i
Filter interviews by
I applied via Approached by Company
Discussion about working experience
I applied via Job Portal and was interviewed before Dec 2021. There were 3 interview rounds.
posted on 31 Jan 2024
About site experience
I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.
Cube compressive achieving percentage time periods
The question is asking about the percentage of time periods in which cube compressive strength is achieved
Cube compressive strength refers to the ability of a cube-shaped material to withstand compression
The answer may involve calculating the percentage of time periods in which the cube meets the required compressive strength
Examples of data points needed: time periods,
I was interviewed in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.
BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.
The bending moment will be maximum at the points where the frame experiences maximum sway.
The BMD can be drawn by analyzing the internal forces and moments acting on the frame.
Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.
Start by determining the dimensions and layout of the piperack
Use software like AutoCAD to create accurate and detailed drawings
Include all necessary details such as pipe sizes, supports, and connections
Label all components clearly for easy understanding
Review and revise the drawings as needed for accuracy
posted on 29 Mar 2023
I applied via LinkedIn and was interviewed in Mar 2023. There were 3 interview rounds.
Types of testing in highway
Geotechnical testing to assess soil and rock properties
Pavement testing to evaluate the strength and durability of road surfaces
Structural testing to ensure the safety and integrity of bridges and other structures
Traffic flow testing to analyze traffic patterns and optimize road design
Environmental testing to assess the impact of highways on the surrounding ecosystem
Safety testing to evaluate...
I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.
P6 is a project management software used for scheduling, Float is the amount of time an activity can be delayed without delaying the project, Critical activities are tasks that must be completed on time to prevent project delays.
P6 is a software used for project scheduling and management
Float is the amount of time an activity can be delayed without affecting the project deadline
Critical activities are tasks that have z...
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Executive Accountant
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer Civil
14
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Accounts Executive
12
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem