bars required for the element.
BBS helps in estimating the quantity of steel required and also ensures the correct placement of reinforcement bars.
It is an essential document for t...
Rate analysis is done by breaking down the cost of each item in a construction project to determine the overall cost.
Rate analysis involves breaking down the cost of each item in a construction project.
The cost of materials, labor, and equipment is analyzed to determine the overall cost.
Quantities of each item are measured and multiplied by their respective rates to calculate the cost.
Rate analysis helps in estimating ...
Margin for OH & Profits in rate analysis is the additional amount added to cover overhead costs and generate profit.
Margin for OH & Profits is added to the direct cost of a project to cover indirect costs and generate profit.
It is usually expressed as a percentage of the direct cost.
The margin for OH & Profits varies depending on the nature of the project and market conditions.
For example, if the direct cost of a proje...
The wastage percentage for reinforcement steel varies depending on factors such as project complexity and workmanship.
Wastage percentage for reinforcement steel is typically estimated between 2-5%.
Factors such as project complexity, workmanship, and site conditions can affect the wastage percentage.
Proper planning, accurate cutting, and careful handling can help minimize wastage.
Examples of wastage include incorrect cu...
The code for structural steel is typically governed by the American Institute of Steel Construction (AISC) while reinforced steel is governed by the American Concrete Institute (ACI).
Structural steel is commonly used in the construction of buildings, bridges, and other structures.
The AISC provides standards and guidelines for the design, fabrication, and erection of structural steel.
Reinforced steel, also known as reba...
I applied via Campus Placement
It was a technicaL + aptitude test with 60 minutes duration.
I was interviewed in Dec 2024.
It is easy for both aptitude and core subjects.
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
To increase terminal residual pressure in a pipe, you can adjust the pump speed, increase the pipe diameter, or reduce the pipe length.
Adjust the pump speed to increase the pressure in the pipe.
Increase the pipe diameter to reduce friction losses and increase pressure.
Reduce the pipe length to minimize pressure drop along the pipe.
Check for any leaks or blockages in the pipe that may be causing pressure loss.
Concrete grades are classifications that indicate the strength of the concrete mix used in construction projects.
Concrete grades are classified based on their compressive strength, measured in megapascals (MPa).
Common concrete grades include C10, C15, C20, C25, C30, C35, C40, C45, C50, and C60.
Higher grade concrete mixes are used for projects that require stronger and more durable structures.
The specific grade of concr...
I am experienced in designing water supply networks using software such as EPANET, WaterCAD, and Bentley WaterGEMS.
EPANET
WaterCAD
Bentley WaterGEMS
TCE interview questions for popular designations
I was interviewed in Jul 2024.
Safety management involves implementing policies, procedures, and practices to ensure a safe work environment.
Safety management includes risk assessments to identify hazards and implement controls.
Regular safety training and communication are essential for promoting a safety culture.
Incident reporting and investigation help in identifying root causes and implementing corrective actions.
Safety audits and inspections are...
Leading and lagging are terms used in project management to describe the relationship between two activities.
Leading refers to an activity that must be completed before another activity can start.
Lagging refers to an activity that is delayed or starts after another activity has already begun.
Leading activities help in speeding up the project schedule, while lagging activities help in delaying the project schedule.
For e...
Get interview-ready with Top TCE Interview Questions
I applied via Campus Placement and was interviewed in Dec 2024. There were 3 interview rounds.
Quantitative reasoning andtranducer English.
I applied via Campus Placement and was interviewed in Jul 2024. There was 1 interview round.
Various code books used in civil engineering include ACI 318, AISC Steel Construction Manual, and ASCE 7.
ACI 318 - American Concrete Institute's Building Code Requirements for Structural Concrete
AISC Steel Construction Manual - American Institute of Steel Construction's manual for designing steel structures
ASCE 7 - American Society of Civil Engineers' Minimum Design Loads for Buildings and Other Structures
I applied via Campus Placement and was interviewed in Jul 2024. There were 3 interview rounds.
Basic technical knowledge and aptitude
My favourite subject is Mechanical Engineering because I enjoy learning about the principles of mechanics and how machines work.
I enjoy studying topics like thermodynamics, fluid mechanics, and materials science.
I like working on hands-on projects like designing and building machines or structures.
I find the problem-solving aspect of Mechanical Engineering to be challenging and rewarding.
TCE focuses on core engineering principles while IT focuses on information technology.
TCE involves designing, building, and maintaining physical structures and systems.
IT involves managing and utilizing technology for information processing and communication.
TCE requires knowledge of mechanics, materials, and construction techniques.
IT requires knowledge of programming, networking, and software development.
Examples: Ci...
I believe gaining practical experience in a professional setting will enhance my skills more effectively than further education.
I value hands-on experience and believe it is more beneficial for my career growth
I want to apply the knowledge I have gained in a real-world setting
I prefer to learn through practical application rather than theoretical study
Company is a leading software development firm specializing in creating innovative solutions for various industries.
Specializes in creating innovative software solutions
Works with clients from various industries
Known for high-quality and reliable products
Top trending discussions
The duration of TCE interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 200 interviews
Interview experience
8-14 Yrs
Not Disclosed
Assistant Manager
478
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
352
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
321
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
285
salaries
| ₹0 L/yr - ₹0 L/yr |
Consultant
254
salaries
| ₹0 L/yr - ₹0 L/yr |
Infosys
Wipro
HCLTech
Tech Mahindra