Filter interviews by
I applied via Recruitment Consultant and was interviewed in Jan 2021. There were 3 interview rounds.
MRP stands for Material Requirements Planning.
MRP is a system used to manage and plan the production and inventory of materials.
It helps in determining the quantity and timing of materials needed for production.
MRP takes into account factors like lead time, demand, and inventory levels.
It ensures that materials are available when needed, minimizing stockouts and excess inventory.
MRP software often integrates with other...
I maintain inventory by using a combination of inventory management software, regular stock checks, and forecasting techniques.
Use inventory management software to track stock levels, sales, and reordering
Conduct regular stock checks to ensure accuracy and identify any discrepancies
Implement forecasting techniques to anticipate demand and adjust inventory levels accordingly
Collaborate with suppliers to maintain a stead...
BOM maintenance involves updating and managing the Bill of Materials for products.
Regularly review and update the BOM to reflect any changes in product components or specifications.
Ensure accurate documentation of all parts, quantities, and costs in the BOM.
Coordinate with suppliers to obtain updated information on component availability and pricing.
Implement a version control system to track changes and revisions to t...
Inventory targets are the desired levels of inventory that a company aims to maintain. Minimum inventory is the lowest level required to meet demand, while maximum inventory is the highest level that can be held without incurring excessive costs.
Inventory targets are set to ensure that there is enough stock to meet customer demand.
Minimum inventory is determined by analyzing historical sales data and forecasting future...
Perpetual inventory is a system that continuously tracks and updates inventory levels in real-time.
Perpetual inventory provides a real-time view of inventory levels, allowing businesses to make informed decisions.
It involves using technology, such as barcode scanners or RFID tags, to track inventory movement.
The system automatically updates inventory records as goods are received, sold, or moved within the organization...
I applied via Campus Placement and was interviewed in Feb 2022. There were 2 interview rounds.
suzuki motor gujarat interview questions for popular designations
I applied via Campus Placement and was interviewed before Jun 2021. There were 2 interview rounds.
Get interview-ready with Top suzuki motor gujarat Interview Questions
I applied via Recruitment Consultant and was interviewed in May 2021. There were 5 interview rounds.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Aug 2021. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in May 2021. There were 5 interview rounds.
Some of the top questions asked at the suzuki motor gujarat interview -
The duration of suzuki motor gujarat interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 216 interviews
Interview experience
based on 2k reviews
Rating in categories
Senior Executive
778
salaries
| ₹4 L/yr - ₹10 L/yr |
Junior Manager
739
salaries
| ₹5 L/yr - ₹14.8 L/yr |
Executive
624
salaries
| ₹3.2 L/yr - ₹8.5 L/yr |
Assistant Manager
571
salaries
| ₹5.9 L/yr - ₹16.7 L/yr |
Diploma Trainee Engineer
338
salaries
| ₹2.5 L/yr - ₹5.8 L/yr |
Maruti Suzuki
Hyundai Motor India Limited
Honda Cars
Tata Motors