i
Filter interviews by
I applied via Referral and was interviewed before Apr 2020. There was 1 interview round.
I applied via Job Portal and was interviewed before Dec 2021. There were 3 interview rounds.
posted on 31 Jan 2024
About site experience
posted on 15 Feb 2022
I was interviewed before Feb 2021.
The ratio of M25 grade concrete is 1:1:2.
The ratio of M25 grade concrete is 1 part cement, 1 part sand, and 2 parts aggregate.
This ratio is commonly used in construction for various applications.
For example, if you need to make 1 cubic meter of M25 grade concrete, you would need 1/4 cubic meter of cement, 1/4 cubic meter of sand, and 1/2 cubic meter of aggregate.
I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.
Cube compressive achieving percentage time periods
The question is asking about the percentage of time periods in which cube compressive strength is achieved
Cube compressive strength refers to the ability of a cube-shaped material to withstand compression
The answer may involve calculating the percentage of time periods in which the cube meets the required compressive strength
Examples of data points needed: time periods,
I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.
Branding schedule is a plan outlining the timeline and activities for promoting a brand.
Branding schedule includes tasks such as creating a brand strategy, designing a logo, developing marketing materials, and planning advertising campaigns.
It helps ensure consistency in brand messaging and image across different platforms and channels.
Example: A branding schedule for a new product launch may include market research, l...
Concrete grade and mixing ratio are crucial factors in determining the strength and durability of a structure.
Concrete grade refers to the strength of the concrete mix, typically denoted by a number like M20, M30, etc.
Mixing ratio is the proportion of cement, sand, and aggregate in the concrete mix, usually expressed as 1:x:y.
For example, a common mixing ratio for M20 grade concrete is 1:1.5:3, which means 1 part cemen
Regularly inspect and maintain all equipment and tools used on site to ensure they are in good working condition.
Create a maintenance schedule for all equipment and tools used on site.
Check for any signs of wear and tear on equipment and tools.
Clean and lubricate equipment regularly to prevent rust and corrosion.
Replace any damaged or worn out parts immediately.
Train site workers on proper handling and maintenance of e...
I was interviewed in Dec 2024.
The interview process was thorough and challenging, but overall a positive experience.
The interview consisted of multiple rounds, including technical, behavioral, and possibly a site visit.
I was asked to discuss my previous projects and experiences in detail.
There were questions about problem-solving skills and how I handle challenging situations on site.
Overall, the interviewers were professional and provided a clear
My salary expectations are in line with industry standards and based on my experience and qualifications.
Research industry standards for Civil Site Engineers in the specific location
Consider years of experience and level of qualifications
Be prepared to negotiate based on job responsibilities and benefits package
Seeking new challenges and opportunities for growth.
Desire for career advancement
Looking for new challenges
Opportunity for professional growth
Company restructuring or downsizing
Relocation to a new city
I was interviewed in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.
BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.
The bending moment will be maximum at the points where the frame experiences maximum sway.
The BMD can be drawn by analyzing the internal forces and moments acting on the frame.
Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.
Start by determining the dimensions and layout of the piperack
Use software like AutoCAD to create accurate and detailed drawings
Include all necessary details such as pipe sizes, supports, and connections
Label all components clearly for easy understanding
Review and revise the drawings as needed for accuracy
based on 3 reviews
Rating in categories
Executive Accountant
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer Civil
14
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Accounts Executive
12
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem