Filter interviews by
I applied via Approached by Company and was interviewed in Mar 2022. There were 3 interview rounds.
To check waterproofing area, follow these procedures
Inspect the surface for cracks or gaps
Ensure proper slope for drainage
Apply primer before waterproofing
Use appropriate waterproofing material
Check for leaks after application
Perform regular maintenance
Examples: bituminous coating, polyurethane coating, cementitious coating
I applied via Company Website and was interviewed in Oct 2022. There were 3 interview rounds.
IS code for concrete cube casting is IS 516:1959
IS 516:1959 is the code for methods of tests for strength of concrete
It specifies the procedure for making and curing concrete test specimens
The standard size of the cube for casting is 150mm x 150mm x 150mm
The cubes are casted in three layers and each layer is compacted 25 times using a standard tamping rod
I applied via Walk-in and was interviewed in Feb 2022. There were 3 interview rounds.
Mix design is the process of determining the proportions of ingredients to be used in concrete or asphalt.
Mix design ensures the desired strength and durability of the construction material.
It takes into account factors such as the type of aggregate, cement, water, and admixtures.
Mix design is used in various construction projects such as buildings, roads, bridges, and dams.
For example, a mix design for a high-rise bui...
Batching plant test of concrete is a process to ensure the quality of concrete before it is used in construction.
Batching plant test involves checking the strength, workability, and consistency of concrete.
Tests are conducted on samples of concrete taken from the batching plant.
Tests include slump test, compressive strength test, and water-cement ratio test.
Results of the tests are compared with the specifications to e...
TCE interview questions for designations
I applied via Company Website and was interviewed in Dec 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed before Jun 2022. There were 3 interview rounds.
I applied via Company Website and was interviewed before Apr 2021. There were 2 interview rounds.
Top trending discussions
I was interviewed in Jan 2025.
I am currently working at a construction company specializing in infrastructure projects.
Specializing in infrastructure projects
Working at a construction company
Dealing with civil engineering tasks
I have 5 years of experience working on various civil engineering projects, including site development, infrastructure design, and construction management.
Managed site development projects from concept to completion
Designed infrastructure systems such as water supply and drainage
Performed construction management duties to ensure projects stayed on schedule and within budget
Worked on projects ranging from residential de...
Handling a site in the transmission sector involves coordinating with various stakeholders, ensuring compliance with regulations, and overseeing the construction process.
Coordinate with utility companies to ensure proper installation of transmission lines
Ensure compliance with safety regulations and environmental standards
Oversee the construction process to ensure quality and timely completion
Manage and resolve any iss...
Key considerations for foundation in transmission line construction
Soil type and bearing capacity must be assessed
Proper foundation design to support the weight and wind loads of the transmission line towers
Consideration of environmental factors such as seismic activity and flooding
Accessibility for construction equipment and maintenance
Proper drainage to prevent erosion and foundation instability
The best method for erection in transmission is using cranes and specialized equipment.
Use cranes for lifting and placing heavy transmission components
Ensure proper planning and coordination to avoid delays
Utilize specialized equipment for precise positioning
Follow safety protocols to prevent accidents
Consider environmental factors such as wind and terrain
I adapt to challenging situations by staying calm, analyzing the problem, seeking advice from colleagues, and coming up with creative solutions.
Stay calm and composed under pressure
Analyze the problem thoroughly before taking action
Seek advice and input from colleagues or experts
Think creatively to come up with innovative solutions
The diagonal in the transmission sector plays a crucial role in providing structural stability and support to the transmission towers.
The diagonal members in transmission towers help to distribute the load and provide stability against wind and seismic forces.
They prevent the tower from buckling or collapsing under various loads.
Diagonals also help in reducing the overall weight of the tower by transferring some of the...
I applied via Company Website
I am a Civil Site Engineer with experience in managing construction projects and ensuring their successful completion.
I have a Bachelor's degree in Civil Engineering from XYZ University.
I have worked on various construction projects, including residential and commercial buildings.
I am proficient in using AutoCAD and other design software.
I have strong project management skills and can effectively coordinate with contra...
Safety equipment is used on construction sites to protect workers from potential hazards and accidents.
Personal protective equipment (PPE) such as hard hats, safety glasses, and gloves
Safety harnesses and fall protection systems for working at heights
Earplugs or earmuffs to protect against loud noises
Respirators or masks for protection against dust, fumes, or hazardous substances
Safety signs and barricades to warn and ...
Standards for plant layout in civil engineering include OSHA regulations, industry best practices, and client requirements.
OSHA regulations set guidelines for safety in plant layout design
Industry best practices ensure efficient use of space and resources
Client requirements may include specific equipment placement or workflow needs
In case of shortage of material received, we can take the following actions:
Contact the supplier to inquire about the shortage and request immediate delivery of the remaining material.
Check if there are any alternative suppliers who can provide the required material.
Evaluate the possibility of using substitute materials or adjusting the design to accommodate the shortage.
Prioritize the use of available material for cri...
Some of the top questions asked at the TCE Civil Site Engineer interview -
based on 4 interviews
3 Interview rounds
based on 20 reviews
Rating in categories
Assistant Manager
478
salaries
| ₹4.5 L/yr - ₹12.8 L/yr |
Manager
354
salaries
| ₹6.1 L/yr - ₹16.1 L/yr |
Senior Engineer
321
salaries
| ₹3.6 L/yr - ₹10 L/yr |
Senior Manager
285
salaries
| ₹10 L/yr - ₹22.5 L/yr |
Consultant
256
salaries
| ₹4 L/yr - ₹13 L/yr |
Infosys
Wipro
HCLTech
Tech Mahindra