i
Rahee Infratech
Filter interviews by
I applied via Approached by Company and was interviewed in Oct 2024. There were 4 interview rounds.
I have studied Business Administration with a focus on retail management.
Studied Business Administration with a focus on retail management
Took courses in marketing, sales, inventory management, and customer service
Completed internships at retail stores to gain practical experience
I was interviewed before Mar 2024.
I applied via Company Website and was interviewed in Apr 2023. There were 7 interview rounds.
I am ready for this interview
I am ready for this test
Ready for this coding test
All precautions for group discussion
Rahee Infratech interview questions for popular designations
I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
Get interview-ready with Top Rahee Infratech Interview Questions
I applied via Company Website and was interviewed in Jun 2023. There were 2 interview rounds.
The concrete grade used in BLT is Grade M25.
Grade M25 concrete is used in BLT.
The concrete grade is determined based on the required strength and durability of the structure.
Concrete grades are specified by the mix proportions of cement, sand, and aggregate.
Grade M25 concrete has a compressive strength of 25 megapascals (MPa) after 28 days of curing.
Other common concrete grades include M10, M15, M20, M30, etc.
Wirsine formula is used in track engineering to calculate the required block spacing.
Wirsine formula is a mathematical equation used in track engineering.
It helps in determining the optimal spacing between blocks on a track.
The formula takes into account factors like train speed, deceleration rate, and safety requirements.
The block spacing is calculated to ensure sufficient distance between trains for safe operation.
Th...
I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.
The length of composite girder bridges varies depending on factors such as span length, load capacity, and design requirements.
The length of composite girder bridges can range from a few meters to several hundred meters.
Longer spans typically require larger girders and more complex design considerations.
Examples of composite girder bridges include the Penobscot Narrows Bridge in Maine, USA, with a main span length of 3...
HSFG bolt stands for High Strength Friction Grip bolt, commonly used in structural engineering for connecting steel components.
HSFG bolt is a type of bolt that relies on friction between the bolt head and the connected material to prevent loosening.
These bolts are commonly used in structural steel connections due to their high strength and reliability.
HSFG bolts are tightened to a specific torque to ensure proper clamp...
I applied via Company Website and was interviewed before May 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed in Sep 2022. There were 2 interview rounds.
The initial and final setting time of an ideal cement mix refers to the time it takes for the cement to begin to harden and fully harden, respectively.
The initial setting time is the time it takes for the cement to lose its plasticity and become rigid enough to resist certain pressures.
The final setting time is the time it takes for the cement to fully harden and achieve its maximum strength.
The initial setting time is...
Piles can be classified based on their function and use.
Piles for supporting structures: These piles are used to support buildings, bridges, and other structures.
Piles for retaining walls: These piles are used to provide stability to retaining walls and prevent soil erosion.
Piles for foundation improvement: These piles are used to improve the load-bearing capacity of weak soils.
Piles for marine structures: These piles ...
Clear cover to main reinforcement is the distance between the outer surface of concrete and the nearest surface of the reinforcement.
Clear cover is important to protect the reinforcement from corrosion and fire damage.
It is specified in the design and varies depending on the type of structure and environmental conditions.
For example, in a residential building, the clear cover may be around 25mm to 50mm.
In a marine stru...
Top trending discussions
Some of the top questions asked at the Rahee Infratech interview -
The duration of Rahee Infratech interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 29 interviews
Interview experience
based on 281 reviews
Rating in categories
6-8 Yrs
Not Disclosed
15-25 Yrs
Not Disclosed
Site Engineer
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
22
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Accounts Executive
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
GMR Group
Hindustan Construction Company
Punj Lloyd