TCE Quantity Surveyor Interview Questions and Answers

Updated 27 Dec 2019

8 Interview questions

A Quantity Surveyor was asked
Q. What is the procedure for creating a Bar Bending Schedule (BBS)?
Ans. 

BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a concrete element.

  • BBS is prepared based on the structural drawings and specifications.

  • It includes the diameter, length, shape, and number of reinforcement bars required for the element.

  • BBS helps in estimating the quantity of steel required and also ensures the correct placement of reinforcement bars.

  • It is an essential document ...

A Quantity Surveyor was asked
Q. What is the margin for Overhead and Profits in Rate analysis?
Ans. 

Margin for OH & Profits in rate analysis is the additional amount added to cover overhead costs and generate profit.

  • Margin for OH & Profits is added to the direct cost of a project to cover indirect costs and generate profit.

  • It is usually expressed as a percentage of the direct cost.

  • The margin for OH & Profits varies depending on the nature of the project and market conditions.

  • For example, if the direct cost of a ...

Quantity Surveyor Interview Questions Asked at Other Companies

asked in TCE
Q1. What will you do if the site quantity differs from the drawing qu ... read more
Q2. What evidential documents are required to scrutinize the RA Bill?
Q3. What are the basic inputs for preparing the Bill of Quantities?
asked in AECOM
Q4. What components should be considered in rate analysis?
Q5. Deduction as per IS code for Connecte, Shuttering & Plaster
A Quantity Surveyor was asked
Q. How do you perform rate analysis?
Ans. 

Rate analysis is done by breaking down the cost of each item in a construction project to determine the overall cost.

  • Rate analysis involves breaking down the cost of each item in a construction project.

  • The cost of materials, labor, and equipment is analyzed to determine the overall cost.

  • Quantities of each item are measured and multiplied by their respective rates to calculate the cost.

  • Rate analysis helps in estima...

A Quantity Surveyor was asked
Q. What is steel reconciliation?
Ans. 

Reconciliation of steel involves comparing the actual quantity of steel used in a construction project with the estimated quantity.

  • Reconciliation of steel is a process used in construction projects to ensure that the actual quantity of steel used matches the estimated quantity.

  • It involves comparing the quantity of steel recorded in the project's documentation, such as drawings and specifications, with the quantity...

A Quantity Surveyor was asked
Q. What will you do if the site quantity differs from the drawing quantity?
Ans. 

If the site quantity differs from the drawing quantity, I will take the following steps to address the issue.

  • I will review the drawings and specifications to ensure accuracy.

  • I will communicate with the project team, including the architect and engineer, to clarify any discrepancies.

  • I will conduct a site visit to physically verify the quantities and compare them with the drawings.

  • If there are significant difference...

A Quantity Surveyor was asked
Q. Code for Structural steel and reinforced steel
Ans. 

The code for structural steel is typically governed by the American Institute of Steel Construction (AISC) while reinforced steel is governed by the American Concrete Institute (ACI).

  • Structural steel is commonly used in the construction of buildings, bridges, and other structures.

  • The AISC provides standards and guidelines for the design, fabrication, and erection of structural steel.

  • Reinforced steel, also known as...

A Quantity Surveyor was asked
Q. What is rolling margin?
Ans. 

Rolling margin is a financial term that refers to the difference between the revenue generated and the variable costs incurred over a specific period of time.

  • Rolling margin is used to measure the profitability of a business or project.

  • It helps in assessing the efficiency of operations and identifying areas for cost reduction.

  • The formula for calculating rolling margin is: (Revenue - Variable Costs) / Revenue * 100.

  • ...

Are these interview questions helpful?
A Quantity Surveyor was asked
Q. Wastage % for Reinforcement Steel
Ans. 

The wastage percentage for reinforcement steel varies depending on factors such as project complexity and workmanship.

  • Wastage percentage for reinforcement steel is typically estimated between 2-5%.

  • Factors such as project complexity, workmanship, and site conditions can affect the wastage percentage.

  • Proper planning, accurate cutting, and careful handling can help minimize wastage.

  • Examples of wastage include incorre...

TCE Quantity Surveyor Interview Experiences

1 interview found

Interview Questionnaire 

9 Questions

  • Q1. What is rolling margin
  • Ans. 

    Rolling margin is a financial term that refers to the difference between the revenue generated and the variable costs incurred over a specific period of time.

    • Rolling margin is used to measure the profitability of a business or project.

    • It helps in assessing the efficiency of operations and identifying areas for cost reduction.

    • The formula for calculating rolling margin is: (Revenue - Variable Costs) / Revenue * 100.

    • For e...

  • Answered by AI
  • Q2. What will you do if the site qty differ from Drawing qty
  • Ans. 

    If the site quantity differs from the drawing quantity, I will take the following steps to address the issue.

    • I will review the drawings and specifications to ensure accuracy.

    • I will communicate with the project team, including the architect and engineer, to clarify any discrepancies.

    • I will conduct a site visit to physically verify the quantities and compare them with the drawings.

    • If there are significant differences, I ...

  • Answered by AI
  • Q3. Tell me about ur self
  • Q4. What is reconciliation of steel
  • Ans. 

    Reconciliation of steel involves comparing the actual quantity of steel used in a construction project with the estimated quantity.

    • Reconciliation of steel is a process used in construction projects to ensure that the actual quantity of steel used matches the estimated quantity.

    • It involves comparing the quantity of steel recorded in the project's documentation, such as drawings and specifications, with the quantity of s...

  • Answered by AI
  • Q5. What is the procedure for BBS
  • Ans. 

    BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a concrete element.

    • BBS is prepared based on the structural drawings and specifications.

    • It includes the diameter, length, shape, and number of reinforcement bars required for the element.

    • BBS helps in estimating the quantity of steel required and also ensures the correct placement of reinforcement bars.

    • It is an essential document for t...

  • Answered by AI
  • Q6. How you do the rate analysis
  • Ans. 

    Rate analysis is done by breaking down the cost of each item in a construction project to determine the overall cost.

    • Rate analysis involves breaking down the cost of each item in a construction project.

    • The cost of materials, labor, and equipment is analyzed to determine the overall cost.

    • Quantities of each item are measured and multiplied by their respective rates to calculate the cost.

    • Rate analysis helps in estimating ...

  • Answered by AI
  • Q7. What is margin for OH & Profits in Rate analysis
  • Ans. 

    Margin for OH & Profits in rate analysis is the additional amount added to cover overhead costs and generate profit.

    • Margin for OH & Profits is added to the direct cost of a project to cover indirect costs and generate profit.

    • It is usually expressed as a percentage of the direct cost.

    • The margin for OH & Profits varies depending on the nature of the project and market conditions.

    • For example, if the direct cost of a proje...

  • Answered by AI
  • Q8. Wastage % for Reinforcement Steel
  • Ans. 

    The wastage percentage for reinforcement steel varies depending on factors such as project complexity and workmanship.

    • Wastage percentage for reinforcement steel is typically estimated between 2-5%.

    • Factors such as project complexity, workmanship, and site conditions can affect the wastage percentage.

    • Proper planning, accurate cutting, and careful handling can help minimize wastage.

    • Examples of wastage include incorrect cu...

  • Answered by AI
  • Q9. Code for Structural steel and reinforced steel
  • Ans. 

    The code for structural steel is typically governed by the American Institute of Steel Construction (AISC) while reinforced steel is governed by the American Concrete Institute (ACI).

    • Structural steel is commonly used in the construction of buildings, bridges, and other structures.

    • The AISC provides standards and guidelines for the design, fabrication, and erection of structural steel.

    • Reinforced steel, also known as reba...

  • Answered by AI

Top trending discussions

View All
Interview Tips & Stories
2w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about TCE?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About structur like, Shuttring and steel dia wise wait per/m special gravity of cement & aggregate, related QC

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Quantity Surveyor Interview Questions Asked at Other Companies

asked in TCE
Q1. What will you do if the site quantity differs from the drawing qu ... read more
Q2. What evidential documents are required to scrutinize the RA Bill?
Q3. What are the basic inputs for preparing the Bill of Quantities?
asked in AECOM
Q4. What components should be considered in rate analysis?
Q5. Deduction as per IS code for Connecte, Shuttering & Plaster

I applied via Approached by Company and was interviewed in Oct 2018. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Baching plant Rmu Tamrock Shotcrete machine Grouting pumps Layout of project Crusher plant
  • Q2. Why you want to join Why you want to leave Why we hire you
  • Ans. 

    I want to join to further develop my skills, seeking new challenges. I am leaving for career growth opportunities. You should hire me for my experience and expertise.

    • Seeking new challenges and opportunities for skill development

    • Leaving for career growth and advancement

    • Experience and expertise in the field

    • Ability to contribute effectively to the team and projects

  • Answered by AI

Interview Preparation Tips

General Tips: Be positive
Be prepared
Be calm
Don't be stressed


Skills: Communication, Problem Solving, Leadership, Time Management
Duration: <1 week

I applied via Recruitment Consultant and was interviewed before Jun 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. All about Execution work.
  • Q2. Long answer.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be patience and effort for you.

I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Basic questions

Interview Preparation Tips

Interview preparation tips for other job seekers - candidates which were recruited by JMC in the year 2018 are getting less payments than the students recruited in the year 2019. The same happened to me and I left just because casual behavior from the management.

I applied via Recruitment Consultant and was interviewed in Nov 2019. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. My past work related questions
  • Q2. Bbs, reinforcement formula
  • Q3. Concrete realated

Interview Preparation Tips

Interview preparation tips for other job seekers - Your experience is the best teacher

I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Machinery maintenance Dpr maintenance,local purchasing,

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice,good and teritical intrew done and completed
Are these interview questions helpful?

I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions relating to our job in deep. That's it

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever you know about say genuinely and be confident always. Don't hesitate at all.
Put your thoughts clearly.

I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About site handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Should be good technical knowledge

I applied via Referral and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Question Related to last assignment.
  • Q2. How was my last job profile?
  • Q3. Willing to relocate?
  • Q4. Opportunity for better j9b profile

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer as per your CV dont add up any extra info untill asked

TCE Interview FAQs

How to prepare for TCE Quantity Surveyor interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at TCE. The most common topics and skills that interviewers at TCE expect are Quantity Surveyor Activities, 3D, Architecture, Bim and Civil.
What are the top questions asked in TCE Quantity Surveyor interview?

Some of the top questions asked at the TCE Quantity Surveyor interview -

  1. What will you do if the site qty differ from Drawing ...read more
  2. What is reconciliation of st...read more
  3. What is margin for OH & Profits in Rate analys...read more

Tell us how to improve this page.

TCE Quantity Surveyor Salary
based on 4 salaries
₹4 L/yr - ₹5.5 L/yr
17% less than the average Quantity Surveyor Salary in India
View more details

TCE Quantity Surveyor Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

4.0

Skill development

5.0

Work-life balance

4.0

Salary

5.0

Job security

4.0

Company culture

3.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
655 salaries
unlock blur

₹7.7 L/yr - ₹14 L/yr

Senior Engineer
427 salaries
unlock blur

₹5 L/yr - ₹11 L/yr

Manager
353 salaries
unlock blur

₹10.4 L/yr - ₹18.8 L/yr

Senior Manager
314 salaries
unlock blur

₹13.7 L/yr - ₹24 L/yr

Consultant
290 salaries
unlock blur

₹4.8 L/yr - ₹11.3 L/yr

Explore more salaries
Compare TCE with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare

Nagarjuna Construction Company

4.1
Compare
write
Share an Interview