i
Tata Power Delhi Distribution
Filter interviews by
I applied via Approached by Company and was interviewed before Jun 2020. There were 2 interview rounds.
Power factor correction methods, load flow analysis, and different types of transformer tests are important topics in operations management.
Power factor correction methods are used to improve the power factor of electrical systems, which helps in reducing energy losses and improving efficiency.
Load flow analysis is a technique used to study the flow of power in an electrical network, helping in determining voltage leve...
Top trending discussions
I applied via Referral and was interviewed in Jun 2021. There was 1 interview round.
posted on 17 Jan 2023
I applied via Company Website and was interviewed in Dec 2022. There were 4 interview rounds.
Transformer tests ensure proper functioning and safety of transformers. Protections prevent damage from faults.
Tests include insulation resistance, turns ratio, winding resistance, and oil quality tests
Protection devices include overcurrent, differential, and Buchholz relay
Tests and protections are crucial for preventing transformer failures and ensuring reliable power supply
Examples of transformer failures include ove...
Our solar site is a 50-acre facility with over 10,000 solar panels.
The site generates 5 MW of electricity per day
It has a battery storage system with a capacity of 2 MW
The site is equipped with a weather monitoring system to optimize energy production
We have a team of 10 technicians who perform regular maintenance and repairs
The site has been operational for 3 years and has reduced carbon emissions by 7,500 tons
posted on 16 Jan 2025
I applied via Walk-in and was interviewed before Jan 2024. There was 1 interview round.
I have over 10 years of experience in managing powerplant operations, including maintenance, troubleshooting, and optimization.
Managed daily operations of a 500 MW coal-fired powerplant
Implemented preventive maintenance programs to reduce downtime
Led a team of engineers in troubleshooting and resolving equipment issues
Optimized plant performance through efficiency improvements and cost reduction initiatives
Our plant coal TPH is currently at 150 tons per hour.
Our plant currently processes 150 tons of coal per hour.
This is a key metric for measuring the efficiency of our operations.
We are constantly working to optimize our processes to increase this throughput.
There are two main types of pumps in AHP: primary pumps and secondary pumps.
Primary pumps are responsible for circulating water through the system, such as the main circulating pump.
Secondary pumps are used for specific functions, like the feedwater pump or the condensate extraction pump.
Examples include centrifugal pumps, reciprocating pumps, and rotary pumps.
posted on 13 Jul 2024
I applied via Naukri.com and was interviewed in Jan 2024. There was 1 interview round.
The 5 core tools refer to a set of quality control tools used in manufacturing and production processes.
1. Process Flow Diagrams
2. Control Charts
3. Pareto Charts
4. Histograms
5. Scatter Diagrams
Improving quality involves implementing processes to ensure products or services meet or exceed customer expectations.
Implement quality control measures to identify and address defects early on
Provide training and resources to employees to ensure they understand quality standards
Regularly review and analyze customer feedback to identify areas for improvement
Utilize technology and automation to streamline processes and
I applied via Referral and was interviewed in Jun 2021. There was 1 interview round.
posted on 28 Oct 2023
I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.
posted on 3 Aug 2023
I applied via Newspaper Ad and was interviewed before Aug 2022. There were 3 interview rounds.
based on 1 review
Rating in categories
Assistant Manager
239
salaries
| ₹5.8 L/yr - ₹15.6 L/yr |
Senior Executive
160
salaries
| ₹4.8 L/yr - ₹17.4 L/yr |
Manager
152
salaries
| ₹7 L/yr - ₹18.6 L/yr |
Officer
103
salaries
| ₹3.8 L/yr - ₹7 L/yr |
Assistant Officer
88
salaries
| ₹3 L/yr - ₹5.9 L/yr |
Bses Rajdhani Power
Bses Yamuna Power
Reliance Infrastructure
Adani Electricity