i
Tata Power
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
In aptitude test , the question comes on reasoning and aptitude and English which carries 70 mark and 30 mark questions comes under respective branch ( Basically in electrical engineering)
Differential protection of a transformer is a method of protecting the transformer from internal faults by comparing the currents entering and leaving the transformer.
Differential protection compares the current entering and leaving the transformer to detect any internal faults.
Relays are devices that sense abnormal conditions in electrical circuits and initiate appropriate actions to protect the system.
CT (Current Tra...
Mathematics, Aptitude, Logical, Reasoning
Coding related questions
Top trending discussions
I applied via Company Website and was interviewed in Nov 2024. There were 2 interview rounds.
posted on 23 Jul 2024
Electrical engineering deals with the study and application of electricity, while electronics focuses on the study and application of electronic devices and circuits.
Electrical engineering primarily deals with the generation, transmission, and distribution of electrical power.
Electronics focuses on the design and development of electronic circuits and devices.
Electrical engineering involves working with large-scale pow...
Plant capacity refers to the maximum output or production capability of a manufacturing facility.
Plant capacity is the maximum amount of goods or services that a plant can produce within a given time period.
It is often measured in terms of units produced per hour, day, week, or month.
Factors that determine plant capacity include the size of the facility, the efficiency of the production process, and the availability of...
Quantitative,verbal and reasoning
posted on 28 Apr 2024
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
Yes , because I love this company,
Yes much Better company in electrical students ❣️
MSEDCL stands for Maharashtra State Electricity Distribution Company Limited.
MSEDCL is responsible for distributing electricity in the state of Maharashtra, India.
They handle power distribution, billing, and customer service for millions of consumers.
MSEDCL also works on infrastructure development and maintenance to ensure reliable power supply.
One of the key works of MSEDCL is to ensure electricity reaches even remote...
The timing period of MSEDCL Company is typically from 9:30 AM to 5:30 PM.
MSEDCL Company operates during regular business hours
The timing period is from Monday to Friday
There may be variations in timing based on specific departments or locations
posted on 15 Jun 2024
I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
Written & MCQ test conducted
Imaginary topic on industrial situation, easy one, time 20 minutes
I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.
Power plants supply electricity to meet the demand of consumers and industries.
Power plants generate electricity through various methods such as burning fossil fuels, nuclear reactions, or renewable sources like wind or solar power.
The electricity generated is transmitted through power lines to homes, businesses, and industries.
Power plants play a crucial role in ensuring a reliable supply of electricity to meet the ne...
Interview experience
based on 2 reviews
Rating in categories
Lead Engineer
742
salaries
| ₹3.4 L/yr - ₹12.8 L/yr |
Team Lead
212
salaries
| ₹4.5 L/yr - ₹18 L/yr |
Assistant Manager
184
salaries
| ₹5 L/yr - ₹19 L/yr |
Manager
138
salaries
| ₹9.2 L/yr - ₹29.2 L/yr |
Associate Lead
129
salaries
| ₹6 L/yr - ₹19 L/yr |
Adani Power
NTPC
Reliance Power
JSW Energy