I applied via Approached by Company and was interviewed before Jun 2020. There were 2 interview rounds.
Power factor correction methods, load flow analysis, and different types of transformer tests are important topics in operations management.
Power factor correction methods are used to improve the power factor of electrical systems, which helps in reducing energy losses and improving efficiency.
Load flow analysis is a technique used to study the flow of power in an electrical network, helping in determining voltage leve...
Top trending discussions
I appeared for an interview in Sep 2020.
I applied via Company Website and was interviewed in Oct 2020. There were 3 interview rounds.
I applied via Referral and was interviewed in Feb 2021. There were 3 interview rounds.
I have 5 years of experience in retail management, overseeing teams and driving sales.
Managed a team of 15 sales associates and consistently exceeded sales targets
Implemented new training programs to improve customer service and product knowledge
Developed and executed marketing strategies to increase foot traffic and drive sales
Handled inventory management and ensured accurate stock levels
Resolved customer complaints a...
I applied via Approached by Company and was interviewed before Aug 2022. There were 5 interview rounds.
Logical reasoning, numerical skill, verbal ability
I applied via Naukri.com and was interviewed in Aug 2023. There were 3 interview rounds.
I am a dedicated and experienced professional with strong leadership skills and a passion for achieving results.
Over 5 years of experience in management roles
Proven track record of successfully leading teams and achieving targets
Excellent communication and interpersonal skills
Strong problem-solving and decision-making abilities
Ability to adapt to changing environments and handle multiple tasks
Example: As an Assistant M...
I have 5 years of experience and my current CTC is $60,000 per year.
I have a total of 5 years of experience.
My current CTC is $60,000 per year.
I have worked in various roles and gained valuable skills.
I have successfully managed teams and achieved targets.
I have received recognition for my performance and contributions.
I applied via Approached by Company and was interviewed before Jun 2022. There were 3 interview rounds.
Load factor is the ratio of the actual output of a power plant to its maximum possible output over a period of time.
Load factor is calculated by dividing the average power output by the maximum power output over a specific period.
A high load factor indicates efficient utilization of the plant's capacity, while a low load factor suggests underutilization.
It is important for assessing the economic performance of a power ...
A steam turbine in a thermal power plant converts thermal energy into mechanical energy through a series of components and processes.
Main components of a steam turbine include rotor, blades, casing, and steam inlet/outlet.
Functions of a steam turbine include converting thermal energy into mechanical energy, generating electricity, and driving the generator.
Working principle involves high-pressure steam entering the tur...
Key challenges in minimizing heat losses in thermal power generation and ensuring efficient heat transfer.
Key challenges include heat losses in the boiler, condenser, and other components leading to decreased efficiency and increased operational costs.
Considerations include proper insulation of components, regular maintenance to prevent leaks, and optimizing combustion processes.
Efficient heat transfer can be achieved ...
Primary responsibilities include ensuring smooth operation of electrical systems in a thermal power plant. Testing and commissioning a generator involves several steps.
Ensure proper maintenance and operation of electrical equipment to prevent breakdowns
Troubleshoot electrical issues and perform repairs as needed
Monitor electrical systems for efficiency and safety
Conduct regular inspections and tests to identify potenti...
Main factors affecting thermal power plant efficiency and strategies for optimization.
Main factors include boiler efficiency, turbine efficiency, heat rate, and plant load factor.
Optimization strategies include regular maintenance, use of advanced technology, and efficient fuel management.
Example project: Implementing a heat recovery system to capture waste heat and improve overall efficiency.
Example initiative: Upgrad...
I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
based on 1 review
Rating in categories
Assistant Manager
239
salaries
| ₹5.6 L/yr - ₹16.5 L/yr |
Manager
162
salaries
| ₹7.5 L/yr - ₹18.3 L/yr |
Senior Executive
148
salaries
| ₹4.8 L/yr - ₹17.4 L/yr |
Officer
99
salaries
| ₹3.8 L/yr - ₹7 L/yr |
Assistant Officer
94
salaries
| ₹3 L/yr - ₹5.9 L/yr |
Adani Power
ReNew
Adani Green Energy
Vestas