Upload Button Icon Add office photos

Filter interviews by

SUN CONSTRUCTION Interview Questions and Answers

Updated 8 Feb 2022

SUN CONSTRUCTION Interview Experiences

Popular Designations

3 interviews found

Civil Site Engineer Interview Questions & Answers

user image Goutham sakthivel

posted on 29 Jan 2018

Interview Questionnaire 

4 Questions

  • Q1. They show me a drawing of residential buildings and ask some questions...I will answer the questions and some technical questions....
  • Q2. What you understand in these drawings?
  • Ans. 

    The question is asking about the understanding of drawings related to civil engineering projects.

    • The drawings may include architectural plans, structural plans, and site plans.

    • Understanding the drawings involves interpreting symbols, dimensions, and annotations.

    • Knowledge of different types of drawings like floor plans, elevations, sections, and details is important.

    • Ability to identify key elements like columns, beams, ...

  • Answered by AI
  • Q3. Mix design
  • Q4. Initial and final setting time
  • Ans. 

    Initial and final setting time are important properties of cement that determine its workability and strength.

    • Initial setting time is the time taken for the cement paste to harden sufficiently to resist certain specified pressure.

    • Final setting time is the time taken for the cement paste to harden completely and attain its full strength.

    • Both setting times are influenced by factors like cement composition, water-cement r...

  • Answered by AI

Interview Preparation Tips

Round: Test
Experience: They conducted written tests based on civil engineering subjects...actually negative marks are available...the test was conducted out of 50...30 is the pass marks...

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (66)

I applied via Company Website and was interviewed in Jan 2022. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Roles and responsibilities?
  • Q2. What is your current salary?

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company for freshers as for the experience person not that much.

Purchase Manager Interview Questions asked at other Companies

Q1. Again if you are coming with reference then high probability of getting selected irrespective of what you have done in Interview. Some basic technical questions related to Job description. Not much technical as they dont have strong technic... read more
View answer (4)

I applied via Newspaper Ad and was interviewed in Aug 2021. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Explain about yourself, present salary, expected salary, notice period

Interview Preparation Tips

Interview preparation tips for other job seekers - Guys pls. dont join this co. Once joined, will be difficult to tolorate temperament of Tania Nandy. Every moment you will be insulted/ humiliated. No job security. No future. Just a small co. Shows up like big corporate.

Accounts Head Interview Questions asked at other Companies

Q1. Bank reconciliation how to handle Finance outstanding how to simplify Stock Audit experience How to revenue increase GST related Provision entry how to make Salary advance how to monitor Month end work related Sundry Creditors & Debtors... read more
Add answer

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

Interview Questionnaire 

4 Questions

  • Q1. What is Google sheets
  • Ans. 

    Google Sheets is a cloud-based spreadsheet program offered by Google as part of the Google Drive office suite.

    • Allows users to create and edit spreadsheets online

    • Offers collaboration features for real-time editing and commenting

    • Can import and export various file formats, including Microsoft Excel

    • Offers add-ons and scripts for automation and customization

    • Accessible from any device with internet connection

  • Answered by AI
  • Q2. What is the MDD & OMC of soil
  • Ans. 

    MDD & OMC are important parameters for soil compaction and moisture content.

    • MDD stands for Maximum Dry Density, which is the maximum density that can be achieved for a given soil compaction effort.

    • OMC stands for Optimum Moisture Content, which is the moisture content at which the maximum dry density can be achieved.

    • These parameters are important for determining the appropriate moisture content and compaction effort for...

  • Answered by AI
  • Q3. What is the velocity of steel
  • Ans. 

    The velocity of steel varies depending on the type and conditions.

    • The velocity of steel can range from 5000 to 6000 meters per second

    • The velocity of steel can be affected by factors such as temperature and pressure

    • The velocity of steel is important in industries such as construction and manufacturing

  • Answered by AI
  • Q4. What is the cube test result in 7 days
  • Ans. 

    The cube test result in 7 days depends on the purpose of the test and the specific cube being tested.

    • The cube test can refer to various tests in different fields such as construction, engineering, and materials science.

    • For example, in construction, the cube test is used to determine the compressive strength of concrete cubes after 7 days of curing.

    • The result of the cube test can vary depending on factors such as the ty...

  • Answered by AI

Skills evaluated in this interview

Interview Questionnaire 

4 Questions

  • Q1. About your self
  • Q2. About java
  • Q3. Phython
  • Q4. Project details

Interview Preparation Tips

Interview preparation tips for other job seekers - Be strong ont losse ur hope
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was just a aptitude test

Round 2 - Technical 

(2 Questions)

  • Q1. Basic regarding professional area
  • Q2. Project worked at and experienced
  • Ans. 

    Managed a team to implement a new customer relationship management system

    • Led a team of 5 employees to successfully implement a new CRM system

    • Coordinated with IT department to ensure smooth integration of the system

    • Provided training to staff on how to use the new system effectively

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why i want to join the firm
  • Ans. 

    I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.

    • Strong reputation in the industry

    • Opportunities for career growth and development

    • Alignment with my career goals and values

  • Answered by AI
  • Q2. Salary discussions

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Equipment layout details
  • Q2. Plot plan details and man and material movement path

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.

I applied via Referral and was interviewed before May 2021. There were 3 interview rounds.

Round 1 - Aptitude Test 

I received a video call link and in that link will get the accounting basic questions for that we have to answer after a beep.

Round 2 - Technical 

(1 Question)

  • Q1. It was all basic accounting question.mostly related to 12th standard c v raman book Friendly interviewers
Round 3 - HR 

(1 Question)

  • Q1. 5 min telephonic call with recruiter

Interview Preparation Tips

Interview preparation tips for other job seekers - Get yourself prepared with basic accounting questions and be confident

I applied via Recruitment Consultant and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Java questions
  • Q2. Stream questions
  • Q3. Collections sorting

Interview Preparation Tips

Interview preparation tips for other job seekers - Core java, spring, spring boot microservices

SUN CONSTRUCTION Interview FAQs

How many rounds are there in SUN CONSTRUCTION interview?
SUN CONSTRUCTION interview process usually has 1 rounds. The most common rounds in the SUN CONSTRUCTION interview process are One-on-one Round.
What are the top questions asked in SUN CONSTRUCTION interview?

Some of the top questions asked at the SUN CONSTRUCTION interview -

  1. What you understand in these drawin...read more
  2. Initial and final setting t...read more
  3. They show me a drawing of residential buildings and ask some questions...I will...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Technologies Interview Questions
3.6
 • 261 Interviews
TCE Interview Questions
3.7
 • 251 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
AECOM Interview Questions
4.2
 • 117 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
View all

SUN CONSTRUCTION Reviews and Ratings

based on 21 reviews

3.1/5

Rating in categories

2.5

Skill development

2.5

Work-life balance

2.6

Salary

2.1

Job security

2.2

Company culture

2.2

Promotions

2.2

Work satisfaction

Explore 21 Reviews and Ratings
Civil Site Engineer
6 salaries
unlock blur

₹2.2 L/yr - ₹3.6 L/yr

Finance Head
4 salaries
unlock blur

₹4.8 L/yr - ₹4.8 L/yr

Site Supervisor
4 salaries
unlock blur

₹2.4 L/yr - ₹3 L/yr

Project Manager
3 salaries
unlock blur

₹4.1 L/yr - ₹12 L/yr

Project Manager Civil
3 salaries
unlock blur

₹4.2 L/yr - ₹10 L/yr

Explore more salaries
Compare SUN CONSTRUCTION with

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Alstom Transportation

3.7
Compare

Tata Technologies

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview